Correspondence ti TIGARD FIRST BAPTIST THE GRACE PLACE EL g-Ce CO& 73 February 8, 2006 Hap Watkins Inspections Supervisor City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 RE: Tigard First Baptist Church Project Dear Hap, As requested in your last e-mail I have attached the technical info on the switch we intend to install on the tank I think this will supply everything that you require but I did not copy the entire book on the device. Should there be more information required just let me know and I will do my best to supply it to you I believe that this switch is more than capable of doing what needs to be done since it is truly an industrial grade switch designed for much harsher conditions than we will subject it to Our plan is to have it activate a strobe type light that will be visible not only at the entrance to the subject building but also very visible from the entry to our main church office. I will let you know when we have it installed and send reports as you have requested. Thank You Jim Wilson Project Manager Tigard First Baptist Church 11075 W Gaat de St I igard OR 97224-3720 • (503) 639-3913 • tax (503) 684-1955 • graceplac c@tigardfirstbaptist com r Technical Liquid Level Switch Information TI 328F/24/ae liquiphant M FTL 50, 51 50 H 51H Level limit switch for all liquids Suitable for use in hazardous areas, chemicals, food and pharmaceuticals . � J \/ gam = �`?, � <� " „p, <, Imo 0•,-4, tk : - : -'i , Iii.wc ...., - ,„ c,,,,,,,,„ H ,„„ "'a' 3 J' R aT i �” ,rte a.2.V 4: tftz _ms' i ' sE:s t; ' s. 1' '' ''ql,0 ' 4 4ti , 'Wier R'� 7& ��a:� � .�ttR" ��� �� � A , #i #i= 1.^`0.`` - =L;=+ '�� �N,. .. ii 11 Liquiphant M FTL 50 H with SS Housing and Tri- clamp® i Pi Liquiphant M FTL 50 Applications ' with with Polyester The Liquiphant M is a level limit switch Housing for use in all liquids -= and 3/4" NPT Threaded • With temperatures between -40° and • Connection + 300 °F ( -40° to + 150 °C) =a 4 • Pressures up to 930 psig (64 bar) tti r; • Viscosity up to 10,000 cP ` r • Density from 0.5 SGU EI;d1 The function is not affected by flow, AIM turbulence, bubbles, foam, vibration, ; bulk solids content or build -up. The MIN w ; Liquiphant M is thus the ideal replace- ment for float switches, gap switches, 0 capacitance and other technologies. ' Features and Benefits 3 Versatile Selection N; • selection of process connections: universal use 'FTL 50: compact design, ideal for :�i r a k :; • Installs in threaded openings as mounting in pipes • FTL 51: extension tube for up to small as 3/4" or in flanges as small :::: as 1" 115 inches maximum (3 m) • Wide variety of electronics, e.g. • FTL 50 H, FTL 51 H: with polished fork and easy to clean process r • DPDT relay,4to20mAswitch, y p �*� NAMUR, PFM signal output, connections and housings for food transistor: the right connection for and pharmaceutical applications every process control system ? High corrosion- resistant Alloy C4 is 4 • No calibration: quick, low -cost available for the fork and process start-up connections for applications in very • Liquiphant M FTL 51 No mechanical moving p arts: no aggressive liquids. with Aluminum maintenance, no wear, economical Housing long operating life The Liquiphant M includes versions for and Extension Tube, • Monitoring of fork for damage: use in hazardous areas, including ANSI Flange Mounted guaranteed operation intrinsically safe and explosion- proof. (Explosion Proof) 0 G Endress +Hauser __ [000 The Power of Know How � �i' FTL 50/51 50H/51H Function and system design Function The introduction of the Liquiphant M, a new generation frequency shift tuning fork, brings greater application flexibility and reliability to level switch users. Level swtiches are used in almost every processing and manufacturing facility around the world. Various mechanical devices (such as floats and displacers) are used in such applications as spillage prevention, dry pump indication, and batch level measure- ment. These types of level switches require high maintenance and process shut- downs due to sticky, viscous fluids, gas bubbles or turbulence. The Liquiphant M is not affected by turbulence, bubbles, foam, vibration, build -up, high viscosity, or