Loading...
Permit CITY OF TIGARD 24 -Hour BUILDING Inspection Line: (503) 639 -4175 INSPECTION DIVISION Business Line: (503) 639 -4171 MST 2 � �pp BUP Received 3/� / / , Date Requeste `� /� /G q' AM PM BUP Location qZ a S aJ( i ii Suite 4 MEC Contact Person - 49.P/L -. Ph ( 5 d 3) 2 - 3 0 / 3 PLM Contractor Ph ( ) SWR BUILDING owner '214/1 ' &2/ 2 a 3 ( c S "9 Footing Foundation Access: ELC Ftg Drain ELR Crawl Drain Slab Inspection Notes: SIT Post & Beam Shear Anchors a Ext Sheath /Shear Int Sheath /Shear Framing Insulation Drywall Nailing Fi rewal I Fire Sprinkler Fire Alarm Susp'd Ceiling Roof Other: Final PASS PART FAIL PLUMBING Post & Beam Under Slab Rough -In Water Service Sanitary Sewer Rain Drains Catch Basin / Manhole Storm Drain Shower Pan Other: Final PASS PART FAIL MECHANICAL Post & Beam Rough -In Gas Line Smoke Dampers Final PASS PART FAIL Service Rough -In UG /Slab Low Voltage • larm z,._. 1- El Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd. PART FAIL SITE. El Please call for reinspection RE: El Unable to inspect — no access Fire Supply Line ADA Approach /Sidewalk Date Inspector Ext Other: Final DO NOT REMOVE this inspection record from the Job site. PASS PART FAIL