Permit r r'
•
CITY OF TIGARD BUILDING PERMIT
' 2 ' COMMUNITY DEVELOPMENT Permit #: BUP2009-00076
Date Issued: 05/07/2009
TIGARD 13125 SW Hall Blvd , Tigard OR 97223 503 639 4171
Parcel: 251018801400
Jurisdiction: TIGARD
Site address: 12150 SW GARDEN PL, BLDG# 3
Subdivision: PARK 217 Lot: 0
Project: Harris Worksystems
Project Description: TI
Owner: FEES
WALTON CWOR PARK BC 8 LLC Description Date Amount
BY TTA/EPROPERTYTAX DEPT 325, PO BOX Permit Fee - COM 05/07/2009 $558.70
4900 Tax - 12% State Surcharge 05/07/2009 $67.04
PHONE: Plan Review 05/07/2009 $363 16
Plan Review - Fire Life Safety 05/07/2009 $223.48
Contractor:
TODD CONSTRUCTION
4080 SE INTERNATIONAL WAY B -11
MILWAUKIE, OR 97222
PHONE. 503- 653 -5704
FAX 503- 653 -5704
Specifics:
Type of Use: COM
Class of Work: ALT
Dwelling Units- 0
Stories: 1 Height: 0 ft
Bedrooms: 0 Bathrooms: 0
Value: $90,000
Floor Areas:
Total Area 0
Accessory Struct 0
Basement 0
Carport 0
Covered Porch 0
Deck 0
Garage 0
Mezzanine 0
Total $1,212 38
Required: Required Items and Reports (Conditions)
Fire Sprinkler. Parapet
Fire Alarm Protected Corridors
Smoke Detectors Manual Pull Stations
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR Specialty Codes and all other applicable law All work
will be done in accordance with approved plans This permit will expire if work is not started within 180 days of issuance, or if work is suspended for R ore
the 180 days ATTENTION Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Cente• hose rules arz set forth . OAR
952 - 001 -0010 through OAR 952- 001 -0100 You may obtai copy of the rules or direct questions to OUNC by calling • r 246 6699 • r ( 800 . •:A44
Issued By rE� � t(1 ` �( \ \1 � Q� Permittee Signature: 1 Ma r
l ' V
Call 503.639.4175 by 7:00 a.m. for an inspection that business day.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the tome of each inspection.
Building Permit Application t
Commercial FOR OFFICE USE ONLY
RECO VEL .
City of Tigard DateB (. ` Permit No 1
,'_ass • 600-1 ,.
q 13125 SW Hall Blvd., Tigard, OR 97223
Phone. 503 639 4171 Fax • 503 598 1960 MAY 0 7 2009 Plan Review DI/ a f
Date/B .S''' Other Permit
T I GA RD Inspection Line: 503.639.4175 e p Date Ready /By ® See Page 2 for
Internet. www tigard -or gov �� GARD Notified/Method Supplemental Information
TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING
❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed.
Indicate the value (rounded to the nearest dollar) of all
ddition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1- and 2- family dwelling Commercial /industrial
Valuation: $
El Accessory building ❑ Multi- family
Number of bedrooms:
El Master builder ❑ Other: Number of bathrooms:
JOB SITE INFORMATION AND L CATION Total number of floors
Job site address: p- ISO c W 6 Er., f7[ l c. New dwelling area: square feet
City /State /ZIP: ~ / � / - CI" "Cif ®� 1 7 `)- —3 Garage /carport area: square feet
,
Suite/bldg. /apt. no.: Project name: i- i �`�, ` , l/
- ! s b / s Covered porch area: square feet
Cross street/directions to job site: !6 " Deck area: square feet
Other structure area: square feet
REQUIRED DATA: COMMERCIAL - USE CHECKLIST
Subdivision: l Lot no.: Permit fees* are based on the value of the work performed.
Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all
equipment, materials, labor, overhead, and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Valuation: $ C,/� O -o-d
a Existin g buildin g area: ` s ufre feet
q
New building area: square feet
PROPERTY OWNS %JLr ❑ TEN ANT Number of stories:
Name: _f�. Type of construction:
Address: � • Occupancy groups:
City /State /ZIP: C0 - n 7� � 0 Existing: -
Phone: (503 ) / , ,3_,� Fax: ( New:
❑ , LICANT ❑ CONTACT PERSON NOTICE
Business name: 1 1 D� G ,-, 5 F All contractors and subcontractors are required to be
Contact name: j llll//// lJ ' � J licensed with the Oregon Construction Contractors Board ter ` _ under ORS 701 and may be required to be licensed in the
Address: L, 0 0 /�� i - $ -- /�� jurisdiction in which work is being performed. If the
PI
City /State /ZIP: 1 4/1
1 � 6 /� l: 7.2/2, ' applicant is exempt from licensing, the following reasons —
pp�� ax: " apply:
Phone: (503)67S? _ 7V Fax: ' (�43) (63 ,s 7
E -mail: `�
CON R C gip
Business name: _ �, "Ns BUILDING PERMIT FEES* ...i--- b
Address: a ' c, 3 (Please refer to fee schedule)
� -1 e)
City /State /ZIP: nth/ '.e ® t 202 Structural plan review fee applicable): deposit):
(� F / FLS plan review fee (if applicable
Phone: ( ) Gas 3 57 Q I ax: ( ) 6s _
e
CCB lie.: S l T ot al fees due upon application: I l a . - v
Q
Amount received: la Authorized signature: Mfg, 1 i T his permit application expires if a permit is not obtained
AI s „-, , , within 180 days after it has been accepted as complete.
Print name: f, m Date: � ,-0�y * Fee methodology set by Tri-County Building Industry
Service Board
I.\Bmldtng\Permits \BUP -COM PermitApp doe 2/23/07 440- 4613T(11 /02 /COM/WEB)
i, •
y �
_ 1111 Building Division
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation, alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabihties unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per -cent (25 %).
VALUATION: Total of all renovation, alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER (25% barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single umsex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains: and, $
(g) When possible, additional accessible elements such as storage and
alarms: $
TOTAL (shall equal line [2] of Valuation Computation): $
I \ Building \Perrruts \BUP -COM PermitApp doc 06 /25/08
1.
.1
v �
Building Division
Plan Submittal Requirements
TI G A R D Commercial & Multi- Family - New, Additions or Alterations
1. SITE PLAN (fully dimensional, drawn to scale) labeled with:
A. El map & tax lot # ❑ project name ❑ site address ❑ suite number
El zonin El applicant name El phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking, including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape -ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations, plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit - based on valuation of project.
4. EXTRA SET OF THE FOLLOWING:
A. Two (2) copies of site plan to include vicinity map.
B. One (1) copy of erosion control plan with details.
C. Fire Department Building Survey, and full set of architecture drawings.
I: \Building \Permits \BUP -COM PermitApp doc 06/25/08
B uilding Division
Plan Submittal Requirement Matrix
T I G A R D Commercial & Multi- Family - New, Additions or Alterations
Type of Submittal # of Plans
(Includes new, additions and alterations.) Required at
Submittal
Demolition Permit 2
(site plan required showing location and square
footage of all buildings to be demolished)
Site Work 2
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 2
Fire Protection System 2
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard, Washington
County, and Tualatin Valley Fire & Rescue)
I. \ Building \Pecnvts \BUP -COM PermitApp.doc 06/25/08