August 15, 2006
T0602523.CTI
Permit No. BUP2006 -00292
P.O. No. 5946
FIELD INSPECTION REPORT
DATES COVERED: August 3, 2006
PROJECT: Ash Creek Condominiums — Unit 150 Remodel
ADDRESS: 11150 SW Greenburg Road — Tigard, OR
INSPECTOR: A. Lewis, COP #788, AWS #04100651
08- 03 -06: As requested, CTI representative was on site for special inspection of epoxy anchor
installation as given below.
Reference detail `B' on Tigard approved drawings "wall section ", at new foundation (at car
damaged area). Witnessed proper installation of (7) #4 rebar vertically into 6" deep holes and
evenly spaced #4 bars horizontally (extra) into stem wall, using Simpson SET PAC, lot #
093136JJ with expiration date of October 2007.
Holes were cleaned prior to installation. Installation conforms with ICC ESR -1772 and approved
plans.
*** CHECK ONE BOX ONLY*" YES NO
1. This is a preliminary inspection only. — OR — ❑
2. The work inspected conforms to acceptance criteria listed above. If "No," the portions of the
work that are non - conforming items are clearly stated above and will be added to the NCL.
Remaining portions of the work, which are not preliminary in nature, are to be considered as ® ❑
conforming.
Our reports pertain to the material tested /inspected only. Information contained herein is not to
be reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this
office.
Respectfully s •0• mitted,
CARLSON STING, INC.
Ne' '' Shannon
Pre . = Manager
e ja
cc: Lorentz Bruun Co Inc — Jeff Webb
City of Tigard Building Dept
Nicoli Engineering Inc — Pete Ketchum