bulk solids build -up. The Liquiphant M uses frequency shift technology for limit detection. The forks vibrate at their resonant frequency. This frequency changes when covered or uncovered by the liquid material, causing a change in the frequency which activates a limit switch. The Liquiphant M provides continuous self- monitoring. The frequency shift of the tuning fork is monitored, an alarm state is indicated if there is fork corrosion or damage. Loss of power and piezo drive failure are also alarmed. =H il;�• ic,. T — .1n'1I 1 •d, _a •,w Application The Liquiphant M can be mounted at any orientation and in pipe lines. In applica- tions where room allows, the unit can be extended into the vessel (up to 115 ") with an extension tube. Minimum or maximum limit detection in pipes or tanks containing all types of liquids is possible with the Liquiphant M, including hazardous areas, food and pharmaceuti- cals. The increasing requirements for overfill or spill detection of chemicals, wastes, and many commodity fluids are ideal applications for the Liquiphant M. The high reliabil- ity and low maintenance provides safety for owners of storage tanks, chemical tanks, and petroleum product storage; on land, tank cars and barges. 1 Internal support for extended versions �CTuTw recommended. .J1 �i F 1 ■ �l� 1 I JA • F�YIY Rail car overspill protection 2 Endress +Hauser V FTL 50/51 50H/51H System - A complete system consists of an electronic insert, housing, process connection and sensor. 1 I FEL 51, 52, 54 FEL 55, 56, 57, 58 ( I t 2 )r f - I.S. I 1 1 1 1 l!I Switching • 1 unit PLC I Isolation 1 ,:. II i' . .1 ��i.'g `':.� E EX I . ) 7I 1 a + I Hazardous Area, Sate Area i i Level Limit Switch Output Level Signal Output 3, Liquiphant M FTL Liquiphant M FTL with electronic inserts with electronic inserts I FEL 51, FEL 52, FEL 54 FEL 55, FEL 56, FEL 57, 58 t for connecting to a 111 separate switching unit yy or isolation amplifier 1± l Modular Design Depending on the application, the Liquiphant M is available in various electronic 1 i and mechanical versions to fulfill industrial requirements. !I • 1 ---- - JO ll FEL 51: Two -wire AC connection o FEL 52: Three -wire DC connection, PNP Plug - in electronic �I inserts to mount in FEL 54: Universal power (AC / DC), DPDT relay FEL 55: Output 8 / 16 mA for remote switching unit the housing FEL 56: Output 0.35 to 1.0 / 2.1 to 6.5 mA for remote switching unit (NAMUR) FEL 57: Output 50 / 150 Hz, PFM, for remote switching r _ unit (Nivotester) 7 FEL 58: Output 2.1 to 3.5 / 0.6 to 1.0 mA for remote switching ! unit (NAMUR) 1_ Iv'-r'- -111 l - 1- 41111 Housings / re 14.■ ' • I 9 �� ®,� ,� ll;�' �,„ ■ i l u Polyester 304 SS Sanitary Aluminum (also for hazardous) Spacers L 1 Temperature L I 2nd line of defense, - spacers - - pressure-tight bushing nioe 11 =11 I r Process ' r Connections u l �J 36' or 1' NPT 1' Flush mount 1 -1/2' / 2' ANSI B16.5 RF flanges ANSI B 1.20.1 for weld adapter Tri -clamp from 1' (EE2) or 2' Varivent j Compact, 1.5' Extended tube, 4 Sensors (240 grit polished maximum 115' available) (240 grit polished i I I available) !; if I ; NOTE: for coated sensors in aggressive ■ ; chemical applications, refer to Liquiphant M FTL 51 C, document TI 347F/24/ae. Endress +Hauser 3 Accessories Welded Adapter °.1> HS) r For flush - mounting a Liquiphant M FTL 50 H with process connection code T— il EE2. Sensor can be positioned. A092 ' 'o 2 Material: 316L SS (' • ",Z Silicone seal is on Liquiphant Weight: 0.3 lb (0.15 kg) I Order number- 52001047 --J -•i:r I-- I Transparent Cover �— For polyester housing .— Material: PA 12 (clear polyester) i '411 Order number: lb (0.04 kg) Orer n der numbebe r. 94343461 0001 Cover with Viewing Window Sliding Sleeves For high pressure (maximum 580 psi; - For stainless steel housing For unpressurized operation (0 psi; maximum temperature, 300 °F) Cover Material: 304 SS maximum temperature, 300 °F) Material: 316E SS or alloy C4 Window Material: Glass Material: 316L SS 1 " NPT, 316E SS, order number: 52003667 1 "NPT, alloy C4, order number: 52003668 Weight: 0.3 lb (0.16 kg) 1" NPT, order number: 52003979 Order number: 943301 -1000 1 -1/2" NPT, order number: 52003981 1-1/2" NPT, 316E SS, order number: 52003669 Cover with polycarbonate window 1-1/2" NPT, alloy C4, order number: 52003670 Order number. 