Loading...
Permit Support Document CITY OF TIGAR[ " -, " 24 -Hour BUILDING Inspection. Line: (503) 639 - 4175 Oocia(( INSPECTION DIVISION Business Line: (503) 639 -4171 MST BUP Received Date Requested 7 -( AM PM BUP Location I a a 75" ,t l Suite MEC Contact Person Ph ( ) ( tc37 PLM Contractor Ph ( ) SWR BUILDING Tenant/Owner ELC Footing ELC Foundation Access: Ftg Drain ELR Crawl Drain Slab Inspection Notes: SIT Post & Beam Shear Anchors Ext Sheath/Shear Int Sheath /Shear • Framing Insulation Drywall Nailing Firewall Fire Sprinkler Fire Alarm Susp'd Ceiling 6 (---; Roof Other: Final PASS PART FAIL PLUMBING Post & Beam Under Slab Rough -In Water Service Sanitary Sewer Rain Drains Catch Basin / Manhole Storm Drain Shower Pan Other: • Final PASS PART FAIL MECHANICAL Post•& Beam • Rough -In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough -In UG /Slab Low Voltage Fi e Alarm Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd. • ASS 'ART FAIL - SI Please call for reinspection RE: ❑ Unable to inspect - no access Fire Supply Line ADA Approach/Sidewalk Date Inspector 7"1, Ext Other: Final DO NOT REMOVE this inspection record from the Job site. PASS PART FAIL •