DANIEL A. SCHUTTER, P.E.
2216 Thorne Street
Newberg, Oregon 97132
(503) 538 -6097
June 30, 2004
To Whom It may Concern
Subject Added shear wall . 1.7- - , . r north and south wails for
Minuteman Press. Permit • , BUP200]- 00681
The following design modification is required to allow for installation of plywood
on only one side of shear wail panels located at north and south ends of the
lower floor. Reference section 31 of calculations dated May 2, 2004. Shear wall
load is 26,119 lbs. Shear wall line with plywood one side only provides 18,070
lbs. capacity. An additional 8,049 lbs. of capacity is required. The following
hoiddowns will provide 3,610 lbs. capacity each. Three required at each end.
Install one PHD2 -SDS3 at the east end of the first three floor joist at the north
and south end of the building (total of six PHD2 required). Each PHD2 shall be
attached to the foundation wall with a 518" A -307 all-thread A.B. embedded 5
inches with Simpson SET epoxy installed per manufacturers specifications.
Each PHD2 shall be attached to two 3 ft long .2x6 blocks located on each side of
the I -joist web (web is sandwiched between 2x6s) with 10 SC)S3 lag bolts through
the PHD2 and an additional six 3 inch lag screws through the 2x6 per attached
sketch. A MST37 with 20 - 16d common nails shall be installed over the
centerline beam to connect the ends of the adjacent joist (total of six places).
Please feel free to call me at 554 -2014 if you have any questions regarding this
request.
Truly Yours,
Dan Schutter
Sincerely, G1 N,'
14 5P • E
'
Daniel A. Schutter, P.E. , OR EGON •
"ey 1 s
Attachement: one skectch A. GC
Expires: .7" •
' d L699'oN OAS INVld XOd 391030 WVZ17:9 1700Z 'OE'unf
Jun.30. 2004 6:43AM GEORGE FOX PLANT SVC No•5597 P 2
by :mpg
1{-a.,,, 4,s ,0 f fo
Ei9X? (2
77"'v.as 4 / fn45 _
11002 ' J A{nC
JS 9 c -(2 1
'e 7J/1d
f ! z • •••
• • •
4-
2
kit", osouty-#H r+S �f7S�
S Said Leili.-4'210-4,tor1,1
City of Tigard O FFICE COPY
Approved Plans
By LsYS Date 33 ?
7y SW Haznoso wA j'
March 19, 2004
II
To Whom It may Concern
Subject: Epoxy Anchor bolts for Minuteman Press, Permit no. BUP2009 -00681
Epoxy installed anchor bolts are approved for Minuteman Press, Tigard OR for the locations
described below. Manufacturers specifications for preparation and installation must be
followed. See attached.
1) All anchor bolts for portal frames except detail 5 shown on sheet S10 of the Plans.
Use 5/8" A307 all thread, embedded 6 inches, Simpson SET epoxy, follow all
Simpson specifications for preparation and installation.
2) Anchor bolts for Shear panel 30B hold downs (HD8A). Use 7/8" A307 all thread,
embedded 7 inches, use Simpson SET epoxy, follow all Simpson specifications for
preparation and installation. Note that this holddown should be used on all panel
anchors shown on the west elevation drawing except the two at the south (left) end.
See item 3 below for these two hold downs.
3) Anchor bolts for Shear panel 30C hold downs (PHD5 SDS3). Use 5/8" A307 all
thread, embedded 6 inches, use Simpson SET epoxy, follow all Simpson specifications
for preparation and installation. Note that this hold down should be used for one shear
brace panel shown at south end (left) of the west elevation drawing.
4) All anchor bolts for steel columns supporting the first floor centerline beam. Use 5/8"
A307 all thread, embedded 4-1/2 inches, Simpson SET epoxy, follow all Simpson
specifications for preparation and installation
•
Please feel free to call me at 554 -2014 if you have any questions regarding this request.
Truly Yours,
Dan Schutter '`~ .
A
s
/ /
OREGON
, 'A' SC%
/-' 4 -
Z_t ,F r qc C d
SINtPSON, =
a L -
�Y Preparation and installation
•
Cure Schedule In- Service Temperature Sensitivity Improperly Prepared Holes
Base Material C °Base Mntetral Percent 1. Refer to temperature Hole Blown H Blown
Temperature Temperature Allowable.: sensitivity chart for Hole tdot B rushed H Not$r
Time
F C 1 , °F �9C Load allowable bond strength Adjustment •
40 I 4 72 hrs. 40 4 100% reduction for temperature. Factor' 0.97 0.63
See page 11 for more
65 18 1:2 70 21 .100% nformation. 1. Hole depth was over - drilled to account for dust in
85 29 .20 hrs. 1.10 43 100% 2. Percent allowable load may hole to achieve required embedment depth.
