Loading...
Report 06/23/2005 07:06 5035988705 GEOPACIFIC ENG INC PAGE 01 /% 5 7' 4 ;zi I' / 5 / 3l sr 57 1-- !�/ y GeOP • [nglneerinq;`tnc , Real -World Geotechnical Solutions Investigation • Design • Construction Support June 23, 2005 Project No. 03 -8183 Attention; Andy Venture Properties, Inc. 4230 Galewood Street, Suite 100 Lake Oswego, Oregon 97035 Fax No. 503 -670 -9099 RE: SOIL ENGINEER'S REVIEW OF FOUNDATION EXCAVATION SUBGRAOE LOT 49 SUMMIT RIDGE TIGARD, OREGON References: i, GeoPacttk Engineering Ina, Geotechnlcal Investigation, Summit Ridge Development, Tigard, Oregon, dated May 12, 2003, 2. GeoPacifio Engineering Inc,, Soil and Wall Engineer's Summary at Conclusion of Earthwork, Summit Ridge Development — Phase 1, Tigard, Oregon, Revised January 21, 2004 (should state 2005). This letter is to confirm that GeoPacific Engineer, Jim lrnbrie, recalls visiting Lot 49 when it was excavated, however no letter report was apparently generated immediately after the visit. We are sorry for the inconvenience. The observed native voile ore tiff clayey alit and the observed compacted fills are clay with rock. Based on our recollection of observations, it is our opinion that the foundation subgrade was adequate for spread foundation support to a maximum allowable bearing pressure of 1,500 psf. Minimum reinforcement has been recommended in lire above Reference 2, The existing rockery walls at the rear of the lots are adequately setback from the foundation such that they are surcharged by the proposed construction. Our work scope pertains to a geotechnical engineer's foundation excavation review only and the conditions existing and exposed at the time of our site visit. No deck footing, patio, or other appurtenant structure siingrartPs were observed. Our work was performed to the current local ctondordc of practice. No other warranty is herein expressed or implied. If you have any questions, please call. Gincerely, GeoPacific Engineering, Inc. ,� �s 0 PR Ope s �E 061NEe ,ids 4 14743 c " . ) OREGON James D. Imbrie, P,E., C,E. o' Geotechnical Engineer v,� t . 4 .4. r6 �-,✓ _ 0: 10' / -43 �2 5 —cur) 5g / 36 7`ici- z e/c - w y - p - 1 GeoP, t Engineering. Inc;; �f1 ' `' 7015 Real -World Geotechnical Solutions Investigation • Design • Construction Support March 22, 2005 Project No. 03 -8183 Attention; Andy Venture Properties, Inc. 4230 Galewood Street, Suite I Ci Lake Oswego, Oregon 97035 Fax No. 503 - 670 -9099 RE: SOIL ENGINEER'S REVIEW OF FOUNDATION EXCAVATION SUBGRADE LOTS 26, 30, 49 SUMMIT RIDGE b � TIGARD, OREGON / ' t . r 1 References: /-, 1. GeoPacific Engineering Inc., Geotechnical Investigation, Summit Ridge Development, Tigard, Oregon, dated May 12, 2003. 2. GeoPacific Engineering Inc., Soil and Wall Engineer's Summary at Conclusion of Earthwork, Summit Ridge Development — Phase 1, Tigard, Oregon, Revised January 21, 2004 (should state 2005). . GeoPacific Engineer, Jim Imbrie, visited the site yesterday to review the foundation excavation subgrades on the above - referenced lots. The observed soils are stiff native soils or compact engineered fill consisting of clayey silt, with rocks. Some mucking may be required if the subgrade is left exposed to wet weather for a long duration, however the current subgrade is fairly dry. The foundation subgrades are appropriately setback from the rear yard rockery retaining wall. p^c n. cu r ob er , ati 'nc it is our ur nrlininn that the current foundation subgrade is adequate for spread foundation support to a maximum allowable bearing pressure of 1,500 psf. • Our work scope pertains to a geotechnical engineer's foundation excavation review only and the conditions existing and exposed at the time of our site visit. No deck footing, patio, or other appurtenant structure subgrades were observed. Our work was performed to the current local standards of practice. No other warranty is herein expressed or implied. If you have any questions, please call. Sincerely, GeoPacific Engineering, Inc. • r 14743 OREGON 9 James D. lmbrie, P.E., C.E.G. °� Geotechnical Engineer , t