Loading...
Report Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson 'Testing Inc • Phone (503) 684 -3460 Phone (503) 589-1252 Phone (541) 330-9155 FAX (503) 684 -0954 FAX (503) 589 1309 FAX (541) 330 -9163 August 15, 2006 T0602523.CTI Permit No. BUP2006 -00292 P.O. No. 5946 FIELD INSPECTION REPORT DATES COVERED: August 3, 2006 PROJECT: Ash Creek Condominiums — Unit 150 Remodel ADDRESS: 11150 SW Greenburg Road — Tigard, OR INSPECTOR: A. Lewis, COP #788, AWS #04100651 08- 03 -06: As requested, CTI representative was on site for special inspection of epoxy anchor installation as given below. Reference detail `B' on Tigard approved drawings "wall section ", at new foundation (at car damaged area). Witnessed proper installation of (7) #4 rebar vertically into 6" deep holes and evenly spaced #4 bars horizontally (extra) into stem wall, using Simpson SET PAC, lot # 093136JJ with expiration date of October 2007. Holes were cleaned prior to installation. Installation conforms with ICC ESR -1772 and approved plans. *** CHECK ONE BOX ONLY*" YES NO 1. This is a preliminary inspection only. — OR — ❑ 2. The work inspected conforms to acceptance criteria listed above. If "No," the portions of the work that are non - conforming items are clearly stated above and will be added to the NCL. Remaining portions of the work, which are not preliminary in nature, are to be considered as ® ❑ conforming. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully s •0• mitted, CARLSON STING, INC. Ne' '' Shannon Pre . = Manager e ja cc: Lorentz Bruun Co Inc — Jeff Webb City of Tigard Building Dept Nicoli Engineering Inc — Pete Ketchum