Loading...
Correspondence e/A ? —a 9 (774 ../ tit t CITY OF TIGAR OREGON 10/22/02 Avi Pradhan 921 S.W Morrison Portland, OR 97205 Re: Brahma Premananda Ashram Addition, at 11505 S.W Tigard Or. 97223 Dear Sir, We have received your letter dated October 17 2002, Addressing the number of the guestrooms and anticipated occupant load so as we may have a better understanding of proper occupancy classification for your project. As per your letter, We have placed the occupant load of 10 or less for your facility. It will be reviewed as a congregate residence with a limited occupant load of 10, Thus you will not be required to meet all of the requirements for a R1 (apartment or hotel) but will be reviewed as a R3 (large single family residents). If this assumption is incorrect, Please contact this office as soon as possible. Si, c'erel; v ) . . D.41 J nes Senior Plans Examiner C. File Via facsimile 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639-4171 TDD (503) 684 -2772 /Vag -o� 4, AVI PRADHAN - ARCHITECTURE OCTOBER 17TH 2002 MR. DARYL JONES SENIOR PLAN EXAMINER CITY OF TIGARD, 13125 SW HALL BLVD. FAX (503) 624 -3681 TIGARD OR 97223 RE: BRAHMA PREMANANDA ASHRAM ADDITION, AT 11505 SW. HALL BLVD., TIGARD OR 97223. DEAR SIR: I WOULD LIKE TO BRING THIS TO YOUR ATTENTION THAT PLANS SHOW THAT THERE ARE 8 SINGLE GUEST ROOMS ARE BEING ADDED TO THE EXISTING HOUSE, WHICH HAS 2 BEDROOMS. CONSIDERING THIS ARRANGEMENT, THERE WILL TO BE MORE THAN 10 PERSONS STAYING AT THE FACILITY, WHICH IS MORE LIKE A LARGE HOUSE THAN ANY COMMERCIAL LODGING FACILITY. I REQUEST YOU TO REVIEW THE PLANS CONSIDERING THE ABOVE INFO AND ISSUE THE BUILDING PERMIT. THANK YOU. S I NCEREL -. ;lid "RADHA ARCHITECT. x A HARD COPY OF THIS LETTER IS MAILED TO YOUR OFFICE. A R C H I T E C T Arizona • California • Connecticut New York • New Jersey • North Carolina • Oregon 921 S.W. Morrison • Suite 415 Portland, Oregon 97205 Phone: (503) 222 -2140 • Fax: (503) 222 -4942 133, o2- h7 AVI P RA D H A N • A R C H I T E C T U R E APRIL 4TH 2002 MR. DARYL JONES SENIOR PLAN EXAMINER CITY OF TIGARD, 13125 SW. HALL BLVD. TIGARD, OR 97223 RE: BUILDING PERMIT AT 11505 SW. HALL BLVD, TIGARD, OR 97223 FOR BRAHMA PREMANANDA TEMPLE. DEAR SIR, HEREWITH I AM SUBMITTING 3 COPIES OF REVISED DRAWINGS FOR YOUR REVIEW. ITEMS SHOWN ON YOUR REVIEW SHEETS ARE CORRECTED AS FOLLOWS. 1. PLEASE NOTE THAT NOTES ARE ADDED ON A -14 SHOWING UL NUMBERS FOR 1HR. CONSTRUCTION. FRONT PORCH STRUCTURAL COLUMNS, BEAMS AND CEILING WILL MEET 1HR RATING, ALSO SPRINKLER HEADS ARE ADDED IN THIS AREA. 2. ACCESS CLEARANCE OF 18" IS ADDED TO EXIT DOORS, SHEETS A -02, A -03. 3. FIRE EXTINGUISHERS SHOWN SHEETS A -02, A -03. (3) LOWER LEVEL, (2) UPPER LEVEL. 4. PLUMBING FIXTURES SHOWN ON THE PLANS ARE ADEQUATE FOR THE OCCUPANT LOAD. PLEASE SEE THE SEPARATE LETTER. 5. CERAMIC TILE FINISH 6'-O" IS ADDED TO REST ROOM WALLS ON SHEET A -09. 6. A THREE COMPARTMENT SINK IS SHOWN IN THE KITCHEN, THIS SHOULD PROVIDE REQUIRED HAND WASH. THE DISHWASHER WILL BE A SMALL RESIDENTIAL TYPE, IT WILL NOT REQUIRE STEAM HOOD. 7. FOOTING DRAINS ARE SHOWN ON SHEET A -07, A -08 & A -13. 8. & 9. DRAWINGS ARE CORRECTED TO SHOW ENGINEERS CALCS. 10. & 11. DETAILS ARE ADDED ON SHEET S -6 SHOWING THESE ITEMS. 12. RETAINING WALL DETAILS ARE CORRECTED TO COMPLY WITH PAGE 16 & 17 OF STRUCTURAL CALCS. RECEvED A R C H I T E C T 7 Arizona • California • Connecticut APR - R 7f New fork •New Jersey •North Carolina • Oregon CITY UT HUARD BUILDTh G .DIISION 921 S.W. Morrison • Suite 415 Portland, Oregon 97205 Phone: (503) 222 -2140 • Fax: (503) 222 -4942 13. WATERPROOFING FOR BELOW GRADE WALLS WILL BE 'MAR FLEX 500', 'CARLISLE CCW -701' OR APPROVED EQUAL. 14. & 15. KITCHEN GREASE DUCT ENCLOSURE IS 2HR RATED SEE A -02, 3/Al2 & A14- WALL TYPE 5, DUCT MATERIAL BLACK IRON 14G.. 16. CUT SHEETS FOR HVAC UNITES ARE ENCLOSED. 