52001403 7r , NPT 61 11E' 1' NPT ( )'TOTI 31 • II (19) >01 lee■ At - =I 7 \O� OHO V t. mu U -.- °21) � i � • { , ® j` 0>1 (14 Q O tr , =:*,', 1-1/2' NPT 0.>5• r-. • NOTE: FM approvals no longer apply I - =i n s) 1 -1/2' NPT E i " "' when us ing accessory covers. .,__ - ,�;i I €p ,. „, —©_) I . �� L _._____. —IT oes In ) I 0.98 ' 1 j (25) Sliding sleeve, no pressure Sliding sleeve, high pressure For application and selection assistance, in the U.S. call 888 - ENDRESS { For total support of your installed base, 24 hours a day, in the U.S. call 800 - 642 -8737 Visit us on our web site, www.us.endress.com - United States Canada Mexico Endress +Hauser, Inc. Endress+Hauser Endress +Hauser . 2350 Endress Place Canada Ltd. Paseo del Pedregal No 610 Greenwood, IN 46143 1440 Graham's Lane Col. Jardines del Pedregal Phone: (317) 535 -7138 Unit 1, Burlington 01900, Mexico D.F. i 888 - ENDRESS ' ON, L7S 1W3 Mexico FAX: (317) 535 -8498 .Phone: (905) 681 -9292 Phone: (525) 568 -2405 800 -668 -3199 FAX: (525) 568 -7459 FAX: (905) 681 -9444 Endress +Hauser (�J The Power of Know How � / / TI 328F/24/ae/03.02 CO 2002 Endress +Hauser, Inc. Page 1 of 2 Hap Watkins - Re: Tigard First Baptist Church FILE OP! From: Hap Watkins To: Jim Wilson 1l 1 541° Subject: Re: Tigard First Baptist Church I have spoken with the Building Official regarding this use, and, though the time period is beyond our normal "temporary use" application, we have agreed that you may use the holding tank for the original septic system with the following conditons: 1. The outlets to the leach lines will be closed and sealed in a permanent manner, 2. The holding tank will have a "pump now" alarm that is monitored at a normally occupied location (reception or main business office), and 3. Reports will be submitted to the Building Department every six months, which note the occurrence of alarms and the invoices for the pumping of the tank at each alarm. 4. The holding (septic) tank will be de- commissioned and inspected when the building is demolished under permit. Please contact me with the technical data for the alarm you intend to install on the tank before actually doing the work. There are some details that need to be covered, such as the alarm repeating until manually turned off (in case it goes off after hours), etc. Thank you for your request and patience. FILE COPY • »> "Jim Wilson" <Jim @tigardfirstbaptist.com> 01/18 3:44 PM »> Hap, We last communicated around the end of November about our request to cap off the septic tank and pump it on a regular basis for a building on our property that will be demolished in phase 3 of our expansion project. A few weeks back we did get word from Matt at the city who was our Associate Planner in charge of our project that you had mentioned to him that you were going to approve our request with certain conditions which would include an alarm system as well as some reporting to the city. I had agreed to both of these conditions in my last e -mail to you and have just been waiting for your letter and the details of the conditions. I am not trying to rush you because I know you have a full plate but I have been experiencing some e-mail problems and thought just in case something happened and you had sent me another communication that didn't get through I would touch base. Looking forward to hearing from you and thanking you in advance for your willingness to work with us on this special request. Best Regards Jim Jim Wilson Project Manager Expanding Our Territories Tigard First Baptist about:blank 1/23/2006 eLC g_0647 — 006 73 ig175- ECE VED Hap DEC 1 9 2005 FILE o P Y CITY OF TIGARD Sorry for the delay on getting back to you, but as you might imagine I am n�i f��' -t� i3''� f VISION $f the church. One of your two questions is easy to answer and the other is not quite as straight forward. We have already spoken to a supplier and have an alarm system available to us. We had already planned to put something like this in place as part of the temporary solution. It is difficult for us to determine exactly