Loading...
Report 03/31/2005 17:44 5035999705 GEOPACIFIC ENG INC PAGE 01 7 a — C f (` 1 5�f5 Su/ • ' ®P .:� Ea9riirerinn,lnr z �' Real-World Geotechnicat Solutions investigation • Design • Construction Support • March 31, 2005 Project No. 03 - 8183 Attention; Andy Venture Properties, Inc. 4230 Gaiewood Street, Suite 100 Lake Oswego, Oregon 07035 Fax No. 503-670-9099 RE: SOIL ENGINEER'S REVIEW OF FOUNDATION EXCAVATION SUBGRADE LOT 14 SUMMIT RIDGE TIGARD, OREGON References: 1. GeoPacific Engineering Inc„ Geotechnical Investigation, Summit Ridge Development, Tigard, Oregon, dated May 12, 2003. 2. GnvPacific engineering ina soil and Wall Engineers Summary at Conclusion of Earthwork, Summit Ridge Development - Phase 1, Tigard, Oregon, Revised January 21, 2004 (should state 2005). GeoPacific Engiiieur, Jim imbrie, visited the site today to review the toundation excavation subgrade on the above - referenced lot. The observed subgrade is basalt rock_ Based on our observations, it is our opinion that the current foundation subgrade is adequate for spread foundation support to a maximum allowable bearing pressure of 3,000 psf. Our work scope pertains to a geotechnical engineer's foundation excavation rovicw only and the conditions existing and exposed at the time of our site visit. No deck footing; patio, or other appurtenant structure subgrades were observed. Our work was performed to the current local standards of practice. No other warranty is herein expresJ Or implied. If you have any questions, please call. Sincerely, GeoPecific Engineering, inc. 5,C0 PROs 14 7 �3 '� �/ James D. Imbrie, P.E., C.E.G. OREGON Cleated hnicai Engineer 414 . v� '�'s a�. 1 1 4 ,0, C�‘.sA -0.s