Thursday, May 01, 2003
Renaissance Development Curtis Heintz Excavation
1672 SW Willamette Falls Dr. 27475 SW 145 Ave.
West Linn, OR 97068 Sherwood, OR 97140
Attn: Randy Sebastian, President Attn: Curtis Heintz
/Robert and Mary Meehl
10810 SW Kable St.
Tigard, OR 97224
Robert E. Vann
10722 SW Kable St.
Tigard, OR 97224
Tony and Dionnie Storino
10630 SW Kable St.
Tigard, OR 97224
RE: Retaining Walls on Lots # 4, 6, and 9, Erickson Heights II, 10810, 10722, and 10630
SW Kable St., Tigard.
The purpose of this note is to let you know that we have received a copy of a report dated
April 24, 2003, from GeoPacific Engineering on Rock Wall Evaluations for Lots 4, 6, and 9.
That report includes an extensive analysis and an assessment that: "Based on our observations,
explorations, assumptions, analyses, and findings, we conclude that the existing geometry and
rock wall construction on Lots 4, 6, and 9, although less than a Factor -of- Safety of 1.5, is
sufficient such that they do not represent a hazard to the existing residences or adjoining
properties." Based on this assessment, the geometric cross - sections provided by Geopacific,
and our own observations we accept the walls on Lots 4, 6, and 9 on an "as- built" basis and as
requiring no further corrective action. Accordingly, we have issued a final inspection approval
of those walls under permit SIT2002 -00030 for Lot #4, SIT2002 -00031 for Lot #6, and
SIT2002 -00033 for Lot #9.
A copy of the GeoPacific report is enclosed for the homeowners and a copy of our final
inspection report is enclosed for all recipients of this letter.
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
Retaining Walls, Lots 4, 6, and 9. 5/1/2003; p. 2 of 2.
Please note that the GeoPacific report cautions that "The homeowners should be aware that
severely uncontrolled and concentrated runoff, leaking water pipes, or other sources of
potential localized slope saturation may reduce portions [of] the upper wall factor -of- safety to
near 1.0 and could cause partial failure of the uppermost rockery wall. We have included our
list of items to consider for maintenance of hillside homesites to aid the homeowners in
• safeguarding against such occurrences."
The "Maintenance of Hillside Homesites" list is the last page of the GeoPacific report and it
includes specific references to such items as "make sure that roof rain drains are connected ...
check your roof drains, gutters, and spouts to make sure that they are clear ... watch for wet
spots ... do not allow water to pond on the property ... and do not irrigate in an unreasonable
or excessive manner." As this list implies, it is the on -going responsibility of the respective
homeowners to ensure that house rain drains and other systems are properly maintained and
that neither they nor irrigation systems over - saturate the retained fill behind and beneath the
rockery walls.
These walls and the fill behind them are non - structural and no additional loads may be put on
either that could add surcharge to the walls, such as additional fill, decks, accessory buildings,
or other structures.
Thank you for your cooperation in resolving the issues pertaining to the walls on this lot.
Please let me know if you have any questions.
Sincerely,
Alb rt Shields
Building Codes Enforcement Officer
cc: Jim Imbrie, Geopacific Engineering; Property File.
I
ti T - 2v02- o GiLtc- i . J
December 31, 2002 " ""
CITY 00:
FILE Copy
Renaissance Homes, Inc. OREGON
1672 Willamette Falls Dr.
West Linn, OR 97068
Re: Rockery Wall Construction with Associated Fill
Dear Mr. Hunt,
The rock retaining walls and associated fill for Lots 2, 4 -6 & 8 -10 have been reviewed
and approved per the design by Carlson Geotechnical and your agreement with them to
monitor placement of the walls and the compaction of the soils on a continuous basis.
This agreement is a condition of approval of the plan review and is included as part of
• the permit document package.
Carlson Geotechnical shall submit daily field reports regarding drainage, wall base
compaction, drainage, fill compaction, and fill slopes. At the end of construction on each
lot, they must also submit a final summary report that verifies the compliance with their
design and the acceptance of all supported fill at each retaining wall. This will assure
the owners, developer and the City of Tigard that the terraced slope and its component
elements are now and will be stable in the future.
A City of Tigard Building Inspector will also make regular periodic visits once you have
commenced work. Please notify Albert Shields as you begin work on each lot. His
phone number is 503- 718 -2426.
The fees for these permits reflect only those pertaining to issuing each permit, and do
not include any investigation or penalty fees. This will be addressed under separate
cover by Albert Shields who does our uniform code enforcement.
