Loading...
Plans (17) July 23, 2004 Mr. John Westfall DOWA - 319 SW Washington Street _ Suite 200 Portland, OR 97204 Reference: Tigard High School Additions /Remodel — Phase 2 Structural Plan Rev /� Building Permit No BUP2004 -00206) - / o 2 5 u1 4 1 Tigard, Oregon NDI Project No.: 432.00 Dear John: Subject: Structural Responses to Plan Review #1 As you requested, the following list is in response to open structural items for the subject project: Refer to revised elevation on 2/S2.11 with correct detail call -out 13/S4.0. ,2. Refer to revised elevation on 2/S2.11 with correct detail call -outs at correct locations. ,3 Refer to attached calculation sheets PC -3a through PC -3b. Further clarification • also on response to plan check item 14. /4: The added floor framing is located at grade level. The space below the framing is an existing tunnel. Therefore, wall anchorage is not required and cross -grain bending will not occur. Refer to revised detail 17/S6.5 for correct floor elevation. . Refer to revised plan on 2/S2.12. This note was removed. Refer to revised plan on 1/S2.12 with missing detail numbers provided. Refer to revised plan on 1/S2.12 with correct detail call -out 8/S3.2. Refer to attached calculation sheets PC -8a through PC -8h for loads applicable to composite fiber reinforcing (CFR). CFR is a deferred submittal item; therefore the product manufacturer will supply specific details. The composite fiber reinforcing shown on details 3/S2.13, 4/52.13, and 18/S3.1 is being utilized for in -plane lateral loading to the concrete walls, therefore the CFR is tensile reinforcing for a - concrete beam and not an uplift force. ,! Refer to attached calculation sheets PC -9a through PC -9c. At. Refer to revised plan on 1/52.32 and new detail 15/S6.4. ,ra -. Refer to drawing S6.5. Detail 7/S6.5 has been changed to 10/S6.5. lv �2 ' Refer to attached calculation sheets PC -12a through PC -12c and new detail 4 16/56.5. ..„1- 3 to revised detail 17/S3.1 with correct detail call -out 11/S4.0. Also refer to revised detail 11/S4.0 with correct column call -out. )A!Refer to original calculations dated May 3, 2004. See pages LS -98 through LS -106 for collector calculations using design loads specified in code section 1630.3.1. The typical beam connections shown on detail 5/S1.2 have been utilized for these loads. Design loads shown in the calculations have been converted to allowable stress loads. This method is clarified in attached calculation sheets PC -14a through PC -14c. r 1,5, Refer to revised detail 18/S3.4. 2 1/2" diameter pipe is specified. /YS. Refer to revised detail 19/S3.4. 7/8" diameter A325x bolts are specified. /r7. Refer to new detail 17/S3.5. Mr, John Westfall DOWA Reference: Tigard High School - Additions /Remodel - Phase 2 NDI Project No.: 432.00 Subject: Structural Responses to Plan Review #1 Page 2 of 3 Refer to revised details 5/S3.5, 10/S3.5, and 13/S3.5. Also refer to attached calculation sheet PC -18. ,„.-1-9' Refer to revised detail 8/S3.5 and attached calculation sheet PC -18. .28'! Refer to revised plan 1/S3.5 with corrected detail call -out 16/S3.5. /2T. Refer to revised detail 14/S3.5. The L6x3 1/2x5/16 is not a structural member as it only serves only as closure piece for the composite deck that bears on the steel tubes at each end. Refer to revised detail 18/S3.5. The correct member size is noted as HSS10x6x3 /8. Also refer to calculation sheet PC -22. Refer to revised detail 20/S3.5. Detail 6/53.5 is noted. }4''Refer to revised detail 20/S3.5. HSS 6x4x1/4 is noted. .25. Refer to revised detail 20/S3.5. L6x3 1/2x5/16 is noted. _26. Refer to revised detail 14/S4.1 with correct wall height notation. � ; '� 9 ;I'_� - -27. Refer to attached calculation sheet PC -27. ►' Refer to revised detail 7/S5.1 and attached calculation sheet PC -28. ,2Refer to revised detail 11/55.1 and attached calculation sheet PC -29. Refer to revised detail 18/S5.1 with correct detail call -out 17/S1.1. , Refer to revised detail 5/56.0 and attached calculation sheet PC -31. Refer to revised details 1 & 9/S6.1 and attached calculation sheet PC -32. r ./ .33. Refer to revised detail 19/56.1 and attached calculation sheet PC -33. t/�Y Refer to revised detail 11/S6.1. .35: Refer to revised detail 15/S6.1 with correct detail reference 18/S6.1. .,36. Refer to revised detail 1/S6.2 and attached calculation sheet PC -36. �77 Refer to revised detail 16/S6.2 and attached calculation sheet PC -37. / ,38 to revised detail 3/S6.3. Refer to revised detail 11/S6.3. --40 Refer to revised detail 18/S6.3. p 4.1! Refer to original calculations dated May 3, 2004. The calculations on sheet BD -2 check single plate shear connections for HSS columns based on AISC procedure defined in pages 4 -96 through 4 -108 of "Hollow Structural Sections Connections Manual ". As defined by this procedure, the support is considered rigid since the reaction eccentricity is located within the bolted connection. For calculation of lateral connection refer to attached calculation sheet PC -41. Refer to revised detail 17/S6.5. ...4 Refer to revised detail 10/56.6. ___44-. to revised detail 15/S6.6. Refer to original calculations dated May 3, 2004. Calculation on sheet BD -4 includes an un- shored stress check under the summary section. ..4 Refer to attached calculation sheets PC46a through PC46f and revised detail 15/S3.4. --4'i.. Refer to response for item 14 and calculations on sheets PC14a through PC14c for clarification of calculated Em. Items 48 through 55 are deferred submittal items and do not require our response. . .Mr. John Westfall DOWA Reference: Tigard High School — Additions /Remodel — Phase 2 NDI Project No.: 432.00 Subject: Structural Responses to Plan Review #1 Page 3 of 3 If you have any questions, please call me at (503) 274 -1843. Sincerely, • NISHKIAN DEAN 0 Robert A. Aman, P.E. Project Engineer • Enclosures: (1) Supplemental structural calculations dated 07- 23 -04. (2) Copy of Structural Checksheet dated 06- 30 -03. (4 sheets) (3) Set of Structural Drawings dated 07 -23 (26 Sheets) h: I nd432 tigard hs additions l adm /n [plan check) plan check response 7-23-04.doc