Plans / oS 62a 716 DANIEL A. SCHUTTER, P.E. 2216 Thorne Street Newberg, Oregon 97132 (503) 538 -6097 June 30, 2004 To Whom It may Concern Subject Added shear wall . 1.7- - , . r north and south wails for Minuteman Press. Permit • , BUP200]- 00681 The following design modification is required to allow for installation of plywood on only one side of shear wail panels located at north and south ends of the lower floor. Reference section 31 of calculations dated May 2, 2004. Shear wall load is 26,119 lbs. Shear wall line with plywood one side only provides 18,070 lbs. capacity. An additional 8,049 lbs. of capacity is required. The following hoiddowns will provide 3,610 lbs. capacity each. Three required at each end. Install one PHD2 -SDS3 at the east end of the first three floor joist at the north and south end of the building (total of six PHD2 required). Each PHD2 shall be attached to the foundation wall with a 518" A -307 all-thread A.B. embedded 5 inches with Simpson SET epoxy installed per manufacturers specifications. Each PHD2 shall be attached to two 3 ft long .2x6 blocks located on each side of the I -joist web (web is sandwiched between 2x6s) with 10 SC)S3 lag bolts through the PHD2 and an additional six 3 inch lag screws through the 2x6 per attached sketch. A MST37 with 20 - 16d common nails shall be installed over the centerline beam to connect the ends of the adjacent joist (total of six places). Please feel free to call me at 554 -2014 if you have any questions regarding this request. Truly Yours, Dan Schutter Sincerely, G1 N,' 14 5P • E ' Daniel A. Schutter, P.E. , OR EGON • "ey 1 s Attachement: one skectch A. GC Expires: .7" • ' d L699'oN OAS INVld XOd 391030 WVZ17:9 1700Z 'OE'unf Jun.30. 2004 6:43AM GEORGE FOX PLANT SVC No•5597 P 2 by :mpg 1{-a.,,, 4,s ,0 f fo Ei9X? (2 77"'v.as 4 / fn45 _ 11002 ' J A{nC JS 9 c -(2 1 'e 7J/1d f ! z • ••• • • • 4- 2 kit", osouty-#H r+S �f7S� S Said Leili.-4'210-4,tor1,1 City of Tigard O FFICE COPY Approved Plans By LsYS Date 33 ? 7y SW Haznoso wA j' March 19, 2004 II To Whom It may Concern Subject: Epoxy Anchor bolts for Minuteman Press, Permit no. BUP2009 -00681 Epoxy installed anchor bolts are approved for Minuteman Press, Tigard OR for the locations described below. Manufacturers specifications for preparation and installation must be followed. See attached. 1) All anchor bolts for portal frames except detail 5 shown on sheet S10 of the Plans. Use 5/8" A307 all thread, embedded 6 inches, Simpson SET epoxy, follow all Simpson specifications for preparation and installation. 2) Anchor bolts for Shear panel 30B hold downs (HD8A). Use 7/8" A307 all thread, embedded 7 inches, use Simpson SET epoxy, follow all Simpson specifications for preparation and installation. Note that this holddown should be used on all panel anchors shown on the west elevation drawing except the two at the south (left) end. See item 3 below for these two hold downs. 3) Anchor bolts for Shear panel 30C hold downs (PHD5 SDS3). Use 5/8" A307 all thread, embedded 6 inches, use Simpson SET epoxy, follow all Simpson specifications for preparation and installation. Note that this hold down should be used for one shear brace panel shown at south end (left) of the west elevation drawing. 4) All anchor bolts for steel columns supporting the first floor centerline beam. Use 5/8" A307 all thread, embedded 4-1/2 inches, Simpson SET epoxy, follow all Simpson specifications for preparation and installation • Please feel free to call me at 554 -2014 if you have any questions regarding this request. Truly Yours, Dan Schutter '`~ . A s / / OREGON , 'A' SC% /-' 4 - Z_t ,F r qc C d SINtPSON, = a L - �Y Preparation and installation • Cure Schedule In- Service Temperature Sensitivity Improperly Prepared Holes Base Material C °Base Mntetral Percent 1. Refer to temperature Hole Blown H Blown Temperature Temperature Allowable.: sensitivity chart for Hole tdot B rushed H Not$r Time F C 1 , °F �9C Load allowable bond strength Adjustment • 40 I 4 72 hrs. 40 4 100% reduction for temperature. Factor' 0.97 0.63 See page 11 for more 65 18 1:2 70 21 .100% nformation. 