Loading...
Correspondence FILE COPY December 16, 2003 Mike Kezeor Gray Purcell PO Box 23516 Portland, OR 97281 RE: SITE WORK FOR NEW OFFICE BUILDING Site Permit: SIT2003 -00032 Construction Type: VN Tenant Name: Minuteman Press Occupancy Type: B Address:75S -C7. 41 SW Hermoso Way Occupant Load: NA Area: 7,250 Sq Ft Stories: 3 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The submitted plans are approved subject to the following. EROSION • Erosion control measures shall be in place prior to excavation or grading. SPECIAL INSPECTION • Special inspection is required for Structural fill beneath the foundations. The special inspection agency of record, Carlson Testing, shall furnish inspection reports to the Engineer of Record, Willamette Engineering and Earth Services, the General Contractor, Gray Purcell, Inc. and the City of Tigard, Building Division, attention Hap Watkins. All discrepancies shall be brought to the immediate attention of the general contractor for correction. The special inspector shall submit a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance with the approved plans and specifications and the applicable workmanship provisions of the code. 1701.3 OSSC ACCESSIBILITY • Accessible walkways and routes shall not exceed a running slope of 1 unit vertical in 20 units horizontal (5% slope). Cross slopes shall not exceed 1 unit vertical in 50 units horizontal (2% slope). • Accessible parking spaces and access aisles shall be located on a surface with a slope not to exceed 1 unit vertical in 50 units horizontal in all directions. 1104.4.3 OSSC 'a DEFERRED SUBMITTAL • The design of the elevated walkway and guardrail on the North side of the structure will be deferred. After review and approval, the elevated walkway and guardrail will be constructed in conjunction with the foundation. • Tualatin Valley Fire & Rescue "Fire Flow & Hydrant Worksheet" will be deferred. Deferred submittals will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC American with Disabilities Act (ADA): It shall be the responsibility of the Architect, Engineer, Designer, Contractor, Owner and Lessee to research the applicability of the ADA requirements for the structure. The City of Tigard reviews the plans and inspects the structure only for compliance with Chapter 11 of the OSSC which may not include all of the requirements of the ADA. Premises Identification: Approved numbers or addresses shall be provided for all new buildings in such a position as to be plainly visible and legible from the street or road fronting the property. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Brian Blalock, Senior Plans Examiner Ui1 ll;. IL,vr i December 11, 2003 �� e °�� dl ylmg ��f CITY Mike Kezeor OF TIGARD Gray Purcell REGON PO Box 23516 Portland, OR 97281 RE: SITE WORK FOR NEW OFFICE BUILDING Site Permit: SIT2003 -00032 Construction Type: VN Tenant Name: Minuteman Press Occupancy Type: B Address:7 3'15'7545 SW Hermoso Way Occupant Load:NA Area: 7,250 Sq Ft Stories: 3 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The following information is required prior to the approval of the Site Permit. SOILS • • The soils report indicates structural fill beneath foundations and requires compaction. A special inspector shall be retained by the applicant. Please provide the name of the special inspection agency. CA/LL S OIJ RETAINING WALL • There appears to be an elevated walkway on the North side of the building. Provide a design for the retaining wall and guardrail associated with the walkway. FOOTING DRAINS • The soils report submitted requires footing drains at the perimeter of the foundation. The soils report indicates that the drains shall not be tied to the downspout or rain drain system. Revise Utility Plan sheet C -4 to indicate the location and drainage of footing drains. FIRE REVIEW • Complete the enclosed "TVF &R FIRE FLOW and HYDRANT WORKSHEET ". The allowable area permitted and the number of hydrants required will be based on the worksheet. Also, please clarify the location of the nearest hydrant on sheet C -4. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Brian Blalock, Senior Plans Examiner 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772