Permit CITY OF TIGARD 24 -Hour
BUILDING Inspection Line: (503) 639 -4175
INSPECTION DIVISION Business Line: (503) 639 - 4171 MST
BUP
Received Date Requested S AM F PM BUP
Location
1x ' 36 A14/4_1_45 t' Suite MFC `'/- z >
Contact Person Ph ( ) PLM
Contractor Ph ( ) SWR
BUILDING Tenant/ ne / e t ELC 0 _gyp Z '(
Footing 49 AO — /33
Foundation E
Access: 40,
Ftg Drain
Crawl Drain rr
Slab Inspection Notes: .
Post & Beam
Shear Anchors
Ext Sheath/Shear
Int Sheath /Shear
Framing
Insulation
Drywall Nailing
Fi rewal I
Fire Sprinkler Yrs r - ' %I t "
Fire Alarm
Susp'd Ceiling
Roof
Other:
Final
PASS PART FAIL
PLUMBING
Post & Beam
Under Slab WF T
ter' Diu &1�
Rough -In
Water Service
Sanitary Sewer
Rain Drains
Catch Basin / Manhole
Storm Drain
Shower Pan
Other:
Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough -In
Gas Li s e
Sm•. e Dampers
at:!�
i►
ASS ART FAIL
AL
Service
Rough -In
UG /Slab
Low Voltage
Fire Alarm
ASS PART 111 Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
SITE Please call for reinspection RE: Unable to inspect — no access
Fire Supply Line
ADA
Approach /Sidewalk Date Inspector Ext
Other:
Final DO NOT REMOVE this inspection record from the job site.
PASS PART FAIL