Loading...
Correspondence / /aiaaNllll�u r ti\ CITY OF TIVARD April 30, 1990 OREGON Joe Hanks Performance Contracting 9665 S.W. Tualatin- Sherwood Rd, Suite 200 Tualatin, OR 97062 Project: Office Addition, BUP90 -0131 8015 SW Hunziker Street Dear Mr. Hanks The plans for this project were reviewed for conformity with applicable codes, and are conditionally approved, subject to clarification of the following items or revision of associated details. 1. Construction details not provided for mezzanine guard rail. 2. Handrail and guardrail details not provided for the stairs to the mezzanine storage area. 3. The area under the stairway shall be protected by one -hour fire - resistive construction and the sprinkler system shall be extended into the space. 4. Plans for additions and changes to the automatic sprinkler system shall be submitted for review. If any changes or additions will be made to the plumbing or mechanical system, please submit plans showing the changes. Separate permits will be required for any such work. You may get the building permit for the project at your convenience.If you have questions, or if we may be of assistance, please contact us at any time. Sincerely, Jim Ja Plans Examiner FAX 503- 684 -7297 13125 SW Hall Blvd., P.O. Box 23397, Tigard, Oregon 97223 (503) 639 -4171