Loading...
Permit A CITY OF TIGARD DEVELOPMENT SERVICES PERMIT PERMIT ,11%010 r — FERMI # BUP 97-0504 0 04 r:_.. 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 DATE ISSUED: 11/18/97 PARCEL: 1S135AB -03400 SITE ADDRESS...: 10260 SW GREENBURG RD #300 SUBDIVISION • TOWN OF METZGER ZONING:C —P BLOCK LOT •014 JURISDICTION:TIG REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION — CLASS OF WORK.:ALT FIRST : 10782 sf N: S: E: W: TYPE OF USE...:COM SECOND...: 0 sf PROTECT OPENINGS? TYPE OF CONST.:2FR .... 0 sf N: S: E: W: OCCUPANCY GRP.:B TOTAL : 10782 sf ROOF CONST: FIRE RET ?: OCCUPANCY LOAD: 90 BASEMENT.: 0 sf AREA SEP. RATED: STOR.: 0 HT: 0 ft GARAGE...: 0 sf OCCU SEP. RATED: BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED FLOOR LOAD - 0 psf LEFT: 0 ft RGHT: 0 ft FIR SPKL:Y SMOK DET..: DWELLING UNITS: 0 FRNT: 0 ft REAR: 0 ft FIR ALRM: HNDICP ACC: BEDRMS: 0 BATHS: 0 IMP SURFACE: 0 PRO CORR: PARKING: 0 ' VALUE. $ : 12600 Remarks : Tenant modification - Amendment to BUP 97- 0375issued on 7/30/97 - Owner: ' FEES ROBERT BECKER type amount by date recpt 9660 SW EAGLE CT PRMT $ 98.50 GEO 11/18/97 97- 301057 BEAVERTON OR 97008 SPCT $ 4.93 GEO 11/18/97 97- 301057 PLCK $ 64.03, GEO 11/18/97 97- 301057 Phone #: 646 -1862 FIRE $ 39.40 bEO 11/18/97 97- 301057 Contractor: PIONEER CONSTRUCTION SERVICES PO BOX 68304 MILWAUKIE OR 97009 -7268 Phone #: 652 -1050 $ 206.86 TOTAL Reg #..: 001197 REQUIRED INSPECTIONS This permit is issued subject to the regulations contained in the Framing Insp Tigard Municipal Code, State of Ore. Specialty Codes and all other Insulation Ins p applicable laws. All work will be done in accordance with Gyp Board Insp approved plans. This permit will expire if work is not started S u s p C e i i n g Insp within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952- 001 -0010 through OAR 952- 00101987. You many obtain a copy of these rules or direct questions to OUNC by calling (503)246 -1987. / Perm zttee Signature + /14 s_:ed By: .41 +++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ + + + + + + + + + ++ Call 639 -4175 by 7:00 p.m. for an inspection needed the next business day +++++++++++++++++++++++++++++++++++++++++++++++ + ++ + + + + + + + + + + + + + + + + + + + + + + + ++ + ++ . - r � . f J' Page No. 1 CASE HISTORY FOR CASE NO.: BUP97 -0504 ROBERT BECKER 10260 SW GREENBURG RD Unit: 300 12/22/97 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By BUPC005 Application received / / / / 10/30/97 PEND RDP 10/30/97 RDP BUPC008 Permit created / / / / 10/30/97 RDP 10/30/97 RDP BUPC012 Plans routed to Plans Examiner / / / / 10/30/97 RDP 10/30/97 RDP BUPCO26 Approved Plans routed to DSTS / / / / 10/30/97 APPR RDP 10/30/97 RDP BUPC090 (F) Ready to issue / / / / 10/30/97 PASS JSD 10/30/97 JD BUPC100 (F) Issue permit / / / / 11/18/97 PASS GEO 11/18/97 DST BUPC740 Framing Insp / / / / 11/24/97 see inspections already completed on BUP PASS GS 11/24/97 J *H 97 -0375 INSPECITON NOTES 112497: 1. Brace wall between offices 315 & 316 to structure. 2. Approved subject to electrical cover. NOTE: Elmer, please call me regarding existing return air duct. BUPC760 Gyp Board Insp / / / / 11/26/97 PASS GS 12/04/97 J *H BUPC762 Susp Ceilng Insp / / / / 12/15/97 PASS GS 12/15/97 J *H BUPC802 Final Inspection / / / / 12/15/97 12/22/97 to Jill for C/O approval PASS GS 12/22/97 JT Mir Cdta— 61144 CrYl../' r CITY OF TIGARD BUILDING INSPECTION DIVISION 24 -Hour Inspection Line: 639 -4175 Business Phone: 639-4171 Date Requested: P . -/5- A.M. R • K `$ 77 -a 176- Location: . _ 0 ! _ �1 _/ /`L /K.l_dlir _ BUP: q 7-! l^5O Tenant ow S- --- 0 uite: 3(J Bldg: MEC: 9 - 2 !4 � it Contractor: Phone: 06 lA a PLM: Owner: Phone: ELC: ELR: SIT: BUILDING n't) PLUMBING ELECTRICAL SITE Site Post/Beam 'Post/Beam Post/Beam Cover /Service Sewer /Storm Footing Roof UndFl/Slab Rough -In Ceiling Water Line Slab Framing Top Out Gas Line Rough -In UG Sprinkler Foundation -ltr Sewer Hood/Duct Reconnect Vault Bsmt Damp 11 all Storm Furnace Temp Service MISC. Masonry - eiling Rain Drain 2 --rfri."' UG Slab Shear /Sheath ire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt pprove Approved proved, Approved Approved Appr /Sdwlk o roved Not Approved Not Ap roved Not Approved Not Approved FINAL FINAL FINAL 0 Call for reinspection O Reinspection fee of $ required before next inspection 0 Unable to inspect Inspector: ta il�-' q " Date: /z--45 Page of