Specifications 6/4 Pircn" 6. NORTHWEST a • ;'HrA4' N'DLING SYSTEWA'S The Material Handling Experts May 25, 2005 To: City of Tigard From: Steve Flexer NorthWest Handling Systems, Inc 18008 NE Airport Way Portland, OR 97230 503 -465 -9200 Oregon CCB: 65422 To Whom It May Concern: 3 DO 7b The Stash Tea Company of 7284 SW Durham Rd has asked that NWHS apply for a permit specifically related to a storage rack upgrade and reconfiguration project. Attached: - Seismic calculations for the tall storage rack; 8' and under shelving will be reconfigured and anchored but are not required to be structurally approved per code. - As -Built and proposed floor plans indicating rack locations. - Site plan as approved by landlord, Pac Trust (Martin Hansen 503- 624 -6300) Notes: • Stash Tea Company plans on utilizing existing emergency exits, lighting and egress paths. • The existing maintained sprinkler system is .475 GPM / 2000 sq. Ft., 26' High, Class 4 extra hazard with large orifice 286 degree heads. Commodity remains the same: Packaged teas within corrugated cartons upon wood pallets. • Project Value: $39,169.00 Sincerely, �1r Steve Flexer System Specialist Anchorage Eugene Portland Renton Spokane Yakima • , SEIZMIC 0 MATERIAL HANDLING ENGINEERING EST_ 1985 STORAGE RACKS STEEL SHELVING SEISMIC ANALYSIS ALASKA KENTUCKY NORTH CAROLINA DRIVE -N RACKS MOVABLE SHELVING STRUCTURAL DESIGN ARIZONA MARYLAND OHIO CANTILEVER RACKS STORAGE RACKS CITY APPROVALS CALIFORNIA MASSACHUSETTS OKLAHOMA MEZZANINES MODULAR OFFICES STATE APPROVALS COLORADO MICHIGAN OREGON CONVEYORS GONDOLAS PRODUCT TESTING CONNECTICUT MINNESOTA PENNSYLVANIA CAROUSELS BOOKSTACKS FIELD INSPECTION FLORIDA MISSOURI TENNESSEE PUSHBACK RACKS FLOW RACKS SPECIAL FABRICATION GEORGIA MONTANA TEXAS RACKBUILDINGS FOOTINGS PERMITTING SERVICES IDAHO NEBRASKA UTAH ILLINOIS NEVADA VIRGINIA INDIANA NEW JERSEY WASHINGTON KANSAS NEW MEXICO WISCONSIN . �; :,-..,x,..,„„,- SEISMIC ANALYSIS . , a . , � - OF STORAGE RACKS � ? FOR . STAS TEA COMPANY , , , itr i 7204 S.W. DURHAM ROAD ea '' TIGARD OREGON. 97224 pm Job No. 05 -0714 : � _ " 41 3' x ,,,k xag ,I ` pear . k x . il '.'" : ' V\ 1 .4 - ; }'( d J . JJ # /K ti �'4 F Y . P.E. 4 � s CORM t/' r . • @pu f ,,,:0,, . 161 ATLANTIC STREET * POMONA * CA 91768 * TEL: (909) 869 -0989 * FAX: (909) 869 -0981 ,1 SEIZIlA lc PROJECT STASH TEA COMPANY FOR NWHS MATERIAL HANDLING ENGINEERING SHEET NO. 2 TEL : (909)869 - 0989 FAX : (909)869 - 0981 CALCULATED BY RF 161 ATLANTIC STREET, POMONA, CA 91768 DATE 5/19/2005 TABLE OF CONTENTS TABLE OF CONTENTS & SCOPE 2 PARAMETERS 3 COMPONENTS & SPECIFICATIONS 4 LOADS & DISTRIBUTION 6 LONGITUDINAL ANALYSIS __. �_ _ __ _,___ ,___.