Loading...
Correspondence August 18, 2005 i CITY OF TIGARD OREGON Viking Automatic Sprinkler Co. Wayne Winston 3245 NW Front Ave. Portland, OR 97210 RE: PAINT BOOTH - MODIFICATION - FIRE SPRINKLER SYSTEM REVIEW Project Information Building Permit: BUP2005 -00390 Occupancy Type: H -2 Tenant Name: Artistic Auto Body Construction Type: 5 -B Address: 7585 SW Hunziker St Occupant Load: NA Area: 667 Sq Ft Stories: 1 Hazard: Extra Hazard Group 2 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition, Oregon Fire Code 2004 edition; and NFPA 13. The submitted plans are approved subject to the following. HYDROSTATIC TESTING Hydrostatic testing of the system shall occur at sprinkler final. The contractor's material and test certificate required by NFPA 13, 16.1 shall be completed and signed by both the installer and building owner. 1. Unless permitted by 16.2.1.2 through 16.2.1.6, all piping and attached appurtenances subjected to system working pressure shall be hydrostatically tested at 200 psi (13.8 bar) and shall maintain that pressure without loss for 2 hours. Loss shall be determined by a drop in gauge pressure or visual leakage. The test pressure shall be read from a gauge located at the low elevation point of the system or portion being tested. Section 16.2.1 2. Water flow alarm apparatus shall be listed for the service and so constructed and installed that any flow of water from a sprinkler system equal to or greater than that from a single automatic sprinkler of the smallest orifice size installed on the system will result in an audible alarm on the premises within 5 minutes after such flow begins and until such flow stops. Section 6.9.1 3. Sprinklers for each spray area shall be controlled by a separate, accessible, listed indicating valve. Section 13.4.2.1 4. Sprinklers protecting spray areas shall be protected against overspray residue. 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 5. The system piping shall be braced to resist both lateral and longitudinal horizontal seismic loads and to prevent vertical motion resulting from seismic loads. The structural components to which bracing is attached shall be determined to be capable of carrying the added applied seismic loads. Sway braces shall be designed to withstand forces in tension and compression. Bracing shall be attached directly to feed and cross mains. Section 9.3.5 - 9.3.5.8 6. The stock of spare sprinklers shall include all types and ratings installed and shall be as follows: a. For systems having less than 300 sprinklers, not fewer than six sprinklers. Section 6.2.9 Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.3.1 OSSC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Val Henzel Senior Plans Examiner