Loading...
Report (9) 15575 SW Sequoia Parkway Suite 140 Portland, OR 97224 90 CONSULTING August 31, 2004 ENGINEERS, INC City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 Attn: Hap Watkins Building Division Re: Tigard High School Renovation Project Stormwater Facilities CUP2004 -00001 `� Dear Hap: 6t 1- r 2 - &c ( /qo1 S�c-D A p The engineering design for stormwater quality at Tigard High School incorporated the following: 1. A single new filter catch basins manufactured by Stormwater Management, Inc. to provide water quality for the new impervious area. (It should be noted that an alternate (existing) area was selected for the new basin in lieu of the actual new paving. The new paving was mostly courtyard sidewalks with multiple small drains. A larger paved vehicle area was selected as an opportunity to provide water quality in a more needed area.) 2. For the construction access road into the site from SW 85 a filter grass strip was provided for biofiltration of runoff from the road. Detention was provided by 300 linear feet of underground perf pipe and a flow control manhole. I visited the site at various stages of construction and confirm that the installation of the quality and detention facilities are in conformance with the design and specifications. Sincer: x " Mark Wharry, P.E. Principal c: Brian Greenwood / DOWA Craig Marcus / Cornerstone O:\2403 TTSD- TigardHS \DOCS\LETTER \083105hw wpd 503 / 226 -3921 fax: '226 -3926