Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Correspondence
/ - oz9 o 3 ti - ez9 6 7 / City of Tigard • CAR Memorandum To: Dana Reynolds y ���� COPY From: Hap Watkins, Inspection Supervisor Re: 10225 SW Hall Blvd, Tigard Date: April 17, 2008 There eight pages following this FAX memo. The original building permit is marked #1 in bold and shows the date of issue. The revised permit marked #2 is for revisions and additional fees. The letter from Dr. Gerig to Gary Lampella marked #3 and dated 3/15/02 is the request that the building be granted a certificate of occupancy. It also has a hand written response by Mr. Lampella dated 3/19/02 saying that a certificate of occupancy would be granted if all final inspections were approved. I remember that though the walkway to the public way was not installed at this time, it would be reviewed for exception when the plans came in for the first tenant improvement. The inspection report dated 3/20/02 marked #4 showing final approval for the building permit BUP2000 -00403 was subsequently revised to "fail" by the senior inspector Rick Bolen because there was still the outstanding issue of the path to the public way. Somewhere along this line, there was no official conditional certificate of occupancy issued. Dr. Gerig occupied the premises in the last week of March 2002. The permit BUP2003 -00691 marked #5 was issued for a tenant improvement for suite 103. During plan review it was determined that the occupant load of that part of the building not occupied by Dr. Gerig would not require the exit corridor and the path to the public way was not required. The inspection report dated 2/3/04 marked #6 was generated after it was clear that a permanent certificate of occupancy could, in fact, be granted for permit BUP2000- 00403. The certificate of occupancy marked #7 was issued 2/4/04. I have included the activities report with notes as page #8. If you have questions, feel free to call me at 503 - 718 -2440 BUILDING PERMIT CITY OF TIGARD PERMIT #: BUP2000 -00403 DEVELOPMENT SERVICES DATE ISSUED: 6/7/01 '.,!.1 •I i � 13125 SW Hall Blvd., Tigard, OR 87223 (503) 639-4171 PARCEL: 1 S135AA -01901 SITE ADDRESS: 1.8#25 SW HALL BLVD 1 t z SUBDIVISION: METZGER ACRE TRACTS ZONING: C -N BLOCK: LOT: 037 JURISDICTION: TIG REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION 1 CLASS OF WORK: NEW FIRST: 6,144 s; N: S: E: W: 1HR TYPE OF USE: COM SECOND: sf PROJECT OPENINGS? TYPE OF CONST: 5N sf N: S: E: W: OCCUPANCY GRP: B TOTAL AREA: 6,144.00 sf ROOF CONST: C FIRE RET? OCCUPANCY LOAD: 52 BASEMENT: sf AREA SEP. RATED: GARAGE: sf OCCU SEP. RATED: STOR: 1 HT: 15 ft BSMT ?: N MEZZ ?: N READ SETBACKS REQUIRED FLOOR LOAD: 60 psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET: DWELLING UNITS: FRNT: ft REAR: ft PRO CORM: HNDICP ACC:Y BEDRMS: BATHS: IMP SURFACE: VALUE: $ 390,758.00 Remarks: New Office Building Owner: Contractor: WAYNE L. GERIG J T. ROTH CONSTRUCTION INC 15430 SW BOBWHITE CIRCLE 12600 SW 72ND AVE #200 BEAVERTON, OR 97007 TIGARD, OR 97223 Phone: 503- 224 -1460 Phone: 639 -2639 Reg #: LIC 31700 FEES REQUIRED INSPECTIONS Type By Date Amount Receipt Mechanical Permit Require Susp Ceilng Insp Electrical Permit Required Appr /sdwlk Insp PLCK CTR 9/25/00 $887.75 27200000000 Plumbing Permit Required Final Inspection FIRE CTR 9/25/00 $546.31 27200000000 Foot/Found Insp PARK CTR 6/7/01 $441.00 27200100000 Post/Beam Insp PRM2 CTR 6/7/01 $1,325.84 27200100000 Framing Insp Roof nailng Insp (additional fees not listed here) Insulation Insp Shear Wall Insp Ttal $4,863.48 Gyp Board Insp This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires yip oltaw the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 t ough OAR 952 - 001 -1987. You may obtain a copy of these rules or direct questions to OUNC by calling (503) P 99 or 1 -800- 332 -2344. f Pemtiittee ' r 1 i ( r - , � f Signature: \ ../ l: `�, ` l __ —..