Loading...
Report from: bob i o: Mike Kezeor hate: 1/31/2005 Time: 10:U/:12 AM rage 2 of 2 AM a 00 .5 - x .32 M eedoteree • go.saecu: y curd Eia,: SeleKeea January 31, 2005 Mr. Mike Kezeor Gray Purcell Contractors, LLC P.O. Box 23516 Portland, OR 97281 -3516 Re: Sanitary Sewer Discharge Modifications, Simplex Pump System for Office Structure, Hermoso Way Tigard, Oregon .. '7SS5 Dear mike: Willamette Engineering and Earth Sciences (Willamette) has completed a review of'options to mitigate the sanitary sewer discharge problems at the referenced site. Due to the elevation discrepancy in the City of Tigard sanitary sewer main, adequate fall from the referenced structure to the main is not available to provide "gravity" drainage. Willamette believes that a grinder pump system installed in the structure, discharging under pressure to the existing service line should provide the building with the necessary sanitary service with the least amount of disruption. Given the relatively low inflow and water use in the structure, a single pump system (simplex) should be sufficient for the installation. Willamette appreciates the opportunity to be of service in this matter. If you have any questions, please contact the undersigned at (503) 623 -0304. Sincerely, 7 V1 eff Eugl readag acrd Sa'tt.4 S ee eea ir G1- ',. .. .... ..... 7tPiRE5 O613QiOG Robert J. Slyh, P.E. Principal P.O. Box 1139, Dallas, OR 97338 (503) 623 -0304 Simplex Pump System- 03\rjs:1 ____,Icji,LLIILLIL r' ^# — /0, 9 i /Lik _.(U1 if cii -5 From: Bob To: Hap Watkins Date: 8/17/2004 lime: 9:38:22 AM Page 1 of 1 A M, Crv5 — c37,0 3 Z V e tt ainetre 5rsg ceerttag cued &via Scie eed August 17, 2004 • Mr. Hap Watkins Building Department, City 5 of Tigard 13125 SW Hall Boulevard Tigard, Oregon 97223 Re: Certification of Storm Water Swale Improvements, Minuteman Press Building, 7555 Hermoso Way, Tigard, Oregon Dear Mr. Watkins: Willamette Engineering and Earth Sciences (Willamette) has prepared this lettetto document the observation of the storm water facilities at the above referenced site. Willamette believes that the construction of the storm water detention facilities is in compliance with the approved design and meets the design intent. We trust that this letter is sufficient to satisfy City of Tigard requirements regarding the construction. If you have any questions, please call me at (503) 623 -0304. Sincerely, �imette EorgeNeerifff aged ganti Selesceed . PRO, �, ED f r e r l L....., v ` a O 199 ,..t FNT J. s EXPIRES 06/30/06 Robert J. Slyh, P.E. Principal • P.O. Box 1139, Dallas, OR 97338 (503) 623 -0304 Minute Man Storm Water Certification- 04\rjs:1