17. GAS RISER DIAGRAM IS AND PIPE SIZES ARE SHOWN ON M -03. 18., 19.,& 20. SEE REVISED KITCHEN LAY -OUT, AND REVISED P -05 FOR THESE ITEMS. 21. & 22. ROOF DRAIN SIZE AND LOCATION IS COORDINATED WITH CIVIL DRAWINGS AND 4 SCUPPER OVERFLOWS ARE SHOWN ON SHEET A- 04,P01. 23. GREASE INTERCEPTOR IS RELOCATED OUT SIDE THE BUILDING. SEE P -01 & P -05. 24. BOOSTER PUMP AND BACK FLOW PREVENTER IS ELIMINATED. A 2 V WATER SERVICE IS SHOWN. 25. EJECTOR PUMP AND BASI IS ELIMINATED. SANITARY WASTE IS WITH GRAVITY FEED 6" , TO SAN. MANHOLE. 26. THE FIRE PUMP BOOSTER IS ELIMINATED. 27. FDC LOCATION WILL BE COORDINATED BY SPRINKLER CONTRACTOR AS SHOWN ON THE CIVIL DRAWINGS. 28. ENTRANCE PORCH IS RE DESIGNED FOR 1HR FIRE RATING AND SPRINKLER HEADS ARE ADDED SEE FP -2. 29. & 31. SPRINKLER CONTRACTOR WILL SUBMIT SYSTEM CALCS. 30. THE GREASE HOOD HAS INTEGRATED FIRE SUPRESSION SYSTEM. SEE KITCHEN EQUIPMENT SPECS. 32. AUDIO /VISUAL ALARM IS PROVIDED IN BOTH TOILETS. SEE E -07. 33. COMPLIED ON SHEET E -07. 34. THE CUT SHEETS FOR FIRE ALARM SYSTEMS WILL BE SUBMITTED FOR APPROVAL BY SPRINKLER /FIRE ALARM CONTRACTOR. PLEASE REVIEW THE DRAWINGS AT YOUR EARLIEST, TEMPLE BUILDING COMMITTEE WOULD LIKE TO HAVE GROUND BRAKING ON JUNE 8TH 2002. THANK YOU. SINCE LY, A J P' ADHAN ' ":'.- P ? -� ne , ,, ,, j 1 1 I CITY OF TIG� January 15, 2002 OREG Victor M Nobleza fige6 -1-1-5 Hall Blvd Tigard, Or 97223 RE: Brahma Premananda Temple application The City of Tigard Building Division has reviewed the submitted building plans for the above referenced address in accordance with the Oregon Structural Specialty Code (OSSC), 1998 edition and the Uniform Fire Code, 1997 edition as amended by Tualatin Valley Fire & Rescue. The following items need to be addressed and are not in compliance with the above mentioned Codes: A01 -A13 1) A2.1 Occupancy's are required to meet V l hr minimum construction. Current plans don't show enough detail to be in compliance with this requirement. Please provide additional details to assure code compliance of all walls, roof ceiling, and entry canopy, system meet this level of protection. 2) Building is required to be in compliance with ADA. Doors LD02, LD06, UDO3 and UDO4 need the minimum access clearances along the sides of 18 ". 3) Fire extinguishers are required 1/3000 sqft. minimum of two per floor. Currently only one per floor is shown on plans. 4) Plans are not in compliance with Table 29 -a for the minimum of plumbing fixtures. Provide additional details showing fixture heights and spacing in compliance with ADA. 5) Sanitation: Walls within two feet of the front and sides of urinals and water closets shall have a smooth hard non absorbent surface. To a height of not less than 48 inches. 6) Note: Kitchen shows only one pair of sinks, Please check with the health department for the minimum amount of sinks required. 7) Footing drains are shown on the civil plans and not referenced on the details or Structural sheets. S1-S6 8) Upper level framing S3: Beam size along grid line 2 is different than what is shown on the engineering provided please correct. 9) Footing plan 51: pier footings at B6 & F6. Specifications need to be transferred to the plans from the Engineers calc's to the footing schedule. 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 10) Footing plans S 1: Column details for grid line 2 are '/2 on the plans and the balance is in the Engineers calc's. Please incorporate into the plans all specifications, details and crossections. 11) Please detail the connections between different wall types and their locations. Plans call for several basement wall types and retaining walls that intersect. All of these walls have different rebar requirements, footing details, and surfacing materials. 