Correspondence / /aiaaNllll�u r ti\
CITY OF TIVARD
April 30, 1990 OREGON
Joe Hanks
Performance Contracting
9665 S.W. Tualatin- Sherwood Rd, Suite 200
Tualatin, OR 97062
Project: Office Addition, BUP90 -0131
8015 SW Hunziker Street
Dear Mr. Hanks
The plans for this project were reviewed for conformity with applicable
codes, and are conditionally approved, subject to clarification of the
following items or revision of associated details.
1. Construction details not provided for mezzanine guard rail.
2. Handrail and guardrail details not provided for the stairs
to the mezzanine storage area.
3. The area under the stairway shall be protected by one -hour
fire - resistive construction and the sprinkler system shall
be extended into the space.
4. Plans for additions and changes to the automatic sprinkler
system shall be submitted for review.
If any changes or additions will be made to the plumbing or mechanical
system, please submit plans showing the changes. Separate permits will
be required for any such work.
You may get the building permit for the project at your convenience.If
you have questions, or if we may be of assistance, please contact us at
any time.
Sincerely,
Jim Ja
Plans Examiner
FAX 503- 684 -7297