Permit Support Document r' CITY OF TIGARD BUILDING INSPECTION DIVISION ` 41-rift,- _ Gd /� j
MST
24; Hour Inspection Line: 639 -4175 Business Line: 639 -4171
BUP
Date Requested /7— 67 AM PM BLD
Location / Z- 5 5G—ti GGG !' 4...t, 5 /— Suite MEC
Contact Person <Jo 4p. Ph - f /7_„..3 PLM
Contractor Ph SWR
BUILDING . , : Tenant/Owner ELC
Retaining Wall ELR
Footing
Access: FPS
Foundation
Ftg Drain /01 7 7, ....' SGN
Crawl Drain Inspec ion Notes:
Slab SIT
Post & Beam
Ext Sheath /Shear
Int Sheath /Shear
Framing
Insulation
Drywall Nailing
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof
Misc:
Final
PASS PART FAIL
LUMBIN
os & Beam
Under Slab
Top Out
Water Service
Sanitary Sewer
Rain Drains
PART FAIL
e . . : CHANICAL
Post & Beam
Rough In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough In'
UG /Slab
Low Voltage
Fire Alarm
Final
PASS PART FAIL
SITE
Backfill /Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin
Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
ADA
Approach /Sidewalk Date l ( / 6 Inspector 7/ V Ext
Other
Final
PASS PART FAIL DO HOT REMOVE this inspection record from the job site.