Loading...
Report 02/15/2005 17:04 5035988705 GEOFACIFIC ENG INC PAGE 01 /UlSia -ate / so 2 si 6- re.e ',.Lot* e ..Eg9inei:ynp Inc _ :i; Real -World Geotechnical Solutions Investigation • Design • Construction Support February 15, 2005 Project No. 03 -5183 Attention; Andy Venture Properties, Inc. 4230 Galewood Street, Suite 100 Lake t(swego. Oregon 87035 Fax No, 503- 670.9099 RE: 301L ENGINEER'S REVIEW OF FOUNDATION EXCAVATION SUBGRADE LOTS 37 AND 80 SUMMIT RIDGE TIGARD, OREGON References; 1, GeoPacific Engineering inc., Geotechnical Investigation, Summit Ridge Development, Tigard, Oregon, dated May 12, 2003. • 2. Geul'eidnc engineering ino., Soli and Wall Engineer's Summary at Conclusion of Earthwork, Summit Ridge Development - Phase 1, Tigard, Oregon. Revised January 21, 2004 (should state 2005), Ceorecific Engineer, Jim imbrle, visited the site today to review the foundation excavation subgrade. The observed native soils are stiff, native clayey silt and some very stiff fill on Lot 37. Some mucking may be required if the subgrade is left exposed to wet weather for a long duration, howovor the current subgrade is Based On our observations, it is our opinion that the current foundation subgrade is adequate for spread foundation support to a maximum allowable bearing pressure of 1,500 psf. Minimum reinforcement has been recornmanded in the above Rofcronce 2, The foundations are sufficiently setback from the slopes and rockery walls. Our work sccrpa pertains to a geotechnical engineer's foundation excavation review only and the conditions existing and exposed at the time of our site visit. No deck footing, patio, or other appurtenant structure subgrades were observed. Our work was performed to thw current local standards of practice. No other warranty is herein expressed or Implied. If you have any questions, please call. Sincerely, GeoPacific Engineering, Inc. aret ms`s te,eI Ne4-� �^�/0 te I 4 3 , � 1 t/ ,.,. OREGON James D. imbrie. P.l:., C. ,C;. 44 '• 23. 1c Geotechnical Engineer �� FS p, 11419°