Correspondence jM1
art OF TIGARD
OREGON
January 21, 1993
Performance Contracting Inc.
8015 SW Hunziker Street
Tigard, OR 97223
Project: Scientific Air Systems plan check #1 -28C
8015 SW Hunziker Street
Subject: Building Plan Review
(1991 UBC with Oregon Amendments)
The plans for this project were reviewed for conformity with
applicable codes. Please submit the following items for completion
of the plan review process at your earliest convenience:
1. Indicate the insulation R- values on the plans for the
walls and ceiling.
2. Submit engineered stamped structural calculations for
mezzanine including wall attachment to the floor, joist
attachment to walls, plywood deck nailing schedule, etc..
3. Provide a baseboard heater in each room.
4. One in eight accessible parking spaces, but not less than
one, shall be served by an access aisle 96 inches wide
minimum and shall be designated van accessible (Table 31-
A, figure 9, and section 3104(g)2B). Please submit a
signage detail for the handicapped parking stall.
5. Key - locking hardware may be used on the main exit only,
if there is a readily visible, durable sign on or
adjacent to the door stating, "THIS DOOR TO REMAIN
UNLOCKED DURING BUSINESS HOURS" (section 3304(c)
exception). Other doors to have lever hardware.
ne
6. Rest rooms are required per Table 5 -B with at least one
being a unisex handicapped rest room meeting
requirements of Chapter 31.
7. The toilet
ce extends upward onto the wall at nonabsorbent
surface surfa 5
inches (section 510(c)1).
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
8. Walls within 2 feet of the front and sides of urinals and
water closets shall have smooth, hard nonabsorbent
surface to a height of 4 feet. The material used in such
walls shall be of a type which is not adversely affected
by moisture (section 510(c)2).
9. Provide a drinking fountain per Table 5 -E and Chapter 31
section 3108(d)1, and figure 27.
10. Provide an automatic fire - extinguishing system in the new
offices.
11. Specify in detail, the use of the warehouse. If welding
is not performed, the occupancy classification will most
likely be a B -2. This determination will eliminate other
concerns such as an occupancy separation between the
office and the warehouse, enclosed stairways, exiting
requirements, etc..
12. Submit handicapped details for the rest room(s) which
comply with the current requirements of Chapter 31.
13. Devices generating a glow or flame capable of igniting
gasoline vapor shall not be installed or used within 18
inches of the floor in any room in which Class I
flammable liquids or gas are used or stored (section
708) .
14. Storage and use of flammable and combustible liquids
shall be in accordance with the Fire Code (section 708).
15. A guardrail is required at the mezzanine. The top of
guardrails shall not be less than 42 inches in height.
The open space between the intermediate rails may be such
that a sphere 12 inches in diameter cannot pass through
(section 1712(a)).
16. The clear height above the mezzanine floor shall be not
less than 7 feet (section 1717).
17. Provide a stairway to the mezzanine in compliance with
section 3306.
18. Architectural barriers up to an expenditure of 25 percent
of the total project cost is required per UBC section
3112(a)1. Please look at accessible items A -G and submit
a price list which totals 25 percent of the project cost.
The total project cost to include all materials and labor
plus all profits- approximately $20,000?
19. Submit a typical installation detail of the suspended
ceiling for seismic zone 3.
y '}
20. The entry door to the large office to have a minimum of
an 18 inch strike edge wall (section 3109(i)3, figure
#25(a), and Table 31 -F).
21. At least one exit to this tenant space is required to be
accessible. The new landing and steps do not allow
accessibility for the handicapped.
22. Submit two copies of the construction documents
(specification book).
23. The floor or landing at entrances to the building shall
not be more than 1/2 inch lower than the threshold of the
doorway (section 3304(i)).
Please make these corrections on the appropriate pages of the
drawings and resubmit three copies of each page to the City of
Tigard for review.
This plan review does not include electrical or plumbing plan
reviews. Electrical concerns can be directed to Washington County
at 640 -3470 and plumbing concerns to Mike Sheehan at the City of
Tigard at 639 -4171 extension 312.