\--/ . —. Issued By: /.k -r,t^- �Z• /Lc) Call P it 639 -4175 by 7 p.m. for an inspection the next business day 4 t i' grt6 ?Vl/OAI. 1 // � ^ BUILDING PERMIT C ITY OF TIGARD PERMIT #: BUP2000 -00403 DEVELOPMENT SERVICES DATE ISSUED (,/74 ` --- 13125 SW Hall Blvd., T igard, OR 97223 (503) 639 -4171 PARCEL: 1 S135AA =01901 SITE ADDRESS: SSW HALL BLVD Z ONING: C N e SUBDIVISION: METZGER ACRE TRACTS V. -OCK: ( t, .Z --/. t3/ LOT: 037 JURISDICTION: TIG REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION CLASS OF WORK: NEW FIRST: 6,144 sf N: S: E: W: 1HR TYPE OF USE: COM SECOND: sf PROJECT OPENINGS? TYPE OF CONST: 5N sf N: S: E: W: OCCUPANCY GRP: B TOTAL AREA: 6,144.00 sf ROOF CONST: C FIRE RET? OCCUPANCY LOAD: 52 BASEMENT: GARAGE: sf OCCU SEP. RATED: STOR: 1 HT: 15 ft REQUIRED BSMT ?: N MEZZ ?: N REQD SETBACKS FLOOR LOAD: 60 psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET: • DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC:Y BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING: VALUE: $ 390,758.00 Remarks: New Office Building TIF DEFERRED Owner: Contractor: WAYNE L. GERIG J T. ROTH CONSTRUCTION INC . 15430 SW BOBWHITE CIRCLE 12600 SW 72ND AVE #200 BEAVERTON, OR 97007 TIGARD, OR 97223 Phone: Phone: 639 -2639 Reg #: LIC 31700 FEES • REQUIRED INSPECTIONS T By Date Amount Receipt Mechanical Permit Require Susp Ceilng Insp Electrical Permit Required Appr /sdwlk lnsp PLCK CTR 9/25/00 $887.75 27200000000 Plumbing Permit Required Final Inspection FIRE CTR 9/25/00 $546.31 27200000000 Foot/Found Insp PARK CTR 6/7/01 $441.00 27200100000 Post/Beam lnsp PRM2 CTR 6/7/01 $1,325.84 27200100000 Framing lnsp fnaiing Insp (additional fees not listed here) Insulation Insp Shear Wall Insp Total $21,615.48 Gyp Board Insp This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 -001 -0010 through OAR 952 - 001 -1987. You may obtain a copy of these rules or direct questions to OUNC by calling (503? 2 -6699 or 1 -800- 332 -2344. Pemnittee 1 Signature: u..r l L L6_ ` " . . l /. 1. � I/ aid.) Issued By: ..� Call 639-4175 by 7 p.m. for an inspection the next business day , #1 , . ,, .. ,.,, 4. G $d, Dr. Wayne Gerig 15430 SW Bobwhite Circle Beaverton OR pv : ., City of Tigard Building Dept. FILE COPY Attn , Gary, Lampella 13125 SW Hall Blvd. •- ( ' / '1 41 Ill'- '' Tigard OR I 0 22 � Lv Re: Final occupancy /pedestrian � p y pedestran walkway .` Permit #BUP 2000 -00403 11 : a March 15, 2002 Mr. Gary Lampella: 1 would like to request that the City of Tigard issue a certificate of occupancy for my building at 10225 SW Hall Blvd. 1 understand that this certificate of occupancy is i granted as per the arrangement worked out between my builder, J.T..Roth Construction ,) and your permit coordinator, Sherman Casper. j The agreement settled on is that the requirement for building a corridor exit to the city sidewalk on the south ro rt line of my property be P Pe Y Y P P Y postponed until application for F tenant improvements in my building are made. This will allow time to coordinate with t .' my neighbor to the south in making the required improvements to our shared property j line. Due to the extenuating circumstances of the requirement to make these • improvements, I would also like to request that any and all permit/review fees be • waived by the city for these improvements. I Since all other inspections have been made and approved and lam ready to move my business to this building, your timely approval of this requ will be greatly appreciated. f& ' 7 IP $14 /i (Canes fe-,a vt (/)41 _ w e Ca t t i e..