1. Hole depth was over - drilled to account for dust in 85 29 .20 hrs. 1.10 43 100% 2. Percent allowable load may hole to achieve required embedment depth. :90';..; " • 116•hrs ' , " -75% be linearly interpolated for Optional testing with SET adhesive was done in compliance with 150 66 44% intermediate base material ASTM E488 to determine the effect of concrete dust left in the hole p ` temperatures. on the performance of this adhesive, and to show SET will consistently 180:. - 82= "1" = :20,% _ =: 3. 'C = °F -32 / 1.8 ( ) perform better than or equivalent to cast in place anchors, even in improperly prepared holes. The load adjustment factors in the above CARTRIDGE PREPARATION BY.S)DE)4' table were developed from the results of those tests. • Cut or pry tips from cartridge. • Caution: Adhesive will start to harden in the mixing nozzle after . • Insert cartridge into dispensing tool. 5 -7 minutes. Adhesive will harden faster in higher temperatures. • Attach a clean mixing nozzle (which is free of Do not try to dispense after adhesive hardens in nozzle. gelled or hardened material) to the cartridge. • When using a pneumatic dispensing tool, air • Tighten nozzle on cartridge. DO NOT OVER- TIGHTEN. pressure must be regulated at 80 -100 psi. 1 • Dispense bead of adhesive off to the side to check for proper mixture (a uniform gray color) before using. Installation into Concrete and Grout Filled CMU ETS or ETSP Screen Tube Installation into Brick and Ungrouted Masonry -::m. (Hollow CMU Similar) 1FilT : rrt a v �••• . .,„;2. a 1 7;::. ,I, ° 1111 ' a �, •_; a,,, a ; 1. Drill -Drill hole to • :; ;;:: r:; specified diameter and IMBREA depth. Drill should be .. 1. Drill -Drill hole 2. Clean- Remove dust from hole with set on rotation only. p�f ' �- to specified oil -free compressed air. Clean with diameter and nylon brush and blow out remaining depth. dust. Note: Dust left in hole can reduce 2. Clean-Remove compressed i dust n with hole with sh compressed air. Clean with nylon brush and the adhesive's holding capacity. blow out remaining dust. Note: Dust left in hole can reduce the adhesive's holding capacity. O D 6 L D9 {� \ .T431 " ; •; 3. Fill -Dispense bead of adhesive oft to the side to 4. Insert - Anchors must be i t check for proper mixture (a uniform gray color) clean and oil tree. Insert 3. Fill -Fill hole 1/2 - full, 4. Insert- Anchors must be before using. Fill screen completely. Always start anchor. turning slowly o starting from bottom of clean and oil free. Insert by filling from the bottom of the screen to avoid until the anchor contacts hole to prevent air pockets. anchor, turning slowly until the air pockets. Insert screen into hole. the bottom of the screen. ;-, Withdraw nozzle as hole anchor contacts the bottom of Do not disturb during o fills up. the hole. Do not disturb during cure time. cure time. `SET,PAC Mlxfng Instrectians; .4 o 1. �=� I 2. �� 3. 4. =- �i' a Remove cap. Insert \ Remove red end Insert cartridge f' / black mixing rod into , Turn rod clockwise �� ----�� cap at bottom into tool. s i r -4,,,, center of cartridge. to thread into of cartridge. � mixing paddle. • 5. 6. 7. n • 8. �`, r': N Dispense SET -PAC -� - 4 immediately after opening. ^• I ' I,, Set drill on , .., If left in the cartridge, mixed forward. mix I Squeeze ' epoxy will harden in 5 - j • i up and down Cartridge. minutes. The epoxy in the cartridge may Push rod to '1.:„=, /i I � / ,, -� ` lb� for 2 minutes ) ' L- i, Remove also reach a temperature in excess of L bottom o m, Attach sEr c at 1000 rpm , -S rod. Install 200 °F (93 °C). Use caution handling or .. T f cartridge. 1 t o drill. � tC minimum. \ nozzle. disposing of cartridge until cool. 35