Loading...
Correspondence Hr •' Ci 1: ii , f� October 4, 1996 Air Pro Heating CITY OF TIGARD 7405 SE Powell Boulevard Portland, OR 97206 OREGON RE: Centrex Warehouse Mechanical Plan Review 8250 SW Hunziker PC #: 9 -69c MEC #: 96 -0326 Submittal documents for the above referenced project have been reviewed for conformance with the applicable 1996 Oregon Specialty Codes and other applicable codes and standards. The following comments are noted: The warehouse exterior envelope does not meet the requirements for enclosing conditioned space. The unit heater specified for the warehouse provides 32 btu per square foot exceeding the 8 btu per square feet allowance for freeze - protected areas [OSSC, Section 1312]. If the building is sprinkler protected, apply Section 1312, Exception No. 1 and 1.1 and submit new plans and specifications. The equipment schedule shall include the cfm, weight, and outside air requirements. A. The heat/ventilation system shall provide outside air per occupant in all portions of the building [UBC Section 1202.2.1 and Table 12 -P]. of 1. Provide outside air specifications on the revised plans. The warehouse shall be provided with mechanical ventilation when natural ventilation cannot be obtained, in accordance with OSSC, Section 1202.2. Provide ventilation. A. Provide a floor plan of the entire tenant space and show location of all windows and doors. Each restroom shall be provided with an exhaust fan, exhausting not less than 50 cfm for each water closet and /or urinal [OSSC, Section 1202.2.5]. Please submit three copies of revised submittal documents and a letter indicating your response to the above comments for review. Please call me at (503) 639 -4171 if you have any questions. Sinc — ,„--.. J ) im Fun PLANS EXAMINER m:\prmsys\ document \mec96_03.26\pc9- 69c.doc 11)1/(14 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 1DD (503) 684 -2772