Permit CITY OF TIGARD 24 -Hour
BUILDING Inspection Line: (503) 639 -4175
•
INSPECTION DIVISION Business Line: (503) 639 -4171 MST
:
BUP v
Received Date Requested 7 / 3 U PM BUP / iki
Location - 9 U Li, Suite Q MEC — O0 /may
Contact Person Ph ( ) PLM //
Contractor Ph ( ) SWR
BUILDING Tenant/Owner ELC
Footing
Foundation ELC
Ft Drain Access: l Z L ° f-, '•/ r3/ Crawl Drain C / / / d . ELR •
Slab Inspection Notes: SIT
Post & Beam
Shear Anchors / T L Z Q /
Ext Sheath/Shear
Int Sheath/Shear
Framing
Insulation
Drywall Nailing
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof
Other:
•
Final
PASS PART FAIL
PLUMBING (/.
Post & Beam
Under Slab
Rough -In
Water Service
Sanitary Sewer
Rain Drains
Catch Basin / Manhole
Storm Drain
Shower Pan
Other:
Final
PA FAIL
M CHANI
Pos•&Beam k 4 S r
Rough -In — w •
Gas Line
Smoke Dampers
° anal )
_d374 PART FAIL
• ELECTRICAL .
Service
Rough -In
UG /Slab
Low Voltage
Fire Alarm
Final Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
PASS PART FAIL
SITE Please call for reinspection RE: El Unable to inspect — no access
Fire Supply Line
ADA Date p 3 /30/0 �/ Ins e ctor Ext
Approach /Sidewalk `
Other:
Final DO NOT REMOVE this inspection record from the job site.
PASS PART FAIL