how many months it will be before we demolish the structure. If we had all the funds in hand to complete all three phases of the expansion project our hope would be that we could be taking down the structure by the end of this coming summer. That would be the perfect situation but of course life or our plans are rarely perfect. When the Lord provides the funding for all three phases we would have to be realistic and say that the shortest number of months would probably be something like twenty four and a more realistic time frame may be thirty six months. As I mentioned earlier this building is used on a limited basis only. The schedule is as follows: Sunday there are 60 -70 people in the building for one hour. Wednesday evening there are 20 -30 people in the building for two hours. Thursday evening there are 20 -30 people in the building for two hours. In an additional effort to insure that the situation is not exposing anyone to any sort of a health risk we would be willing to send your reports every six months as to the number of times the alarm has gone off and proof (invoices) that we have in fact pumped the tank as needed. Obviously we intend to be very attentive to the situation since we and our congregation are the ones that would be dealing with any issues that could arise from not properly monitoring the tank. I pumped the tank on October 20 of this year and would be glad to pull the access lid and measure the level that has accumulated in the past two months if that would be helpful information. We really appreciate your willingness to consider our request. We recognize that it is somewhat irregular but it also will save us a substantial sum of money (minimum of $10,000) that would be spent on a building that will be removed in phase three of our project. Sincerely I �� Jim Wilson FILE COPY �r- Project Manager Tigard First Baptist Church. `611,! _ ), `� eu ersr► Hap Watkins - Re: FW: Question on plumbing Page 1 From: Hap Watkins To: Jim Wilson Date: 11/30/2005 4:07:55 PM Subject: Re: FW: Question on plumbing Question 1: How long in months until you demolish the structure? Question 2: Do you have a plan or routine, perhaps an alarm, to know when the tank needs pumping? Let me know the answers to these questions and I can better address your request. It is somewhat irregular, but temporary use of this nature could be acceptable. »> "Jim Wilson" <jim ©tigardfirstbaptist.com> 11/30 3:28 PM »> Hap, WE have never met but I work with Steve Adams at A.J. Weber Construction and he and I do a fair amount of work in both Tigard & Tualatin. I also wear the hat of Project Manager for Tigard First Baptist Church but I won't waste a lot of words on that because the attached e-mail from me to your Mike Sheehan will explain our project and where we are at as well as our question /situation. I was certainly glad to hear Mikes answer to our question /request but I wanted to at least get an affirming nod of approval from you before we proceeded with our plan regarding the septic field & tank that our present youth center is on. I in no way want Mike to think that I am doubting his decision especially since it basically gives us the answer we were after, but I also didn't want to proceed and get off in a wrong direction. Our request to use the tank as a storage tank and pump it on a regular basis as needed would save us possibly $10,000.00 or more which would be spent on a building that will be demolished in phase three of our project. If you could simply read my e -mail to Mike as well as his answer and give us a confirming nod it would be greatly appreciated. Should you have questions or like to discuss it further I could meet you at the site or come to City Hall to accomplish that. An e -mail reply will also suffice. Thanks in advance for your help on this matter. Sincerely Jim Wilson Project Manager Expanding Our Territories Tigard First Baptist 503 - 639 -3913 Original Message From: Mike Sheehan Jmailto:MIKES(c�tigard- or.govj Sent: Thursday, November 17, 2005 8:57 AM To: Jimtigardfirstbaptist.com Subject: Re: Question on plumbing I Hap Watkins - Re: FW: Question on plumbing Page 2 I don't see any problems with your use of the