Loading...
Report .CIS r 5 -ate /3 5� /5/8'0 <5 "I C 7 z- ,2 - 04 6 -;-(24 n.r! .fin; 1ue 5 4S.Jkld fnb GLLA - AL1F 1L Leta 1N.: PAUL Ul Orictia IR ltrf;erli Reel.World Geotechnlcal Solutions Investigation • Design • Construction Support July 26, 2005 Project Nb. 03 ..e183 • Attention: Andy Venture Properties, Inc. 4230 Gelewood Street, Suite 100 Leke Oswego, Orsourt 97033 Fax No. S03- 670.9099 RE. SOIL ENGINEER'S REVIEW OF FOUNDATION EXCAVATION SUB3RADE LOT 32 SUMMIT RIDGE TIGARD, OREGON Ralarenop@; 1.0eoPecific Enaneering InG, GeOtechnical invessgation, Summit Ridge Development, Tigarc, Oregon, dated May 12, 2003. 2. CsePaolflo Engineering Inc„ Soil ant V' /ail engineer's SUmmarr at Ccndusion of Earthwork, Summit Ridge Development Phase 1. Tigard, Oregon, Revised January 21, 2004 (should state 2005). tieolacific Engineer, Jim Irnbrle, visited the site today to review the foundation excavation subgrade. The subgrade sells consist of stiff, native clayey slit on the uphill aide of the excavation end very stiff engineered fill on the downslnhe Aide of the excavation; with the exception of the book footlnp lino. Up to 00 inches of fill removal at the back footing line was required to excavate through poorly compacted fill. Bated on our observations, It Is our opinion that the currant foundation, subgrade Is adequate for spread foundation support to a maximum allowable bearing pressure of 1,600 of. Mnirnurn reinforcement as been recommended to the above Reference 2. The excavation is sufficiently setback from the rear yard rockery wall such that it is not adversely, surcharging the wall. Our work scope pertains to a geotechnlcal engineer's foundation excavation review only and the conditions existing and exposed et the rime of our site visit. No deck footing, patio, or other appurtenant etruoturo subgrades were Observed. Our work was performed to the current local standards of practice. No other warranty is herein expressed or Implied, If you have eny questions, please cal:. Sincerely, GeOP*oific Engineering, Inc. � tri 09tNEi 1 igfr 1ei74a 'r / OREGON Jamas D. Imtwie, P.E -. C.E. . y 4'1N. t3 . Sg�a Geotechnicel Engineer 44fte a. ItASC ". r ."1° __ TO 3EGd S3WOH3113SSINOW NOG T9LZ069E05 E /9Z /L0