Permit CITY OF TIGARD
13125 S.W. HALL BLVD.
TIGARD, OR 97223
RECEIVED
NOV 5 1998
IMPORTANT PERMIT NOTICE ~OWE :::1:BIN: CO.
POWER PLUMBING CO
P 0 BOX 23144
TIGARD OR 97281
Plumbing Signature Form
Permit # MST98 -0425
Date Issued.: 11/04/98
Parcel • 2S110AB -05500
Site Address: 11470 SW JACKIE CT
Subdivision.: HAWK MEADOWS
Block Lot: 008
Zoning R - 4.5
Remarks:
Path I
Your company has been indicated as the plumbing contractor for the permit indicated above. In order
for the plumbing permit to be valid, please have the appropriate individual from your company sign
below and return this Plumbing Signature Form prior to the start of work.
No plumbing inspections will be authorized until this completed form is received.
AN INK SIGNATURE IS REQUIRED ON THIS FORM
OWNER: PLUMBING CONTRACTOR:
A WILLIAMSON CONSTRUCTION POWER PLUMBING CO
10895 SW AVOCET CT P 0 BOX 23144
BEAVERTON OR 97007 TIGARD OR 97281
Phone #: 351 - 7491 Phone #:
Reg #..: 000523
X
Signature of Authorized Plumber
Please return this completed form to the address above.
ATTN: Building Dept.
If you have any questions, please call 639 -4171, ext. #310
07/11/2000 Activities for Case #: MST98 -00425
1:11:15 PM •
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes •
MSTA005 Application received 10/06/1998 DEB RECD DLH 10/07/1998
MSTA008 Permit Created 10/07/1998 DLH DONE DLH 10/07/1998
MSTA010 Check for prcl. restrict. 10/07/1998 DLH DONE DLH 10/07/1998
MSTA012 Plans routed to Plans Examiner 10/07/1998 DLH SENT DLH 10/07/1998
MSTA026 Plans approved by Pln Examiner 10/14/1998 RT PASS BT2 10/14/1998
MSTA030 Reviewed plans routed to DSTS 11/04/1998 RT PASS BT2 11/04/1998
MSTA032 DST Post - Review Completed 11/04/1998 GEO DONE GEO 11/04/1998 Need current Elect contractors
lic. and Elect Sup lic updates.
MSTA155 Development conditions met DLH 10/07/1998
MSTA700 Erosion 844 -8444 DLH 10/07/1998
MSTA703 Grading Inspection BT2 11/04/1998 14% slope
MSTA705 Footing lnsp 11/17/1998 KS PASS J *H 11/18/1998 will need to dig out footing
approx. 3 to 4 ft see Carlson
report dated 9 -15 -98
INSPECTION 111798: 1. Initial
erosion control approved. 2.
Ufer rod tagged. 3. Install low
point drain. 4. Provide
reinforcing at all HD's 5. If
portion of stem wall is over
four -ft. high will re: reinforcing.
6. Remove any soft material
prior to placement of concrete.
7. This inspection does not
include piers.
MSTA706 Foundation lnsp 11/23/1998 RC PASS J *H 11/24/1998 Pads not set, check at
underfloor.
MSTA710 Post/Beam Structural 12/04/1998 RC FAIL J *H 12/06/1998 Post on pad too close to verical
cut. REsubmit plans to omit or
hang beam. Inspection
terminated - DO NOT DECK.
MSTA711 Post/Beam Mechanical 12/04/1998 RC PASS J *H 12/06/1998
MSTA713 Crawl Drain /Backwater valve 12/09/1998 RB FAIL RB 12/10/1998 1. Back -water valve for low
point has no termination point,
except into garage- NOT
ACCEPTABLE. At location, NE
corner, it appears to be
retaining water, therefore
•
another low point drain may
need to be installed OR trench
to low point already installed.
MSTA717 PLM /Underfloor DLH 10/07/1998
MSTA720 Mechanical lnsp 03/05/1999 RC FAIL ROC 03/08/1999 PLANS NEED TO BE
RESUBMITTED
Page 1 of 4
07/11/2000 Activities for Case #: MST98 -00425
1:11:15 PM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
MSTA722 Plumb Top Out 02/04/1999 MS PASS MRS 02/04/1999
MSTA723 Electrical Service 02/25/1999 BRP FAIL B *P 02/25/1999 GFCI atjacuzzi to be motor
rated. Outlet to be accessable
for replacement or repair.
UFER grounding does not
comply with Oregon Speciality
Code. Excessive box setback,
some locations.
MSTA724 Electrical Rough In 02/25/1999 BRP FAIL B *P 02/25/1999 See Service notes.
MSTA725 Framing Insp 03/05/1999 RC FAIL GES 03/10/1999 RESUBMIT PLANS FOR
CHANGES MADE TO
GARAGE CEILING FOR
STORAGE ABOVE PROVIDE I
JOIST DIAGRAM INSP
TERMINATED change to plan,
adding limitted storage above
garage approved by GS as
chief plans examiner refused to
make necessary changes [fee
• waived 3- 10 -99]GS
MSTA726 Shear Wall Insp 01/22/1999 RC PASS ROC 01/22/1999
MSTA728 Low Voltage 02/25/1999 BRP PASS B *P 02/26/1999
MSTA735 Gas Line Insp 02/17/1999 WDJ PASS WDJ 02/17/1999 Gas tag #344159
MSTA740 Insulation Insp 03/15/1999 KS PASS KBS 03/15/1999
MSTA752 Rain drain Insp 12/09/1998 RB PART RB 12/10/1998 1. Rain drain around house
only! Storm -to- street at 2 -weep
holes OR if tied in together, use
4 -ich drain line, except that rt.
side of garage needs a
back -water valve connection to
footing drain and rain drain
tie -in. NOTE: Water -proof
memebrane board req'd around
garage and dampproof If. side.