� e 0 - ct f®l, C � t et,A c ` Cdrl 4 r u t" C 11'f ON © � (". S incerely: \ Tc 4a-t t' r :s b■ v;1Of w 9 , P kkl -t------0 TIA e Pev.M; r - Jvev t cw �c ej crre Dr Wayne Gerig \ �f . 5 I �� f ¢- f k r Cc �� ri � /c t ( a I 6 f CI 41 01 ( .1.ce.r a i ' , 7 �a�+K C� b j� � CJa,veJ h y 1 -h e F , tI;I dl� Dlv /f(EJ. may (131 (� Ll o„ v c 1 co, �r�' „; f- �UP.`laeo -yv3 i , . - ;/1 bvc yr c�d ,` G/( Fiha( t r h g Pech 0 a're a ro vcaf 6 y . 4 -rte tat r1;1I A;' . CITY TIGARD CERTIFICATE OF OCCUPANCY " ' COMMUNITY DEVELOPMENT PERMIT #: BUP2000 -00403 TIGARD 13125 SW Hall Blvd., Tigard, OR 97223 503.639.4171 DATE ISSUED: 7/16/2001 PARCEL: 1 S 135AA -01901 ZONING: C -N JURISDICTION: TIG SITE ADDRESS: 10225 SW HALL BLVD SUBDIVISION: METZGER ACRE TRACTS BLOCK: LOT: 037 CLASS OF WORK: NEW TYPE OF USE: COM TYPE OF CONSTR: 5N OCCUPANCY GRP: B OCCUPANCY LOAD: 52 TENANT NAME: REMARKS: New Office Building Owner: WAYNE L. GERIG 15430 SW BOBWHITE CIRCLE BEAVERTON, OR 97007 Phone: 503 - 579 -0203 Contractor: 503 - 252 -8015 639 2639 J T ROTH CONSTRUCTION 12600 SW 72ND AVE #200 TIGARD, OR 97223 Phone: 503- 252 -8015 639 -2639 Reg #: LIC 31700 This Certificate issued 2/4/2004 grants occupancy of the above referenced building or portion hereof and confirms that the building has been inspected for compliance with the Sta e of Oregon Specialty Codes for the group, ccupanc , and use under which the referen ed 'ermit was issued. I ill e 1 1 B INSPECTOR BUILD OFFICIAL POST IN CONSPICUOUS PLACE CITY OF TIGARD BUILDING INSPEC7',N DIVISION 24-Hour inspection Line: 638-4176 :•:'Y• ' 63114171 cy.2a264 - 7. 1.0-1 r% Date Requested t.7 /Le g•—• BLD , Location /0 2-1 5 ,'//k Suite MEC • Contact Person Ph PLIM Contractor Ph SWR BUILDING) Tenant/Owner R 0 lef/ 0 0 ELC rig II - ELR • Footing • • Foundation r ; Ftg ••■ Drain FPS Crawl Drain Inspection Notes: SGN Slab err Post & Beam Ext Sheath/Shear Int Sheath/Shear Framing i9/ Y 77:.) Ce ti i — Insulation Drywall Nailing Firewall Fire Sprinkler • Fire Alarm Susp'd Ceiling Roof 1 - • - ART FAIL Post & Beam Under Slab Top Out Water Service Sanitary Sewer Rain Drains Final PASS PART FAIL iiECHANICAL Post & Beam Rough In Gas Line • Smoke Dampers Final • PASS PART FAIL ELECTRICAL Service Rough In UG/Slab Low Voltage • Fire Alarm Final • PASS PART FAIL • • SITE Backfill/Grading Sanitary Sewer Storm Drain ] Reinspection fee of $ . required before next inspection. Pay at City Hall, 13125 SW Hail Blvd . Catch Basin Fire Supply line [J Please call for reinspeciion RE: [J Unable to inspect - no access , ADA Approach/Sidewalk Date OM Iniecto r • Ext , Other , • PASS PART FAIL DO NOT REMOVE this inspection record from the job site. . ; • _ ..