Loading...
Correspondence FILE COPY July 14, 2003 Barbara Anderson Collins Woerman 777 108 Avenue NE Bellevue, WA 98004 RE: PEDESTRIAN WALKWAY Project Information Building Permit: BUP2003 -00297 Construction Type: II -FR Tenant Name: Lincoln Center Occupancy Type: B Address: 10260 SW Greenburg Road Occupant Load: NA Area: 838 Sq Ft Stories: 1 Sprinkled: NA Alarms: NA The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The submitted plans are approved subject to the following conditions. • The pedestrian walkway is not a required exit for either building. The roll down fire doors at each end of the walkway shall be actuated by a smoke detector as noted in Section 5 - 11.7 of TVFR99 -01. The plans for the location and type of detectors are considered a deferred submittal. American with Disabilities Act (ADA): It shall be the responsibility of the Architect, Engineer, Designer, Contractor, Owner and Lessee to research the applicability of the ADA requirements for the structure. The City of Tigard reviews the plans and inspects the structure only for compliance with Chapter 11 of the OSSC which may not include all of the requirements of the ADA. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, rt ter of Transmittal. The letter of transmittal assists the City of Tigard in tracking an. .1 ess • - documents. Respe- • • , Brian 4 . lock, Se ;-Plans Examiner • • C ._ %LLI NS ARCHITECTURE • PLANNING • INTERIOR DESIGN rn D 777 108TH AVENUE NORTHEAST • SUITE 400 BELLEVUE WASHINGTON • 98004 5118 Z T • 425 889 3333 F • 425 828 91 16 • COLLINSWOERMAN COM July 8, 2003 Mr. Brian Blalock Senior Plans Examiner City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Re: Lincoln Center Site Improvements — Phase II Dear Mr. Blalock: This letter is in response to your Plan Review Comments of June 20, 2003. 1. This detail has been revised. See attached drawing. WHAT f)(1AiP /1. 0 2. These details have been revised with detectable warnings. See attached - drawing. WNAT PPA_WING- a- Q K._ 3. We will provide a zone of detectable warnings at the vehicular turn - around. See attached drawing. (i.) M<1 O t•Jt&) 4. We note that the walkway is an accessible walkway. The grades are twenty feet apart. 5. Handrail extensions exceed the 12" minimum requirement at both the top and bottom risers. See revised elevations A4.6. OK 6. Our handrails are 36" high. D K 7. That note should be excluded — it referred to an elevation in Lincoln One, where the handrail was also used. See revised detail 9/A5.2. OA d s' TN Ex � 8. We have changed this detail to having a one -hour fire shutter on each end of 660— • the link. The ceiling structure enclosing the(hutte wi be one -hour assembly GA FC 1130. See attached drawings A4.5, A4.6 and A5.2. 9. The gypsum ceiling membrane has been deleted, by request of the client. The structure will remain exposed. It is all non - combustible construction. .0!) 10. Connections provided. See attached detail A5.2. 1 14/ AtZ. Pomse 11. Calculations provided. See attached supplemental calculation sheet from structural. 014UT RCv�st C O L L I N S W O E R M A N I S A W A S H I N G I O N C O R P O R A T I O N 12. See revised detail 5/S2.1. The detail now shows a 1" thick base plate and a 5/16" fillet weld from column to base plate. D ‘ 13. The calculations on sheet L15 are for the short wall /bulkhead. o v. Mr. Blalock, I trust the above clarifies your concerns regarding the project. Sincerely, Barbara Anderson, M. Arch. Project Manager, CollinsWoerman cc. Krista Bailey, Equity Office Vince Sheridan, Equity Office Don Erickson, C. Schiewe & Associates • e June 20, 2003 Barbara Anderson Collins Woerman 777 108 Avenue NE Bellevue, WA 98004 RE: PEDESTRIAN WALKWAY Project Information Building Permit: BUP2003 -00297 Construction Type: II -FR Tenant Name: Lincoln Center Occupancy Type: Address: 10260 SW Greenburg Road Occupant Load: NA Area: 838 Sq Ft Stories: 1 Sprinkled: NA Alarms: NA The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The following information is required prior to the issuance of a Building Permit. ACCESSIBILITY 1. Detail 11 /C8.0 indicates 42 inches to the bottom of the accessible parking sign. The State of Oregon, Department of Transportation standards requires 84 inches to the bottom of the sign. Revise the detail. 