Loading...
Correspondence September 14, 2004 CITY OF TIGARD Scott Austin OREGON Fire Systems West 600 SE Maritime Avenue, Suite 300 Vancouver, WA 98661 RE: CONVERSION OF DRY SPRINKLER SYSTEM Project Information Building Permit: BUP2004 -00399 Construction Type: 3N Tenant Name: Utility Industrial Occupancy Type: 113 Address: 7805 SW Hunziker Occupant Load: NA Hazard: Extra, Group 1 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The submitted plans are approved subject to the following. FLUSHING The fire service mains shall be completely flushed before connection is made to the sprinkler piping. The flow rate shall not be less than the hydraulically calculated water demand of the system including any hose requirements. Standard 9 -1, section 8 -2.1 OSSC HYDROSTATIC TESTING All interior piping shall be hydrostatically tested at 200 psi and shall maintain that pressure without loss for 2 hours. The test pressure shall be read from a gauge located at the low elevation point of the system or portion being tested. Standard 9 -1, section 8 -2.2.1 OSSC. GENERAL 1. A key box shall be installed within 20 feet of the riser room entrance. The bottom of the key box shall be not less than 8 feet nor more than 10 feet above the walking surface unless approved by the Fire Chief 902.4.2 TVFR99 -01 Contact TVF &R for keybox at 503- 612 - 7010. An existing keybox is acceptable. 2. Clearances shall be provided around all piping extending through walls, floors, platforms and foundations. Minimum clearance for pipe sizes 1 inch through 3 t/2 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 inches shall be not less than 1 inch. Minimum clearance for pipes 4 inches and larger shall be 2 inches. Standard 9 -1, section 4- 5.4.3.4 3. Monitoring. All valves controlling the water supply shall be electrically monitored. Section 904.3.1 OSSC 4. An approved audible sprinkler flow alarm shall be provided on the exterior of the building in an approved location. An approved audible sprinkler flow alarm to alert the occupants shall be provided in the interior of the building in a normally occupied location. 904.3.2 OSSC Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respect Brian : ock, Se. Plans Examiner