septic tank »> "Jim Wilson" <Jim c(Dtigardfirstbaptist.com> 11/15 4:22 PM »> Mike, We have met at least once because in addition to my role here at Tigard First Baptist Church as Expansion Project Manager I also work for AJ Weber Construction. AJ Weber does a lot of TI work for PacTrust here in Tigard & Tualatin and I have been on sight when you came for our plumbing inspections. I have a question that maybe you can help me with. We have received our conditional use permit from the city and are working on putting together our package for site development. Phase #1 of our project is building a parking lot on our property part of which will go in an area where we presently have a septic drain field. We will of course at some point decommission or do away with the field & tank but this would be in what we refer to as Phase #3 where the building (youth center) will be demolished to capture the remainder of the desired parking. What we would like to do because it would save us a great deal of money in the big picture is to cap off the existing septic tank and do away with the drain field. We would then schedule to pump the tank at regular intervals as needed in order to keep the two restrooms in that building in working order. The building is only used on Sundays & one night a week so the facilities are used on a very limited basis. I recently had the tank pumped and in digging to expose the lid found the tank (concrete) in excellent Hap Watkins - Re: FW: Question on plumbing_ Page 3 shape. The need to use the tank as basically a holding tank & pump it when needed would not be a permanent situation. It would only until we were ready to start phase #3 and demo the old youth center. Please consider this request and let me know your thoughts on giving us permission to take such an approach. If you would like to see the site would be more than happy to meet you there and show you the tank & field location. Thanks for your time & your consideration of this request. Respectfully Jim Wilson Project Manager Expanding Our Territories Tigard First Baptist 503 - 639 -3913 £ L-C cl 73 Page 1 of 3 / / Hap Watkins - RE: Tigard First Baptist Church // a 7 7 51A) From: "Jim Wilson" <jim @tigardfirstbaptist.com> To: "'Hap Watkins ' <HAP @tigard- or.gov> Date: 1/24/2006 12:53 PM FILE copy Subject: RE: Tigard First Baptist Church Hap, Thanks again for your logic and common sense approach. I will plan on using a strobe type signal light as you suggest and will keep in touch with you as we put this thing together. Regards Jim Jim Wilson Project Manager Expanding Our Territories Tigard First Baptist 503 -639 -3913 Original Message 7� , From: Hap Watkins [mailto:HAP @ tigard - or.gov] 4 Sent: Tuesday, January 24, 2006 11:13 AM To: jim @tigardfirstbaptist.com Subject: RE: Tigard First Baptist Church If you have a barrier that doesn't allow underground routing of the signal wires, such as a parking lot, street, concrete slabs or sidewalks, it wouldn't be feasible to have the alarm in the main office, of course. I would propose that the signal light you use on a remote building (facing the normally occupied office) be a strobe type. The light flashes from strobes are much more intense and noticeable. Any (fire) alarm company can supply one of those. Your float switch will not be required to be redundant (single switch, no back up). Thanx for keeping in touch hap »> "Jim Wilson" <jim @tigardfirstbaptist.com> 01/24 10:06 AM »> Hap, Thanks so much for working with us on this issue. We recognize that it is a bit out of the ordinary and cannot express how grateful we are to have folks at the city look for or be willing to look for ways to be helpful on a project like this. I have read and understand the conditions and believe that they are reasonable and we intend to comply. Having said that I have just one question regarding the ❑Pump Now Alarm condition. The subject building and tank is a ways away from our main church office with no easy way to rout an overhead or underground cable. The building is however very visible from the main office entry and main office parking area. Would it be acceptable to mount a blinking or flashing light on the subject building