Loading...
Permit CITY OF TIGARD BUILDING PERMIT ET C OMMUNITY DEVELOPMENT P BUP2011 -00222 Date Issued 10/26/2011 .TIGARD 13125 SW Hall Blvd , Tigard OR 97223 503 718 2439 Parcel 2S101 C600400 Jurisdiction Tigard Site address 12700 SW HALL BLVD D Project Oregon Aqua Farms Subdivision 2007 -064 PARTITION PLAT Lot 1 Project Description Change of occupancy Contractor Owner TCTPI LLC 4260 GALEWOOD ST, STE A LAKE OSWEGO, OR 97035 PHONE PHONE FAX FEES Specifies Description Date Amount Type of Use COM Permit Fee - Additions, Alterations, 10/26/2011 $53 27 Cldsb of Work ALT Demolition Dwelling Units 0 12% State Surcharge - Building 10/26/2011 $6 39 Stories 1 Height 0 ft Plan Review 10/26/2011 $34 63 Bedrooms 0 Bathrooms 0 Plan Review - Fire Life Safety 10/26/2011 $21 31 Value $500 Info Process /Archiving - Sm Sheet (up to 10/26/2011 $2 00 11x17) Floor Areas. Total Area 0 Accessory Struct 0 Basement 0 Carport 0 Covered Porch 0 Deck 0 Garage 0 Mezzanine 0 Total $117 60 Required: Required Items and Reports (Conditions) Fire Sprinkler Yes Parapet Fire Alarm Protected Corridors Smoke Detectors Manual Pull Stations Accessible Parking 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR Specialty Codes - d at other applicable law All work will be done in accordance with approved plans This permit will expire if work is not started within 180 days of issuance, ' r if work is suspended for more the 180 days ATTENTION •regon law requires you to follow the rules adopted by the Oregon Utility Notiti atio' Cent r Those rules are set forth in OAR 952-001-0010 rough OA • 2 -001 -0090 You may obtain a copy of the rules or direct questions to OUNC by calling Si ` /'32 19: or 1 800 332 2344 Issued B ■ aa . / Permittee Signature j'A 4 7r 1 Call 503 639 4175 by 700 am for the next available inspects .n date This permit card shall be kept in a conspicuous place on the job site until completion of the project Approved plans are required on the job site at the time of each inspection l C t. Building Permit Application p, Commercial j� FOR:OFFICE USE ONLY Received City of Tigard Date/By %o .2 6 1, Permit No . u�p�(� —� ' ° 13125 SW Hall Blvd, Tigard, OR 9 2t Plan Review 1 ' 1 / 1 Phone 503 718 2439 Fax 503 59 g v b s Darelu t (o n other Penan Ti GAItO Inspection Line 503 639 4175 `` C� Date Ready /By ions El See Page 2 for Internet www tigard - gov d i` e . ` s, Non led/Method Supplemental Information { .nl'l3` i .�,s�v TYPE OF WORKV „8( ” REQUIRED DATA: I- AND 2- FAMILY DWELLING ❑ New construction Ill Demo "V'' hh 7"- on Permit fees* are based on the value of the work performed Indicate the value (minded to the nearest dollar) of all ❑ Addition/alteration/replacement Other 0 LC,ospe irtC,L I equipment, materials, labor, overhead, and the profit for the CATEGORY OE CONSTRUC fION work indicated on this application ❑ I - and 2- family dwelling tatCommercial /industrial Valuation $ ❑ Accessory building ❑ Multi- family Number of bedrooms ❑ Master builder ❑ Other Number of bathrooms JOB SITE INFORMATION AND LOCATION Total number of floors Job sae address \ s''-;100 e W I �t� 1400 I 13 i °ate, —L( New dwelling area square feet City /State /ZIP - care"( t jg, A T t T Z2.3 Garage /carport area square feet Suite/bldg /apt no Project name O r& on T"Or (Act, F otir(f\.� Covered porch area square leet L./ G Cross street/directions to job site Deck area square feet Other structure area square feet REQUIRED DATA: COMMERCIAL, USE CHECKLIST Subdivision Lot no Permit fees* are based on the value of the work performed Tax map /parcel no Indicate the value (rotnded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the /'� _� DESCRIPTION OF WORK _ work indicated on this application ( r l_ G � to - et �A��� ^ .aAV ' Valuation S 6� Vii! Existing building area square feet New building area square feet ■ E RO' , T • Al 'I ENANT Number of stones Name A . -( (', TY,k Type of construction Address i'a„ -.o3 \jJ k � eIII i, ` xi� c� � )-L( Occupancy groups City /State /ZIP - � , c�P Q1` - I Existing Phone (505) C.13S -2 Sit fax ( ) New ❑ APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name Structural plan review fee (or deposit) Contact name FLS plan review fee Of applicable) Address City/State/ZIP Total fees due upon application ��// /� Phone ( ) Fax ( ) Amount received W i/ 7. eo 0 E - mail PHOTOVOL FAIL SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof -to ounted Photovoltaic Solar Panel Syste I Business name Submit two sets of roof plan with conne . details • and fire departmen Qess, along with - 2010 Oregon Address '- Solar Installation Specta ode • ckhst City /State /ZIP Permit fee (includes • n view $180 00 and ad.