Loading...
Correspondence jM1 art OF TIGARD OREGON January 21, 1993 Performance Contracting Inc. 8015 SW Hunziker Street Tigard, OR 97223 Project: Scientific Air Systems plan check #1 -28C 8015 SW Hunziker Street Subject: Building Plan Review (1991 UBC with Oregon Amendments) The plans for this project were reviewed for conformity with applicable codes. Please submit the following items for completion of the plan review process at your earliest convenience: 1. Indicate the insulation R- values on the plans for the walls and ceiling. 2. Submit engineered stamped structural calculations for mezzanine including wall attachment to the floor, joist attachment to walls, plywood deck nailing schedule, etc.. 3. Provide a baseboard heater in each room. 4. One in eight accessible parking spaces, but not less than one, shall be served by an access aisle 96 inches wide minimum and shall be designated van accessible (Table 31- A, figure 9, and section 3104(g)2B). Please submit a signage detail for the handicapped parking stall. 5. Key - locking hardware may be used on the main exit only, if there is a readily visible, durable sign on or adjacent to the door stating, "THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS" (section 3304(c) exception). Other doors to have lever hardware. ne 6. Rest rooms are required per Table 5 -B with at least one being a unisex handicapped rest room meeting requirements of Chapter 31. 7. The toilet ce extends upward onto the wall at nonabsorbent surface surfa 5 inches (section 510(c)1). 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 8. Walls within 2 feet of the front and sides of urinals and water closets shall have smooth, hard nonabsorbent surface to a height of 4 feet. The material used in such walls shall be of a type which is not adversely affected by moisture (section 510(c)2). 9. Provide a drinking fountain per Table 5 -E and Chapter 31 section 3108(d)1, and figure 27. 10. Provide an automatic fire - extinguishing system in the new offices. 11. Specify in detail, the use of the warehouse. If welding is not performed, the occupancy classification will most likely be a B -2. This determination will eliminate other concerns such as an occupancy separation between the office and the warehouse, enclosed stairways, exiting requirements, etc.. 12. Submit handicapped details for the rest room(s) which comply with the current requirements of Chapter 31. 13. Devices generating a glow or flame capable of igniting gasoline vapor shall not be installed or used within 18 inches of the floor in any room in which Class I flammable liquids or gas are used or stored (section 708) . 14. Storage and use of flammable and combustible liquids shall be in accordance with the Fire Code (section 708). 15. A guardrail is required at the mezzanine. The top of guardrails shall not be less than 42 inches in height. The open space between the intermediate rails may be such that a sphere 12 inches in diameter cannot pass through (section 1712(a)). 16. The clear height above the mezzanine floor shall be not less than 7 feet (section 1717). 17. Provide a stairway to the mezzanine in compliance with section 3306. 18. Architectural barriers up to an expenditure of 25 percent of the total project cost is required per UBC section 3112(a)1. Please look at accessible items A -G and submit a price list which totals 25 percent of the project cost. The total project cost to include all materials and labor plus all profits- approximately $20,000? 19. Submit a typical installation detail of the suspended ceiling for seismic zone 3. y '} 20. The entry door to the large office to have a minimum of an 18 inch strike edge wall (section 3109(i)3, figure #25(a), and Table 31 -F). 21. At least one exit to this tenant space is required to be accessible. The new landing and steps do not allow accessibility for the handicapped. 22. Submit two copies of the construction documents (specification book). 23. The floor or landing at entrances to the building shall not be more than 1/2 inch lower than the threshold of the doorway (section 3304(i)). Please make these corrections on the appropriate pages of the drawings and resubmit three copies of each page to the City of Tigard for review. This plan review does not include electrical or plumbing plan reviews. Electrical concerns can be directed to Washington County at 640 -3470 and plumbing concerns to Mike Sheehan at the City of Tigard at 639 -4171 extension 312. If you have any questions or concerns, please do not hesitate to call. Sincerely, Mark Burrows Plans Examiner 639 -4171 ext. 361 mb /pc #1- 28.doc „44„,_„.„0„ ALLA CITY OF TIGARD OREGON April 18, 1991 Rich Russell Performance Contracting, Inc. 8015 SW Hunziker Street Tigard, OR 97223 Project: Office Space Addition, BUP91 -0081 8015 SW Hunziker Street Dear Mr. Russell: The plans for this project were reviewed for conformity with applicable codes, and are approved. You may get the permits for the project at your convenience. Should any changes from submitted plans be proposed, please submit revised plans for review. Any alteration of or addition to the existing automatic sprinkler system or mechanical system will also require plans review and permits. A list of required inspections is noted on the building permit, as is the telephone number for requesting inspections. If you have questions, or if we may be of assistance, please contact us. incerely, . . Jim J. 1a Plans Examiner FAX (503)684 -7297 13125 SW Hall Blvd., P.O. Box 23397, Tigard, Oregon 97223 (503) 639 -4171 P �I N �q `J /� nR { TUALATIN VALLEY FIRE & RESCUE AND BEAVERTON FIRE DEPARTMENT u Jam' 4755 S.W. Griffith Drive • P.O. Box 4755 • Beaverton, OR 97076 • (503) 526 -2469 • FAX 526 -2538 R F& RES April 15, 1991 Performance Contracting, Inc. 8015 S.W. Hunziker Tigard, Oregon 97223 Re: Performance Contracting, Inc. 8015 S.W. Hunziker 6090A- 033 -000 Gentlemen: This is a Fire and Life Safety Plan Review and is based on the 1988 editions of the Fire and Life Safety Code (UBC), Mechanical Fire and Life Safety Code (UMC), Uniform Fire Code (UFC), and other local ordinances and regulations. Plans are conditionally approved subject to the following items: 1. Firestopping: In all wood framed walls and partitions, firestopping consisting of 2- inch'nominally -sized lumber or other approved materials must be installed at all floor and ceiling levels. Penetrations in this prescribed firestopping to accommodate wiring, plumbing, and other similar utility runs must be packed with noncombustible materials in an approved manner so as to prevent the passage of flame. UBC Sec. 2516 2. Automatic Sprinkler Plans: Plans referred to and examined by this office contain no provisions for the alteration or installation of automatic sprinkler system. Not less than three sets of plans for the installation shall be submitted to this office for approval prior to installation. UBC 302(b) Note: This appears to be only minor modification. Plans will not be required, however, call for an inspection while piping is still open for inspection. 3. Hallways: If numbers of occupants utilizing the existing corridor system exceed 30, based on 100 square feet for office use and 15 square feet for conference "Working" Smoke Detectors Save Lives ' Performance Contracting, Inc. April 15, 1991 Page 2 rooms excluding the square footage for storage and restrooms, then hallways shall be of not less than one hour fire resistive construction complying with Uniform Building Code Section 3305(g &h). 4. Approved Plans on Job Site: One set of approved plans bearing the stamps of the building department issuing the construction permit and this office must be maintained on the project site throughout all phases of construction and must be made available to building and fire inspectors for reference during required construction inspections. UBC Sec. 303 5. Required Occupancy Certificate: Prior to the use and occupancy of the project (space), a certificate of occupancy or other written instrument of approval must be obtained from the building department issuing the construction permit. UBC Sec. 307 If I can be of any further assistance to you, please feel free to contact me at 526 -2502. Sincerely, ilt O Gene Birchil Deputy Fire Marshal GB:kw cc: Tigard Building Department ✓ 9' 9' P