where it could be observed from the office & office parking area? We would then simply inform all of our staff to always take notice as they come & go from the property & office area as to the signal light being on or off. I believe that this will ensure that the signal to pump would never be missed and will accomplish the same thing without the need for overhead or underground cables. file: / /C:\.Documents and Settings\hap\Loca1 Settings \Temp \GW }00002.HTM 1/24/2006 Page 2 of 3 I am in the process of searching out the best type of float switch alarm but as you have requested will run it by you for approval prior to purchase. Thanks in advance for considering this modification to the conditions. Jim Jim Wilson Project Manager Expanding Our Territories Tigard First Baptist 503- 639 -3913 Original Message From: Hap Watkins [mailto:HAP @tigard - or.gov] Sent: Monday, January 23, 2006 1:29 PM To: Jim @tigardfirstbaptist.com Cc: Gary Lampella Subject: Re: Tigard First Baptist Church I have spoken with the Building Official regarding this use, and, though the time period is beyond our normal "temporary use" application, we have agreed that you may use the holding tank for the original septic system with the following conditons: 1. The outlets to the leach lines will be closed and sealed in a permanent manner, 2. The holding tank will have a "pump now" alarm that is monitored at a normally occupied location (reception or main business office), and 3. Reports will be submitted to the Building Department every six months, which note the occurrence of alarms and the invoices for the pumping of the tank at each alarm. 4. The holding (septic) tank will be de- commissioned and inspected when the building is demolished under permit. Please contact me with the technical data for the alarm you intend to install on the tank before actually doing the work. There are some details that need to be covered, such as the alarm repeating until manually turned off (in case it goes off after hours), getting correct permit, etc. Thank you for your request and patience hap »> "Jim Wilson" <Jim @tigardfirstbaptist.com> 01/18 3:44 PM »> Hap, We last communicated around the end of November about our request to cap off the septic tank and pump it on a regular basis for a building on our property that will be demolished in phase 3 of our expansion project. A few weeks back we did get word from Matt at the city who was our Associate Planner in charge of our project that you had mentioned to him that you were going to approve our request with certain conditions which would include an alarm system as well as some reporting to the city. I had agreed to both of these conditions in my last e-mail to you and have just been waiting for your letter and the details of the conditions. I am not trying to rush you because I know you have a full plate but I have been experiencing some e- file:1 /C:\Documents and Settings\hap \Local Settings \Temp \GW }00002.HTM 1/24/2006 Page 3 of 3 mail problems and thought just in case something happened and you had sent me another communication that didn ❑t get through I would touch base. Looking forward to hearing from you and thanking you in advance for your willingness to work with us on this special request. Best Regards Jim Jim Wilson Project Manager Expanding Our Territories Tigard First Baptist 503- 639 -3913 file: / /C:\Documents and Settings\hap \Local Settings \Temp \GW }00002.HTM 1/24/2006 Page 1 of 2 1( C �� �L�p20�JCo_U 73 Hap Watkins - RE: Tigard First Baptist Church From: Hap Watkins FILE To: Jim Wilson COP Date: 1/24/2006 11:13 AM Subject: RE: Tigard First Baptist Church If you have a barrier that doesn't allow underground routing of the signal wires, such as a parking lot, street, concrete slabs or sidewalks, it wouldn't be feasible to have the alarm in the main office, of course. I would propose that the signal light you use on a remote building (facing the normally occupied office) be a strobe type. The light flashes from strobes are much more intense and noticeable. Any (fire) alarm company can supply one of those. Your float switch will not be required to be redundant (single switch, no back up). Thanx for