If you have any questions or concerns, please do not hesitate to
call.
Sincerely,
Mark Burrows
Plans Examiner
639 -4171 ext. 361
mb /pc #1- 28.doc
„44„,_„.„0„
ALLA
CITY OF TIGARD
OREGON
April 18, 1991
Rich Russell
Performance Contracting, Inc.
8015 SW Hunziker Street
Tigard, OR 97223
Project: Office Space Addition, BUP91 -0081
8015 SW Hunziker Street
Dear Mr. Russell:
The plans for this project were reviewed for conformity with applicable
codes, and are approved. You may get the permits for the project at your
convenience. Should any changes from submitted plans be proposed, please
submit revised plans for review.
Any alteration of or addition to the existing automatic sprinkler system
or mechanical system will also require plans review and permits.
A list of required inspections is noted on the building permit, as is the
telephone number for requesting inspections. If you have questions, or if
we may be of assistance, please contact us.
incerely,
. .
Jim J. 1a
Plans Examiner
FAX (503)684 -7297
13125 SW Hall Blvd., P.O. Box 23397, Tigard, Oregon 97223 (503) 639 -4171
P �I N �q
`J /� nR { TUALATIN VALLEY FIRE & RESCUE
AND
BEAVERTON FIRE DEPARTMENT
u Jam' 4755 S.W. Griffith Drive • P.O. Box 4755 • Beaverton, OR 97076 • (503) 526 -2469 • FAX 526 -2538
R F& RES
April 15, 1991
Performance Contracting, Inc.
8015 S.W. Hunziker
Tigard, Oregon 97223
Re: Performance Contracting, Inc.
8015 S.W. Hunziker
6090A- 033 -000
Gentlemen:
This is a Fire and Life Safety Plan Review and is based on the
1988 editions of the Fire and Life Safety Code (UBC),
Mechanical Fire and Life Safety Code (UMC), Uniform Fire Code
(UFC), and other local ordinances and regulations.
Plans are conditionally approved subject to the following
items:
1. Firestopping: In all wood framed walls and partitions,
firestopping consisting of 2- inch'nominally -sized
lumber or other approved materials must be installed at
all floor and ceiling levels. Penetrations in this
prescribed firestopping to accommodate wiring,
plumbing, and other similar utility runs must be packed
with noncombustible materials in an approved manner so
as to prevent the passage of flame. UBC Sec. 2516
2. Automatic Sprinkler Plans: Plans referred to and
examined by this office contain no provisions for the
alteration or installation of automatic sprinkler
system. Not less than three sets of plans for the
installation shall be submitted to this office for
approval prior to installation. UBC 302(b)
Note: This appears to be only minor modification.
Plans will not be required, however, call for an
inspection while piping is still open for inspection.
3. Hallways: If numbers of occupants utilizing the
existing corridor system exceed 30, based on 100 square
feet for office use and 15 square feet for conference
"Working" Smoke Detectors Save Lives
' Performance Contracting, Inc.
April 15, 1991
Page 2
rooms excluding the square footage for storage and
restrooms, then hallways shall be of not less than one
hour fire resistive construction complying with Uniform
Building Code Section 3305(g &h).
4. Approved Plans on Job Site: One set of approved plans
bearing the stamps of the building department issuing
the construction permit and this office must be
maintained on the project site throughout all phases of
construction and must be made available to building and
fire inspectors for reference during required
construction inspections. UBC Sec. 303
5. Required Occupancy Certificate: Prior to the use and
occupancy of the project (space), a certificate of
occupancy or other written instrument of approval must
be obtained from the building department issuing the
construction permit. UBC Sec. 307
If I can be of any further assistance to you, please feel free
to contact me at 526 -2502.
Sincerely,
ilt
O
Gene Birchil
Deputy Fire Marshal
GB:kw
cc: Tigard Building Department ✓
9' 9' P