Plans Sherman Englneerin._. Inc. (503) 230 -8876 Ph
. 4 I 0 NW Kearney #5 17, Portlan, OR 97209 (503) 226 -4745 Fax
MEMORANDUM i n 6Lp006 3 e
TO: Mr. Peter Magaro, Architect 'y/
10570 SW Citation Drive
Beaverton, OR 97008
DATE: .tune 13. 2007
FROM: Don P Sherman, PE
Principal
RE: Cedar Ridge plans
Hillsboro, Oregon
NOTE:
This memo is to inform you of our recommendations for a clarification and a
change to the original design. On our design we only show one holdown in
corners with abutting shear walls because the design forces are required in one
direction at a time and one holdown may work for both directions. Make a note
that the larger of the two holdowns must be used.
Also we understand a STHD 14 holdown has been misplaced. We recommend
using a HTT22 in a epoxy setting per our detail RI.
If you have any questions please give me a call.
r,
,* :4 a e4N
"VP sti
CC: Dean Grey @ Comcast.net Eames: t i c
File- Magaro06l 307.doc