Correspondence May 8, 1998 CITY OF TIGARD
OREGON
Carlson Testing
P.O. Box 23814
Tigard, OR 97281
PERMIT NO: 98 -0184
OWNER: Thayer Co.
PROJECT ADDRESS: 7342. SW Kable Lane
PROJECT DESCRIPTION: Rack Storage
TYPES OF SPECIAL INSPECTION: Structural special inspections
Dear Mr. Leach:
The owner has notified us that he /she will retain your services to perform Special Inspections in accordance
with the provisions of the State Building Code, permit documents, and special inspection requirements.
The owner or the owner's agent must also confirm with you that they have authorized you to do the special
inspection work.
As the regulatory agency, the City requires that you do the following:
1. Submit copies of all inspection reports promptly to the Building Division, architect, engineer,
and the contractor.
2. Maintain one copy of each field report at the job site.
3. Submit a final report at the completion of each category of work that you inspect. (See
U.B.C. 3318 for soils special inspection final report requirements).
If you fail to comply with the above requirements, there may be cause for the City to revoke your authority as
special inspector for this job.
Should you have any questions, please call the Building Division at (503) 639 -4171.
Sincerely,
Ro ert Poskin, CBO
Senior Plans Examiner
Enclosure
i: lofsltemplate% notify.dot
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
I R
/ / � io ur��� l�Nuld�� ' ,I ; i
April 29, 1998 CITY OF TIGARD
OREGON
J. Thayer Co.
12220 SW First St
Beaverton, OR 97005
RE: 7342 SW Kable Lane Building Plan Review
PC #: 4 -113c BUP#: 98 -0184
Submittal documents for the above referenced project have been reviewed for conformance with
the applicable 1996 Oregon Specialty Codes and other applicable codes and standards. The
following comments are noted:
p: -,.(;„017,a,:la075-jf-OSNIRT147-73T-715-ETIEF.W1:457,E12
1. When special inspection is required by OSSC, Section 1701, the architect or engineer of
record shall prepare an inspection program which shall be submitted for approval prior to
a building permit being issued [OSSC, Section 106.3.5].
A. Submit an inspection program designating the work requiring special inspection,
and the agency who will be responsible for conducting the inspections [OSSC,
Section 106.3.5].
B. Complete the enclosed Structural Special Inspection form designating an
Approved Testing Laboratory [Line B] and signed by the owner of the project
[Line DJ.
i. The completed form must be returned to this office before a building
permit can be issued.
ii. Copies of all special inspection reports shall be filed with this office
continually during construction.
iii. A final signed report must be on file before the occupancy permit
will be issued [OSSC, Section 1701.3].
2. The required sprinkler system must be issued in conjunction with the building permit.
Please provide the required plans and application.
Please call me at (503) 639 -4171 if you have any questions.
Sincerely,
av
o rt Poskin, CBO
SENIOR PLANS EXAMINER
tp�•m .,r,regoe_m.enpctix.aoo
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772