„. CITY OF TIGARD BUILDING PERMIT PERMIT #: BUP2003 -00691 , 0 ,1 A DEV W H O P rd RVICES 639 - 4171 DATE ISSUED: 1/15/04 ' 13125 SITE ADDRESS: 10225 SW HALL BLVD 103 PARCEL: 1S135AA-01901 SUBDIVISION: METZGER ACRE TRACTS ZONING: C -N BLOCK: LOT: 037 JURISDICTION: TIG REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION CLASS OF WORK: ALT FIRST: sf N: S: E: W: TYPE OF USE: COM _ SECOND: sf PROJECT OPENINGS? TYPE OF CONST: 5N : sf N: S: E: W: OCCUPANCY GRP: B TOTAL AREA: 0 sf ROOF CONST: FIRE RET? OCCUPANCY LOAD: 15 BASEMENT: sf AREA SEP. RATED: STOR: HT: ft GARAGE: sf OCCU SEP. RATED: BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED FLOOR LOAD: psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET: DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC: BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING: VALUE: $ 23,520.00 Remarks: Tenant improvement, new chiropractic clinic existing shell building. Owner: Contractor: WAYNE L GERIG OD OWNER 10225 SW HALL BLVD TIGARD, OR 97223 Phone: 503 - 244 -1004 Phone: Reg #: FEES REQUIRED INSPECTIONS Description Date Amount Mechanical Permit Require [BUPPLN] PIn Rv 12/16/03 $177.91 Electrical Permit Required [FLS] FLS Pln Rv 12/16/03 $109.48 Plumbing Permit Required BUILD Permit Fee 1/15/04 $ 273.70 Framing dsp [BUILD] Gyp Board Insp [TAX] 8% State Surchart 1/15/04 $21.90 Final Inspection (additional fees not listed here) Total $975.99 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 -001- 010 trough OAR 952- 001 -0100. You may obtain a copy of these rules or direct questions to OUNC by call (503) 246 -6. • • or 1- 800 - 332 -2344. / //^per 0 Perm ittee Signature: ( 4- Call 639 -4175 7 .m. for an inspection the next business da p p day 4/5 CITY OF TIGARD 24- Hour Inspection Line: (503) 639.4175 BUILDING ; y x itilBT INSPECTION DIVISION Business Line: (503) 639.4171 � ) " If) � r l �� KdVV Received Date Requested 2 / 3 / 0 AM PM SUP n Location k 2 2 '� QJ Suite MEC Contact Person Ph ( ) PLM Contrac /� (� Ph ( ) SWR LDI Tenant/Owner V C-, dl lJa t0 c e- ELC Footing ELC Foundation Access: Ftg Drain � _ ELR Crawl Drain Slab Inspection Notes: SIT • Post & Beam Shear Anchors Ext Sheath/Shear Ina Sheath/Shear - Fr G Drywall N C C „ Q a Drywall Nailing � --�- Firewall Fire Sprinkler Fire Alarm Susp'd Ceiling Roof ina PART FAIL PLUMBING Post & Beam Under Slab Rough -In • Water Service Sanitary Sewer Rain Drains ' Catch Basin / Manhole Storm Drain Shower Pan Other: Final PASS PART FAIL MECHANICAL Post & Beam Rough -In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough -la UG/Slab Low Voltage Fire Alarm Final Reinspection fee of $ _ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd. PASS PART FAIL SITE Q Please call for reinspect'on RE: [] Unable to inspect — no access Fire Supply Line ADA O II V& Ext Approach/Sidewalk Other: Final DO NOT REMOVE this inspection record from the Job site. PASS PART FAIL • • Tidemark Advantage Darrel "Hap" Watkins - HAP] f ��� ,.� � si L , _ 7 I., ,tr.i::1, III Edit Options Window Help ! ` ai 0 J i " a s � µ „ - # Exile New Open Task Lisle GIBE GIS ` E O i D i � " � . o rs 'W,S v.. „n � '. e Glasc view Add Dclekt Sign Of Print Dacumonts Menu Code Descri I ion Date3 Dis , Dane B Water 0112 Revisd pins subm'd after is 61122001 DONE JMT foundation plan to Bob Poskin A050 Approved plans routed to D 6/13x2001 DONE RDP Foundation revisions. Applicant notified of fees due. bb A068 Hold release to Issued 6/13/2001 DONE BB C100 (F) Issue permit 7t16x2001 DONE BB 0706 FoatlFaund Insp 7/30/2001 PASS RDP 0710 Post/Beam Insp 8/14/2001 PART RDP Ok to subfloor excct C742 Roof nailng Insp 9/12x2001 PART RB Flush nail to sheathingept . back This wall- inspection leave does open not for include plumbing crickets inspe ion. C757 Shear Wall Insp 9/14/2001 PART RDP South WAII C757 Shear Wall Insp 9/24/2001 PASS RDP 0710 Post/Beam Insp 9/24/2001 PASS RDP 0740 Framing Insp 1/10/2002 FAIL RB 0740 Framing Insp 1/11/2002 FAIL RB ELC2001 -00066 (R)- status w/ $798.67 fee due. ❑ ❑ELR2001 -00311 (I- status w/ no i 0760 Gyp Board Insp 1 /16!2002 PASS