Loading...
Report /Ul5T / /i9 ?8' pi-..D.r JUN ® 2005 GeOP cifi "; 'Eogineering.Inc. - Real - World Geotechnical Solutions Investigation • Design • Construction Support June 2, 2005 Project No. 03 -8183 Attention; Andy Venture Properties, Inc. 4230 Galewood Street, Suite 100 Lake Oswego, Oregon 97035 Fax No. 503 - 670 -9099 RE: SOIL ENGINEER'S REVIEW OF FOUNDATION EXCAVATION SUBGRADE LOTS 41 AND 52 SUMMIT RIDGE TIGARD, QREGON References: 1. GeoPacific Engineering Inc., Geotechnical Investigation, Summit Ridge Development, Tigard, Oregon, dated May 12, 2003. 2. GeoPacific Engineering Inc., Soil and Wall Engineer's Summary at Conclusion of Earthwork, Summit Ridge Development — Phase 1, Tigard, Oregon, Revised January 21, 2004 (should state 2005). GeoPacific Engineer, Jim Imbrie, visited the site today to review the foundation excavation subgrade. The observed subgrade consisted of compact fill with some rock. The houses are sufficiently setback from a small rockery retaining walls such that they are not surcharging the walls. Based on our observations, it is our opinion that the current foundation subgrade is adequate for spread foundation support to a maximum allowable bearing pressure of 1,500 psf. Minimum reinforcement has been recommended in the above Reference 2. Our work scope pertains to a geotechnical engineer's foundation excavation review only and the conditions existing and exposed at the time of our site visit. No deck footing, patio, or other appurtenant structure subgrades were observed. Our work was performed to the current local standards of practice. No other warranty is herein expressed or implied. If you have any questions, please call. Sincerely, GeoPacific Engineering, Inc. 7 f 14 7 b ,t / Ast.)/P/IL, James D. Imbrie, P.E., C.E.G. ' .,, bz'. / Geotechnical En ineer 23, "0 � ��� g E� r, t�� %� c �6 so Sys