Call for inspection!
MSTA761 Water Service Insp 02/02/1999 MS PASS MRS 02/02/1999
MSTA765 Appr /Sdwlk Insp 04/16/1999 MW PASS AKJ 04/18/1999 Private Road
MSTA790 Electrical Final 05/21/1999 BRP PASS AKJ 05/23/1999
MSTA795 Mechanical Final 07/09/1999 KS PASS HAP 06/26/2000 fireplace shut off valve needs to
be accessible / / /changed fail to
pass per final inspection slip
fax'd by builder showing both
mech and bldg final approval...
hap...6- 26- 00 / ///
Page 2 of 4
07/11/2000 Activities for Case #: MST98 -00425
1:11:15 PM •
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
MSTA797 Plumb Final 05/21/1999 GS FAIL GES 05/24/1999 1) Caulk tub and shower
enclosures
DISREGARD #2. YARD SPRK
ARE HOSE CONNECTED
2) Permit needed for yard
sprinkler backflow device
MSTA•99 Building Final 07/09/1999 KS PASS HAP 06/26/2000 mech final failed / / /changed fail
to pass per final inspection slip
fax'd by builder that shows both
mech and bldg
approval hap....6- 26- 00 / ///
MSTA026 Plans approved by Pln Examiner 10/15/1998 11/04/1998 RT PASS BT2 11/04/1998
MSTA080 (F) Ready to issue 11/04/1998 GEO PASS GEO 11/04/1998 Need Elect contractor lic &
Elect Sup lic updates. Geo
MSTA092 (F) Issue combination permit 11/04/1998 DEB DONE DRA 11/04/1998
MSTA095 Issue plumbing signature form 11/09/1998 VLN RECD VLN 11/09/1998
MSTA097 Issue electric signature form 11/16/1998 JMT RECD JT 11/16/1998
MSTA710 Post/Beam Structural 12/07/1998 RC PASS J *H 12/07/1998
MSTA714 Footing /Foundation Drain 12/09/1998 RB PART RB 12/10/1998 Tie -in to rain drain and install a
back -water valve at connection.
Dampproofing- ok, except side
of garage not completed.
Water - proofing not yet
completed.
MSTA709 Wtr Proofing Bsm't Walls 12/09/1998 RB FAIL RB 12/10/1998 See foundation drain this date.
Damp - proofing completed in
part. Water proofing not yet
completed.
MSTA704 Sewer Inspection 02/01/1999 MS PASS MRS 02/01/1999
MSTA723 Electrical Service 02/26/1999 BRP PASS B *P 02/26/1999
MSTA724 Electrical Rough In 02/26/1999 BRP PASS B'P 02/26/1999
MSTA752 Rain drain Insp 03/05/1999 RB PASS • RB 03/05/1999 Storm Line to street storm- OK.
MSTA720 Mechanical Insp 03/15/1999 RC PASS ROC 03/15/1999
MSTA725 Framing Insp 03/15/1999 RC FAIL ROC 03/15/1999 strap walls where plates do not
overlap FIREBLOCK WHERE
MARKED OK TO INSULATE
MSTA725 Framing Insp 03/15/1999 KS PASS KBS 03/15/1999 #-1- framing approved per GS
3/10/99 see notes pertaining
MSTA000 SF Detached Menu -1 unit 06/18/1999 MRS No Hold MRS 06/18/1999
MSTA782 Backflow Preventor 06/18/1999 MRS PASS No Hold MRS 06/18/1999
MSTA795 Mechanical Final 06/23/1999 06/23/1999 06/23/1999 KS FAIL No Hold AKJ 06/23/1999 see bldg final
Page 3 of 4
07/11/2000 Activities for Case #: MST98 -00425
1:11:15 PM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
MSTA799 Building Final 06/23/1999 06/23/1999 06/23/1999 KS FAIL No Hold DGW 07/27/1999 1) plm final app 6 -23 -99 MS
2) need final erosion control app
3) connect exhaust range duct
at crawl
4) shut off valve at fireplace
needs to be
accessible // /OK...valve is
accessible by definition in the
OTFDC.. "readily accessible" is
not required...hap..7 /27/99
5) insul around storage door
jamb at upper level
6) remove wood /debris at crawl
and recover vapor as needed
7) need to locate crawl drain
MSTA797 Plumb Final 06/23/1999 06/23/1999 06/23/1999 MS PASS No Hold AKJ 06/23/1999
MSTA153 Expired by limitation 06/19/2000 HAP DONE No Hold AKJ 06/20/2000 card sent to contractor
MSTA970 Case Finaled 06/26/2000 HAP DONE No Hold HAP 06/26/2000 See notes in mech and bld
finals 7/9/99...hap....6- 26- 00 / ///
MSTA960 (F) Issue Cert. of Occupancy 07/09/1999 KS DONE No Hold JMT 07/11/2000
Page 4 of 4