TLP 0750 Insulation Insp 1/16/2002 PASS TLP C758 Firewall Insp 1/17x2002 PART RB 1 -hr. corridor C760 Gyp Board Insp 1/22/2002 PASS RB r , e50$410;01/" 0762 Susp Ceilng Insp 2122x2002 PASS HAP �� �/ C799 Final Inspection 3/14/2002 TLP OK to do final inspection for c/o per letter 3/15,02 from Dr Wayne Gerig Gary Lamt C799 Final Inspection 3x2012002 FAIL - ' li /4/1/ Q�js � x. �jy � • C802 Final Inspection 2/4/2004 PASS RB Only that part being occupied at this present time. d � - � _ � , p � • -j /� ��(� _ � _ y � 1630 Issue Certificate of Occupa 2/4/2004 DONE JMT 1 ,_. ►'` / i dj /r jON�NK r C974 Phone call (see note) 214x2004 DONE JMT E -MAIL TO SUE R., REQUEST TO PROCESS C/O 0960 Case Finaled 214x2004 DONE RB 0970 Plans sent to microfilming 9/23/`2004 DONE JAM I 1 View /Add Activities Start Tidemark Advanta a .. i ; Inbox - Microsoft Outlook 9 ; 2:19 PM { October 4, 2000 4l 1 ,. Wayne Gerig F I L E COPY error OF 15430 Ge Bobwhite Circle Beaverton, Oregon 97223 OREGON RE: Redwood Center BUP 2000 -0040 1 n'L5 SW Hall Blvcj. Dear Applicant: Your plans have been reviewed for compliance; t :. Aollowmg items require your attention. Site: (ii', vide one (1) van accessible parking stall. Provide details on plans. OSSC, Section 1104. ✓ Geo technical Report: Provide an soils stability and liquefaction potential study. OSSC; Section 1804 • Fire, Code: 6 l! w Provide Two (2) fire hydrants on site. UFC, Section 903.4.2.1. Provide details Fire life Safety: 9 I)) „ . I he south wall shall be constructed with one -hour material. OSSC, Section 5 -A. Provide •,retails. Provide draft stops in accordance with OSSC, Section 708.3.1.2.2. Provide Details. Structuti! The EZ Wall system requires an ICBO approval. Your instruction manual doesn't show one. Provide details. Provide three (3) complete sets of revised drawings. I f you have questions, please call me at 503 -639 -4171 X392. Sincerely, Ro rt D. Poskin, CBO Senior Plans Examiner 13125 SW Hall Blvd., Tigard. OR 97223 (503) 639 -4171 TDD (503) 684 -2772 . } TRANSMISSION VERIFICATION REPORT TIME : 04/1712008 16:11 NAME : TIGARD BUILDING DEPT FAX : 5036243681 TEL . SER.# : BR0D4J479592 DATE,TIME 04117 16:10 FAX ND. /NAME 5032224428 DURATION 00:01:18 PAGE(S) 09 RESULT OK MODE STANDARD ECM 1111 a ° City of Tigard T I GA RD Memorandum To: Dana Reynolds From: Hap Watkins, Inspection Supervisor Re: 10225 SW .Hall Blvd, Tigard Date: April 17, 2008 There eight pages following this FAX memo. The original building permit is marked #1 in bold and shows the date of issue. The revised permit marked #2 is for revisions and additional fees. The letter from Dr. Gerig to Gary Lampella marked #3 and dated 3/15/02 is the request that the building be granted a certificate of occupancy. It also has a hand written response by Mr. Lampella dated 3/19/02 saying that a certificate of occupancy would be granted if all final. inspections were approved. I remember that though the walkway to the public way was not installed at this tune, it would be reviewed for exception when the plans came in for the first tenant improvement. The inspection report dated 3/20/02 marked #4 showing final approval for the building permit BUP2000 -00403 was subsequently revised to "fail" by the senior inspector Rick Bolen because there was still the outstanding issue of the path to the public way. Somewhere along this line, there was no official conditional certificate of occupancy issued. Dr. Gerig occupied the premises in the last week of March 2002. • The nerrnit TAT TTaV111 fEZ C - c_ .. __ + !I', ,-, -- -._ -