Permit CITY OF TIGARD 24 -Hour
BUILDING Inspection Line: (503) 639 -4175
INSPECTION DIVISION Business • e: (503) 639 -4171 MST
BUP
Received Date Requested 3 - AM PM BUP
Location 7 P7 - Suite MEC
Contact Person Ph ( ) aO d ; LM
Contractor v�l Q Ph ( ) 7 ' 1 4 d . — �. _� _ R
L i
BUILDING Tenant/Owner b w � ` ' �t � +�''�` ELC 4 S
Footing
Foundation ELC
Access:
Ftg Drain ELR
Crawl Drain
Slab Inspection Notes: _ _ _ / SIT
Post & Beam ?" / /f�Y/G2-� -�/� Shear Anchors
Ext Sheath /Shear
Int Sheath /Shear
Framing
Insulation
Drywall Nailing ba-7
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof
Other:
Final
• PASS PART FAIL
PLUMBING
Post & Beam
Under Slab
Rough -In
Water Service
Sanitary Sewer
Rain Drains
Catch Basin / Manhole
Storm Drain
Shower Pan
Other:
Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough -In
Gas Line
Smoke Dampers
-
Final
P SS- BART FAIL
Service
Rough -In
UG /Slab
Low Voltage
/ce Mlarm
Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
PART FAIL
= .-L
Please call for reinspection El Unable to inspect - no access
Fire Supply Line /
ADA S
Approach /Sidewalk Date Inspector
Other:
Final DO NOT REMOVE this inspection record from the Jo site.
PASS PART FAIL