• istrative to Phone ( ) Fax ( ) State sure :e (12% of permit fee) \ $21 60 CCB he otal fee due upon apphcation $201 60 Authorized signature � T his permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name A AAD2,P \A / Ca.4 , e Date 3S oet fat) • Fee methodology set by Tn -County Building Industry J7 Service Board f I U3uilding\Permits \BUP -COM PennitApp doe 02/24/2011 440 -4613T(11 /02 /COM/WEB) _ Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation, alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty -five per -cent (25 %) VALUATION: Total of all renovation, alteration or modification being done, excluding painting and wallpapering [I] $ MULTIPLIER (25% barrier removal requirement). x 25 TOTAL BUDGET FOR BARRIER REMOVAL: 121 $ ELEMENTS: In choosing which accessible elements to provide under this section, pnonty shall be given to those elements that will provide the greatest access Elements shall be provided in the following order (a) Parking (b) An accessible entrance $ (c) An accessible route to the altered area $ (d) At least one accessible restroom for each sex or a single unisex restroom $ (e) Accessible telephones $ (f) Accessible drinking fountains and, $ (g) When possible, additional accessible elements such as storage and • alarms $ TOTAL (shall equal line (2] of Valuation Computation): $ t I \Budding \Permits \RUP -COM PerrtvtApp doe 03/03/2011 4 /2700 to «4v' - a -el Building Division Development Code Provision Review TIGARD Commercial .2g2 rcial Projects - No Associated Land Use Case Building Permit No: t Dan(�00 � i:xpedited Review Plan Submittal Date /0/24A/ To the Applicant: ). If the proposed use is not permitted within the zone, please contact the Building Division to cancel the permit application Building Permit Technicians (503) 718 -2439 D If a land use is required and for all other questions, please contact the staff person listed above the Planning Review section Staff: please check items along left only if approved. / Plan • g Review (contact /l at 503 -718eW orr /by) @ ti g ar(.1-or gov) V Zoning 't Permitted Use Yes tl� No ❑ E Land Use Required Yes ❑ No 0 7.------- (explam below) Notes /frifiete- / frie/S ( %fX4 G// 4 f — L t r A/� r fr /H /J/� 14 E tpproved ❑ Not Approved Date. / C 24/ P A' Permit Coordinator Review (c . t ct Albert Shields at 503- 718 -2426 or albert @tigard - or.gov) Notes flit Routed back to Building Division Date I \CURPLN October 25, 2011 RECEIVED D OCT 26 2011 To City of Tigard, Planning Division CITY OF TIGn ?D From Andrew Cramer, Oregon Aqua- Farms, LLC BUILDING D1ViStON RE• Parking Requirement for Occupancy, 12700 SW Hall Blvd Thank you for your assistance regarding the establishment of Oregon Aqua -Farms in the City of Tigard The following letter is intended to provide a brief description of the parking requirements for the use of Oregon Aqua -Farms The company expects to employ no more than two people at the aforementioned location, for a total of three required parking spaces. The company will receive no more than two deliveries per week and these deliveries will come on small trucks (i e non - tractor trailer) 1 -2 times per week a food distributor will pick up shipments for delivery. The company will not conduct any other type of shipping or receiving. The nature of the business requires limited interaction with the system at any given time; once per day an employee will spend 1 -3 hours on site feeding and collecting water quality data, and 1 -2 times per week gathering product for shipment As a result, there will never be a time when more than 2 employees will be on site Due to these factors, there is a very low parking requirement for the business, and no more than 3 parking spots will be required for the business to operate at any given time. CITYQF TIGARD Approved ( I [ o/ Conditionally Approved [ ] See Letter to: Follow [ Permit Numberttad( - P Addre : NTir By: Date: [el I cy Occupancy Load Construction Type Rated Corridor Energy Code �... Accessibility ..� OFFICE COPY Exhblt B -3 Floor Plan of the Building IIIPr QUILPING D -1 ,11 BUILDING D-3 SEGOND FLOOR OFFICE .. 1642 SFG 101 era. • �IIIOI 3 215FG. 27;1 : DUI •IN • • 9298 SFG Al BULDING D_2 - • _ 1 6 SFG. Sa _ o- •. �I I DING D -�• I Plik Mi 3,301 5FG ■ L. , , , 7; y7� . F i i )_ 1 ,q,/;-;' (A "k i.>t ::7 f, 'f'J == .r ,ka _a _____ _ •. . _ , y 1 l i 1 19 of 25 October 25, 2011 To: City of Tigard, Planning Division From. Andrew Cramer, Oregon Aqua- Farms, LLC RE• Bracing of water storage tanks Thank you for your assistance regarding the establishment of Oregon Aqua -Farms in the City of Tigard. The following letter is intended to provide a brief description intended bracing of each water storage tank in the facility The tanks will store only water, no harmful chemicals or additives will be placed into the tank at any time Because the tanks contain no harmful materials or substances and are not connected to any sort of fixtures or plumbing, there is no direct specification or requirement for seismic bracing The closest standard for a water storage tank of this type is the American National Standards Institute ANSI /APSP -4 2007, which does not require any sort of bracing for above ground pools. If additional bracing is required by the City of Tigard, the following steps will be taken• 1 4 of the metal framing footers around the tank will be secured to the floor with %," threaded and bolted rod (to meet ASTM A307 -A) (� i p 7c rF r ours i� 10CD 2 The threaded rod will be anchored into the floor with SIM SET XP -22 epoxy `\ This bracing will secure the tanks to the space floor, and prevent any sort of later al or vertical movement within the framing. g a , Jew �D )i g Me og flMali T en. — \ I 1 )1 (---- ----\\ _./ c I I / \ V Y19,4"; r„ en( / ______Y 19:t oo'e - 3c41.-3 1 1 H R