It is important to note that there is still an open enforcement case at each of these lots,
and there will be no final approval by the City until those cases are resolved, and all fees
paid, lot by lot or en masse.
Sincerely, / 9
kids/auk:4 /o 2 /
Darrel "Hap" Watkins "O f
Inspection Supervisor
Cc Robert Wood, Renaissance Homes, Inc. t 0 (0 30
Albert Shields, Codes Enforcement Officer 0
Owners of individual properties /
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
- t olio CA)
.. ... ..
• • .. •• • • • • •
/ i 2— —000 3 l.�
in,,,,,,,��i�
... • . _ �Il�ull�pp. •
...... • ... • ••• CITY F TIGARD
Tuesday, November 05, 2002 •
•
.
• •• •• OREGON
• • ..
Robert D. Wood, VP of Coristr4kon• •
Renaissance Properties FILE COPY
1672 SW Willamette Falls Dr.
West Linn, OR 97068
RE Erickson Heights II, Retaining Walls and Fill, Lots #2 -10.
Dear Robert:
Thank you for your cooperation in taking steps to resolve the issues concerning the rockery
retaining walls and fill on Lots #2 - 10 at Erickson Heights II. Permit applications and plans
regarding the subject walls and fill have been received by the City of Tigard. The lot
numbers, street addresses, and permit numbers are listed on the attached exhibit.
The City recognizes this submission as meeting the timeline requirement set forth in the
September 24, 2002 Notice of Violation letter sent to Renaissance but, as you know, the
application and plans do not resolve or propose corrections regarding the issues raised about
this site in that September 24 letter from the City, the September 17 report from Kleinfelder,
Inc., or the October 21S report from Carlson. We will accept these plans as a pro -forma
submission pending receipt of revised and updated plans upon which we will conduct a formal
plan review.
Please submit plans revised to address and correct the issues and concerns raised in the above
letter and reports.
We have not yet assigned a permit number to the application for lot #7, 10690 SW Kable. The
two rockery walls on that lot were included in the original plans for the subdivision. If
corrective work on those walls is required before the design engineer, Carlson, can verify the
adequacy of their construction and issue a final acceptance letter, please let us know and we
will issue a permit on this property. If Carlson is able to approve these walls as having been
constructed in accordance with their original plans and will issue a final acceptance letter on
them, specific for this lot, please forward that letter to us.
Please note that the City's September 24 letter provided 30 days for submission of the permit
applications and a total of 90 days or 60 days additional for completion of all corrections,
including plan review, construction, inspection, and approval. As of today, November 5 52
days remain of that 90 day period, which ends at close of business on Friday, December 27,
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
• • • • • • • • • • • • •
• • • • • • • • • • • • • •
° • • • •• • • • • • • • •
••• • • •• • • • •
• • • • • • • • • • • • • •
• • • • • • • • • •
2002. Please note further that final iii4pection approv tl will require submission of a final
acceptance letter from the sigirengiit e4). • • • •
• • • • • • • •
••• ••• • ••• • • •••
Sincerely,
•
6.7 •
Gary Lampella, Building Official
cc: Steve Hunt, Hap Watkins, Albert Shields
.S i , Tao?) z- moo
•
CITY OF TIGD
Wednesday, August 07, 2002 OREGON
Homeowners at 10600, 10630, 10652,
10690, 10722, 10, 10832, and
10856 SW Kable St, Tigard
Dear Neighbors:
I have spoken with some of you and have tried to reach each of you by telephone but, since
P Y Y Y p >
many people now have unlisted numbers, just as I do, myself, I will send a copy of this note to
each of you.
This is to let you know that I, other inspectors from the City of Tigard, and engineers from
Kleinfelder, Inc., a geotechnical engineering firm, will be taking photographs and various
measurements of the rock walls and fill at the rear of each of your properties over the next few
days. We plan to begin on Friday morning, August 9 about 9:00 a.m.
•
We will not need access to your homes and we hope to be as unobtrusive as possible.
Hopefully, you will not even notice that we are there and we won't inconvenience you in any
way.
Our sole interest is in the retaining walls that were added to the properties subsequent to the
completion of the subdivision phase in December 1999, and in the composition and compaction
of the fill behind those walls. The fact is that we do not have an adequate description of the
size, location, and composition of those walls and fill. The purpose of our photographs and
measurements will be to provide that description.
If you have any questions or if I can be of assistance in any way, please call me at 503 -639-
4171, Ext. 2426.
Thank you for your cooperation.
Sincerely,
Albert Shields
Housing Inspector, Building Codes Enforcement Officer