12) S2 details differ from engineering on pages 16 &17 please specify which detail is applicable and where. 13) All below grade walls are required to be waterproofed please specify product and application method. M1 -M4 14) Kitchen Grease ducts that penetrate the ceilings; floors, roofs or walls shall be in closed with in a rated shaft. And shown on the architectural sheets. 15) Grease ducts shall be a minimum of 16gauge steel. 16) Provide cut sheets on all HVAC equipment and weight loads. Engineer shall review all HVAC loads for seismic and static loading on the structure. 17) M3 sheet indicates the use of gas for the roof top units. Please provide a gas line drawing showing all connected loads in BTU's, size of pipe, gas pressure, and total run. 18) Commercial dishwashers require a class 2 hood for steam. Pl -P5 19) Food prep sinks shall be indirectly connected to the drainage system by means of an airgap or airbreak into an approved receptor. 20) Receptors shall be approved for the use and purpose and shall have shape and capacity to prevent splashing and flooding. Receptors shall be readily accessible for inspection and cleaning. 21) Rain drains and Storm drains, tie -in locations do not match civil drawings for connection points and pipe size. 22) Plans show rain drains connected to overflow drains using the same riser, UPC 1105.4 states overflow drains shall be piped to an approved point of discharge and shall be independent of any other piping system. 23) Plans show a grease interceptor, located in lounge: interceptors shall be readily accessible for servicing and periodic removal of accumulated grease, scum, oil, or other floating substances. 24) Civil plans show a 2" domestic water line connected to a city main. City main pressure is recorded at 107 psi (static) and 98 (residual). Plumbing plans show a 3" domestic riser, reduced pressure back flow preventer and Booster pumps? 25) Plans show a sewage ejector pump and basin, Civil plans show the sewer lateral at 213.65 approximately 40 "inches below finish floor elevation. Pump may not be required. Fp l -FP -3 26) Room LL 11 has several space conflicts between these drawings and others. Clearances, working spaces, power panels, water riser location, sprinkler riser location, and fire pump and booster pumps may not be required due to water pressure at this location. 27) FDC is not allowed to be on the side of the structure see civil drawings for proper location. Also the Ashram will be required to have sprinklers and a separate FDC located with -in 70 feet of a fire hydrant. 28) Main entrance, canopy, is required to be protected by sprinkler system. 29) Sprinkler system should be differed submittal and designed by a sprinkler contractor. 30) Type 1 grease hoods require fire suppression systems. 31) Submit sprinkler calculations and cut sheets. Fire Alarms 32) Plans show visual only devices in the toilet room's UFC sec 1007.3.3.3.4 states alarms in toilet rooms shall be both visual and audible. 33) Building is being provided with access control devices. Note all door contacts shall fail in the open posisition upon activation of the smoke or fire detection system. 34) Provide all cut sheets on the devices in the system. City of Tigard Engineering Comments: Condition #11 (ODOT ROW dedication for Hall) Condition #14 (Pay fee in -lieu of undergrounding = $880.00 Due to the items identified as noted above the plan review has been terminated, until the items have been properly addressed. In no way should this partial review be considered as a complete review. Please submit revised plans showing compliance with codes. If you have any questions regarding this review, please contact me at (503) 369 -4171 ext. 392. Si , D 1 ones lan Examiner c. Hap Watkins, Supervising Inspector Building Inspectors File