Loading...
Correspondence /LM?cro c z4,25 /x 35 3 InSpec Design 140 SW Arthur # 301 De l gel Portland, OR 97201 USA TEL 503,595.6540 www.inspecinti.com FAX 503.595.6548 May 8, 2008 Subject: Grant St. Elite Care Rainwater /HVAC system To whom it may concern, The Rainwater recovery and HVAC systems was inspected during the progress of construction at 12353 SW Grant St. Below is a summary of inspection that took place. Date: 10/14/07 Description of work / progress inspected: Reviewed underground installation before it was covered ® Rainwater clarifier tank installed and plumbed to the rainwater storage tanks. ® Overflow to cistern piping and initial rain event waste piping ® Piping from Rainwater storage tanks into mechanical room ® HVAC ground loops installed and terminated to manifolds Comments, issues: I saw no issues. Date: 1/18/08 Description of work / progress inspected: Progress Inspections ® mechanical room components ( water filtration, HVAC surge tanks, water heaters, heat pumps) installation ® interconnect plumbing for water service, rainwater harvest, and HVAC in mechanical room Comments, issues 1. Rainwater line had double check valve where in connects to potable water. The double check needs to removed replaced with reduced pressure backflow protector. Replace with Watts type 009 2. Concerned rainwater line to toilets may be too small. Bill Pasco May 8, 2008 Page 2 Date: 4/28/08 Description of work / progress inspected: Completion of system. • Final system completion • Tested toilet pipe sizing by flushing all toilets in whole wing at one time. Pressure was maintained. Pipe size adequate. • Verify that proper RP device was installed Comments, issues 1. Told them to chlorinate the potable water system before use Date: 5/08/06 Description of work / progress inspected: Test of system • Verify no cross connect test between rainwater harvesting system and city water. Comments, issues 1. No issues system is ready to go. Good installation. Sincerely Tamela.J. Toyoda, P.E.