2. Details 3, 4 & 8/C8.0 indicate portions of curb ramps and flares being constructed with detectable warnings. Section 1103.2.3.1 requires the full width and depth including flares. Revise the details. 3. Section 1103.2.3.2 OSSC requires, accessible routes that adjoin vehicular ways and loading zones and there are no curbs, a 36 inch wide detectable warning boundary to be provided. See figure 14 in chapter 11 OSSC Provide a detail for the boundary and indicate on the new site plans the locations of such boundaries. 4. Looking at the grading plans it appears that the accessible walkways will meet the code required running slope of 1 in 20, see section 1103.2.4.3 OSSC. Details on sheet C8.0 only indicate cross slope. A note indicating running slope is not required, but could be beneficial. 5. Indicate the length of the handrail extensions at the top and bottom of the stairs on detail 1/A4.5. s r ` 4 6. Clarify the height of the handrails at the stairs. 7. Detail 9/A5.2 has a note that says to see 3/A5.2? FIRE- and LIFE- SAFETY 8. Provide a listed assembly for the 1 hour ceiling indicated on detail 3/A4.6. 9. Clarify the ceiling membrane that appears on detail 1/A4.7. 10. Clarify sheet metal framing connections that are not identified in the "S" pages. For example, 5/A5.2. STRUCTURAL 11. Provide calculations and clarify the connection of the WF columns to the base plate. 12. Calculations sheet L 11 indicates a 1" thick base plate; detail 5/S2.1 notes 3 /4 "? Revise the detail to be consistent with the calculations. 13. Calculation sheet L15 provides calculations for the load on the exterior wall and provides a solution. Provide an analysis of the lateral loads on exterior wall when supported by the short wall/bulkhead. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Brian Blalock, Senior Plans Examiner r _ /< � Q S C���ssr �j OF 7,7 ( CiOI4.1'J GT ALL /,f((11.-Dt& s iv/ - 14 RQC.' £- ACC 6,5 /jSLE got) i- 442 m�' 1 To veil,cLG GvAj -- /i7rr, z E r6crAPce wA A )65 P lz-p° z • ce.0 o r(� Gv/ DTI De rbt /A) c c. u D t NG Gam, C icD , ¢-Art" T N Ce5; /l046 gov- 644/,4 /ZUNm G _re_ oP5 / /A Z ` 7 2 4-00g./ o K- Nc?ssi A Nol Z w 164,u0 QA/ P L/4/4 -5 5Xi ENSfoNS TRW 1/2. •• .1 Go9 c.t.1 pcA, c9t i ,t (SweEr fr o it_ y Co .o'i& GONNEG?'ioN To /via p isfrL e?P ?745 2- .5 es. to 71 , 31 3 2 0 , 0 47 # 16----1 - - - / • /vO cotoNGc-roks GA " ovT o Y 7 C. Z APP 0110 70 . 66 - 50176 c / tw /7Erfor INu: L_1 it) G. pog Ibex- ee/c oa 0 - o p 3 /4 c/ . A / A 040 OF 5/2 % SLppoR ; /me, Cr Z./ A- Fo f wi evD 440 C C/}GG s ic&`tl L. /S Tf4�ef tAin T0, rooN047 /4N fly+ GGAZra 4 ` G R 0 U P FACKENZIE 0690 SW Bancroft Street /PO Box 69039 • Portland, OR 97201 TEL: 503.224.9560 • NET: GRPMACK.COM • FAX: 503.228.1285 Letter of Transmittal 4478 -1 Date: July 14, 2003 Project Number: 2020034.00 To: City of Tigard 13125 SW Hall Boulevard Tigard, OR 97223 -8199 • Attention: Brian Blalock Project Name: Lincoln Center Main Entry Modifications Enclosed: Quantity Medium Description Comment 2 Bond Full Permit Response For your use Remarks: Signed: Roger Boettcher /jdh Transmitted Employee Delivery (DGL) Via: If enclosures are not as noted, kindly notify us at once. RE 1UL 1 2003 G1SY NG D SIOr1 8U1LD1 ,JUL. 11.2003 9:2.4AM COLLINSWOERMAN NO. 9058 P. 1 • COLLINS LpcHITErTURE • PLANNING • INTERIOR REBIGG rn 777 106TH AVENUE NORTHEAST • SUITE 400 3> BELLEVUE WASHINGTON • 98004 -511a Z T- 4255695353 F- 4256269116 • COLLINSWOERMAN.COM TRANSMITTAL X FACSIMILE MEMO TO • Brian Blalock DATE • 07.11.03 AT • City of Tigard ADDRESS • 13125 SW Hall Blvd Tigard, OR 97223 PHONE • 503.639.41 71 FACSIMILE • 503.624.3681 FROM • Barbara Anderson REGARDING • Lincoln Center Link PROJECT • Lincoln Center PROJECT NUMBER • 01 1 1 4.04 NUMBER OF PAGES INCLUDING COVER • TWO Brian: Attached is a drawing we had showing current exiting of Lincoln One. The link is not an intregal part of exiting for either Lincoln One or Lincoln Tower, as in both instances, there are no exit doors in the location of the proposed link. Regards, COPIES SENT VIA • FACSIMILE COURIER _ POST ELECTRONIC This facsimile transmission contains Information Which may be confidential or privileged. The Information IN intended to be for the use of the Individual or entity named above. If you are not the Intended recipient please be aware that any disclosure, copying, distribution or use of the contents of this information is prohibited, If you have received this facsimile In error, please notify us by telephone. C O L L I N S W O E R M A N I S A WASHINGTON CORPORATION. PNCorreap\ Anderzon‘Poniand \07.11.O9cityFAX,dm ti ..l U L. 11, 2003 9 : 24AM COLL I NSWOERMAN .. .. _ , .. , NO. 9058 P. 2 • .. • C La (7 0 0 6 rim I , i 2. 1 'I ( 1 ii - !i li, 11 1 I I 1 6 56, 1 "I . .o...... ,, 1 I ■...7_—_,/li['..—A.,....__I ,1''‘._..,.__.,..—/ I P I ' .' i;_____/ „L_, _ ; f \_____,Ir , 1 - 1 _..... ,; . ‘ i 1 ti Jr.----+z• `'Ii 1 f17.7,..j 'I i ' -, 1 1 i , ..,.., .f. ,., * Iff - 1 i 1 il 4. 0' • 1 - ! ,- : - -",., I , i , ,, —«--- 1-..... 1 1..,,,_ i iii - l .i. j l t fir __ 1 TO/ IA r f= ,,,P.,7 c 1 , .1 , , , SEPI , L.,. I , : ::=-,-...fE7-3 ,1,..- ..= '.'-1.- 1 \c,1 1 3 1 G ne r OLIO ............,„ t.--... " L 1-7-.- ) ' s -. ' . ■ 1 i ;; 1 ./ -- T , TA 4C2e 7--7'''''! ' j vi n , - ;! I I: 1 - q ), k n I - • - — • II . I ! '1 - SPE( ure.1,54 5 . I LOnif EXIT I I I I I L , , _......_ , • II 1,. rl S. , 1 I \ I I-I I S ■; 1 ,_ ,„ ...,.. ,.-_ ,, -_-_-,E ___ r 1- ---Efr i d r4 il _ ,1 I , i h 1 ---- ----- — 71 • III ,i . , 11 ['\.,,..,,.1',." 1„ L ,; x , 1 , , ,,_,.,, . .,,,.._71 • r_____, , ....,_, ,/,.,..,, _ .,.:___,.d .,,„, __ . I , '1 ! 1 \„! ... IL, _ ......_4•.,.., ;: I h 'I IMF I i I .? „ .....:1....,„............ j ., ... ,..,.., I R ..t_ . . 7 _3 . .. . ' D -- T , ...1.5.5 01-1 I qr 2 I .. 1111 — ' l ■ 4 1 Ill I. 1 n. d, 1 I 'II i 7,11 I ‘I I ,.,,,,.,,, ,,.,...11 , .,,..„,..1 a, L i . t5 r -2 5 { ,I , r -----. 1 r — -- " -- ■„1 .. 1 -- ■ I I . e . 1 1..., !' 1 1 I „ 1 1 I 1 0 I ,, 1 1. LGOI. _c_ _,.__ _ . _ _ .-..; _ „--- _ ,. _ _ — „ _ V I 1 ,_ • . 0 FIRST FLOOR EXITING PLAN 41k, ■ elk, Wot i 11 *V gd, ...1 KEY NOTES • '. .... rnni • !,. • OFFICE COPY asllgt July 14, 2003 Alai' CITY OF TIGARD Barbara Anderson Collins Woerman QREQ ®N 777 108 Avenue NE Bellevue, WA 98004 RE: PEDESTRIAN WALKWAY Project Information Building Permit: BUP2003 -00297 Construction Type: II -FR Tenant Name: Lincoln Center Occupancy Type: B Address: 10260 SW Greenburg Road Occupant Load: NA Area: 838 Sq Ft Stories: 1 Sprinkled: NA Alarms: NA The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The submitted plans are approved subject to the following conditions. • The pedestrian walkway is not a required exit for either building. The roll down fire doors at each end of the walkway shall be actuated by a smoke detector as noted in Section 5 - 11.7 of TVFR99 -01. The plans for the location and type of detectors are considered a deferred submittal. American with Disabilities Act (ADA): It shall be the responsibility of the Architect, Engineer, Designer, Contractor, Owner and Lessee to research the applicability of the ADA requirements for the structure. The City of Tigard reviews the plans and inspects the structure only for compliance with Chapter 11 of the OSSC which may not include all of the requirements of the ADA. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Brian Blalock, Senior Plans Examiner 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772