keeping in touch hap »> "Jim Wilson" <jim @tigardfirstbaptist.com> 01/24 10:06 AM »> Hap, Thanks so much for working with us on this issue. We recognize that it is a bit out of the ordinary and cannot express how grateful we are to have folks at the city look for or be willing to look for ways to be helpful on a project like this. I have read and understand the conditions and believe that they are reasonable and we intend to comply. Having said that I have just one question regarding the "Pump Now Alarm" condition. The subject building and tank is a ways away from our main church office with no easy way to rout an overhead or underground cable. The building is however very visible from the main office entry and main office parking area. Would it be acceptable to mount a blinking or flashing light on the subject building where it could be observed from the office & office parking area? We would then simply inform all of our staff to always take notice as they come & go from the property & office area as to the signal light being on or off. I believe that this will ensure that the signal to pump would never be missed and will accomplish the same thing without the need for overhead or underground cables. I am in the process of searching out the best type of float switch alarm but as you have requested will run it by you for approval prior to purchase. Thanks in advance for considering this modification to the conditions. Jim Jim Wilson Project Manager Expanding Our Territories Tigard First Baptist FILE copy/ 503- 639 -3913 Original Message From: Hap Watkins [mailto:HAP @tigard- or.gov] Sent: Monday, January 23, 2006 1:29 PM To: Jim @tigardfirstbaptist.com Cc: Gary Lampella Subject: Re: Tigard First Baptist Church I have spoken with the Building Official regarding this use, and, though the time period is beyond our normal "temporary use" application, we have agreed that you may use the holding tank for the original file: / /C:\Documents and Settings\hap \Local Settings \Temp \GW }00001.HTM 1/24/2006 Page 2 of 2 {x+ septic system with the following conditons: 1. The outlets to the leach lines will be closed and sealed in a permanent manner, 2. The holding tank will have a "pump now" alarm that is monitored at a normally occupied location (reception or main business office), and 3. Reports will be submitted to the Building Department every six months, which note the occurrence of alarms and the invoices for the pumping of the tank at each alarm. 4. The holding (septic) tank will be de- commissioned and inspected when the building is demolished under permit. Please contact me with the technical data for the alarm you intend to install on the tank before actually doing the work. There are some details that need to be covered, such as the alarm repeating until manually turned off (in case it goes off after hours), getting correct permit, etc. Thank you for your request and patience hap »> "Jim Wilson" <Jim @tigardfirstbaptist.com> 01/18 3:44 PM »> Hap, We last communicated around the end of November about our request to cap off the septic tank and pump it on a regular basis for a building on our property that will be demolished in phase 3 of our expansion project. A few weeks back we did get word from Matt at the city who was our Associate Planner in charge of our project that you had mentioned to him that you were going to approve our request with certain conditions which would include an alarm system as well as some reporting to the city. I had agreed to both of these conditions in my last e -mail to you and have just been waiting for your letter and the details of the conditions. I am not trying to rush you because I know you have a full plate but I have been experiencing some e- mail problems and thought just in case something happened and you had sent me another communication that didn ❑t get through I would touch base. Looking forward to hearing from you and thanking you in advance for your willingness to work with us on this special request. Best Regards Jim Jim Wilson Project Manager Expanding Our Territories Tigard First Baptist 503- 639 -3913 file: / /C:\Documents and Settings\hap \Local Settings \Temp \GW }00001.HTM 1/24/2006