Report 07/11/08 FRI 11:30 FAX 503 670 9147 CARLSON TESTING ll002
nab. Offs Sulem 017744 Lend 0ffi•
Carlson �y T e s tin Inc. aA$NYJ,in -.4. 4UGf1 HiWJa� Sf., Nli 0015 OR Rd h Rd -1 l
OR 977
I 1 a J i 11 ■`/. %T. & OR 9771.9 4050 a :17.14:1 l L4mA, fi_
11.1.: 603) fis. 1) Phen v (503) 5!9.1:52 1'1roN.: (5 4I) 99 LULSs
Construction , Materials Testing & Inspection ., ^c se•, w; Pe: r5nas.raram r'n.ndn wK9
•
Special InspecOon
FINAL SUMMARY LETTER
July 10, 2008 •
Job #T0709685A
•
City of Tigard
13125 SW Hall Blvd •
•
Tigard, OR 97223 -8199
•
Attn: Building Department
Re: Oak Street Townhomes — Building 1 (Units 1 -11) •
SW Oak Street -- Tigard, OR
Permit Numbers: •
Unit A ddress Permit No. Unit Address Permit No
1 8934 SW Elena Lane MST2006 -00197 7'; 8896 SW Elena Lane MST2006 -00203 <
2 8930 SW Elena Lane MST2006 -00198 8: 8892 SW Elena Lane MST2006 -00204
3 8926 SW Elena Lane MST2006 -00199 9; 8888 SW Elena Lane MST2006 -00205
4 8922 SW Elena Lane MST2006 -00200 10 8884 SW Elena Lane MST2006 -00206 _
5 8918 SW Elena Lane MST2006 -00201 11 8880 SW Elena lane MST2006 -00207
6 8900 SW Elena Lane MST2006 -00202
Dear Sir or Madam:
•
•
•
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only: ,
Structural Steel
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code :and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
•
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTIN , INC.
• I
Neil S Shann••
I ��
Project Manager
NSS /Id
cc: Oak Street Townhomes LLC — Kurt Larson •
City of Tigard Building Division
Don Cushing Associates
Icon Architecture /Planning — Dan Goodrich