Loading...
Correspondence 7� o s t Y.5 Aop 1 CITY OF TIGARD • OREGON April 4, 1995 = • - John Howell 8457 N.E. Going Street Portland, OR 97220 Project: Foundation Engineering Plan Check #3 -29C Subject: Building Plan Review (1991 UBC with Oregon Amendments) Dear Mr. Howell: The plans for this project were reviewed for conformity with applicable codes. The following comments are noted: aS PV) \ ". Existing toilet room number 7 shall be constructed and made to comply with all of the accessibility requirements of CH. 31. Plans do not show full compliance with the code. 2. Provide not less than one -hour materials on the under side of the stair stringers and walls of the proposed storage area under the stairs (Section 3306(1). 1 ) 3. The relocation of the existing plumbing vent shall comply with the plumbing code. Plumbing permit is required. 4. The structural stability of the proposed new guardrail shall withstand not less than 50 lb. /lt. applied at right angles to the top of the rail. Provide detail. Please make the necessary changes to the plans and submit 3 revised sets (4 floor plans) for completion of the plan review process. Sincere , •avi• Scott, P.E. Building Official DS:wh PRMSYS \DOCUMENT \BUP95 00.90 \PC4329C DOC 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772