:90';..; " • 116•hrs ' , " -75% be linearly interpolated for Optional testing with SET adhesive was done in compliance with
150 66 44% intermediate base material ASTM E488 to determine the effect of concrete dust left in the hole
p ` temperatures. on the performance of this adhesive, and to show SET will consistently
180:. - 82= "1" = :20,% _ =: 3. 'C = °F -32 / 1.8
( ) perform better than or equivalent to cast in place anchors, even in
improperly prepared holes. The load adjustment factors in the above
CARTRIDGE PREPARATION BY.S)DE)4' table were developed from the results of those tests.
• Cut or pry tips from cartridge. • Caution: Adhesive will start to harden in the mixing nozzle after . • Insert cartridge into dispensing tool. 5 -7 minutes. Adhesive will harden faster in higher temperatures.
• Attach a clean mixing nozzle (which is free of Do not try to dispense after adhesive hardens in nozzle.
gelled or hardened material) to the cartridge. • When using a pneumatic dispensing tool, air
• Tighten nozzle on cartridge. DO NOT OVER- TIGHTEN. pressure must be regulated at 80 -100 psi. 1
• Dispense bead of adhesive off to the side to check for
proper mixture (a uniform gray color) before using.
Installation into Concrete and Grout Filled CMU ETS or ETSP Screen Tube Installation into Brick and Ungrouted Masonry -::m.
(Hollow CMU Similar)
1FilT : rrt
a v �•••
. .,„;2. a 1 7;::. ,I,
° 1111 ' a �, •_; a,,, a ; 1. Drill -Drill hole to •
:; ;;:: r:; specified diameter and IMBREA
depth. Drill should be ..
1. Drill -Drill hole 2. Clean- Remove dust from hole with set on rotation only. p�f ' �-
to specified oil -free compressed air. Clean with
diameter and nylon brush and blow out remaining
depth. dust. Note: Dust left in hole can reduce 2. Clean-Remove compressed i dust n with hole with sh
compressed air. Clean with nylon brush and
the adhesive's holding capacity. blow out remaining dust. Note: Dust left in hole
can reduce the adhesive's holding capacity.
O D 6 L D9 {� \ .T431
" ; •; 3. Fill -Dispense bead of adhesive oft to the side to 4. Insert - Anchors must be
i t check for proper mixture (a uniform gray color) clean and oil tree. Insert
3. Fill -Fill hole 1/2 - full, 4. Insert- Anchors must be before using. Fill screen completely. Always start anchor. turning slowly
o starting from bottom of clean and oil free. Insert by filling from the bottom of the screen to avoid until the anchor contacts
hole to prevent air pockets. anchor, turning slowly until the air pockets. Insert screen into hole. the bottom of the screen.
;-, Withdraw nozzle as hole anchor contacts the bottom of Do not disturb during
o fills up. the hole. Do not disturb during cure time.
cure time.
`SET,PAC Mlxfng Instrectians; .4
o
1. �=� I 2. �� 3. 4.
=- �i' a
Remove cap. Insert
\ Remove red end Insert cartridge f' / black mixing rod into , Turn rod clockwise
�� ----�� cap at bottom into tool. s i r -4,,,, center of cartridge. to thread into
of cartridge. � mixing paddle.
•
5. 6. 7. n • 8. �`, r': N Dispense SET -PAC
-� - 4 immediately after opening.
^• I ' I,, Set drill on , .., If left in the cartridge, mixed
forward. mix I Squeeze ' epoxy will harden in 5 -
j
• i up and down Cartridge. minutes. The epoxy in the cartridge may
Push rod to '1.:„=, /i I � / ,, -� ` lb� for 2 minutes ) ' L- i, Remove also reach a temperature in excess of
L bottom o m, Attach sEr c at 1000 rpm , -S rod. Install 200 °F (93 °C). Use caution handling or
.. T f cartridge. 1 t o drill. � tC minimum. \ nozzle. disposing of cartridge until cool.
35