___ ._ _. ___ __ 7 COLUMN 8 BEAM 9 BEAM TO COLUMN 1 BRACING 12 OVERTURNING 1 BASE PLATE 14 SLAB &SOIL 15 SCOPE: THIS ANALYSIS OF THE STORAGE SYSTEM IS TO DETERMINE ITS COMPLIANCE WITH THE APPROPRIATE BUILDING CODES WITH RESPECT TO STATIC AND SEISMIC FORCES. THE STORAGE RACKS ARE PREFABRICATED AND ARE TO BE FIELD ASSEMBLED ONLY, WITHOUT ANY FIELD WELDING. SEIZMIC PROJECT STASH TEA COMPANY FOR NWHS MATERIAL HANDLING ENGINEERING SHEET NO. 3 TEL : (909)869 - 0989 FAX : (909)869 - 0981 CALCULATED BY RF 161 ATLANTIC STREET. POMONA, CA 91768 DATE 5/19/2005 THE STORAGE RACKS CONSIST OF SEVERAL BAYS, INTERCONNECTED IN ONE OR BOTH DIRECTIONS, WITH THE COLUMNS OF THE VERTICAL FRAMES BEING COMMON BETWEEN AND ADJACENT BAYS. THE ANALYSIS WILL FOCUS ON A TRIBUTARY BAY TO BE ANALYSED IN BOTH THE LONGITUDINAL AND TRANSVERSE DIRECTION. STABILITY IN THE LONGITUDINAL DIRECTION IS MAINTAINED BY THE BEAM TO COLUMN MOMENT RESISTING CONNECTIONS, WHILE BRACING ACTS IN THE TRANSVERSE DIRECTION. 0 --- I .;1; O \ ,. 1 I , .10 I o col". -,„14414,444 41 0 e ■ 6 CONCEPTUAL DRAWING . 0 TRIEUTARYAREA l LEGEND 1. COLUMN a :.:. >:.: :.:.:.:........ :.:.:.: . 2. BEAM i • 3. BEAM TO COLUMN i i 4. BASE PLATE 5. HORIZONTAL BRACING 6. DIAGONAL BRACING TRANSVERSE 7. BACK TO BACK CONNECTOR LONGITUDINAL *ACTUAL CONFIGURATION SHOWN ON COMPONENTS & SPECIFICATIONS SHEET `SE'� I IC PROJECT STASH TEA COMPANY FOR NWHS MATERIAL HANDLING ENGINEERING SHEET NO. 4 TEL : (909)869 - 0989 FAX : (909)869 - 0981 CALCULATED BY RF 161 ATLANTIC STREET. POMONA. CA 91768 DATE 5/19/2005 COMPONENTS & SPECIFICATIONS : TYPE 1 N W2 - — Y1 = in LEVELS = 2 H1 =66 in. N WI =1400 lbs H2 = 106 a W2 =1400 lbs. Y2 = 52 in PANELS = 3 Y3 = 74 in Y LIVE LOAD = 1 400 lbs. H2 FRAME TIEIGHT = 192 in. H N W 1 H Y2 FRAME DEPTH = 44 in. BEAM LENGTH= 96 in. H1 SITE CLASS = lI Y1 ;` /J / J . MANUFACTURER= 3' T ERL kiNd. 1. 1 l- D - COLUMN BEAM @ Level I CONNECTOR @ Level 1 OK OK OK Intik LU75 /3x3x13ga Intik 485/4.04 "deepx2.75 "x0.07" TWO PIN CONNECTOR Steel = 55000 psi Steel = 55000 psi Stress = 30% Stress =13% Max Static Capacity = 4949 lb. Stress = 28% COLUMN BACKER BEAM @ Level 2+ CONNECTOR @ Level 2+ OK OK Intik485 /4.04 "deepx2.75 "x0.07" TWO PIN CONNECTOR None Max Static Capacity = 4949 lb. Stress = 21 Stress = Stress = 28% BRACING SLAB & SOIL HORIZONTAL OK DIAGONAL OK Slab = 5" X 2500 psi OK Soil Bearing Pressure = 1000 psf Intlk 1 -1/2 X 1 - 1/2 X 14ga Intlk I -1/2 X 1 -1/2 X 14ga Slab Puncture Stress = 16% Stress = 3% Stress = 10% Slab Bending. Stress = 5% BASE PLATE ANCHORS OK RAMSET TRUBOLT(ICBO #1372) 0.5 Dia. X 2.25 Min. E OK 7.75 in X 5 in X 0.375 in Pullout Capacity = 793 lbs. Steel = 36000 psi Shear Capacity = 1586 lbs. MBase = 2890 in. lb. No. Of Anchors = 2 per Base Plate Stress = 28% Anchor Stress = I% NOTES: DESIGNED PER 2003 IBC WITH OREGON STATE AMENDMENTS SEIZMIC PROJECT STASH TEA COMPANY FOR NWHS MATERIAL HANDLING ENGINEERING SHEET NO. 5 TEL : (909)869 - 0989 FAX : (909)869 - 0981 CALCULATED BY RF 161 ATLANTIC STREET. POMONA. CA 91768 DATE 5/19/2005 COMPONENTS & SPECIFICATIONS : TYPE 2 `. N. - - LEVELS = 3 HI =66 in \ 3 Wi =1400 lbs. \ Y1 = 52 in H2 =54 in W2 =1400 lbs Y2 = 52 in PANELS = 3 H3 =52 in. W3 =1400 lbs Y3 = 74 in H3 Y3 LIVE LOAD = 1400 lbs. . W 2 .. FRAME HEIGHT = 192 in. H H2 H Y2 FRAME DEPTH = 44 in. BEAM LENGTH= 96 in. W 1 .` // SITE CLASS = 11 Hl Y1 ! f i /' MANUFACTURER= eN I• 1- -I, D J. COLUMN BEAM @ Level 1 CONNECTOR @ Level I OK OK OK Intik LU75 /3x3x13ga Intik 485/4.04 "deepx2.75 "x0.07" TWO PIN CONNECTOR Steel = 55000 psi Steel = 55000 psi Stress = 33% Stress =19% Max Static Capacity = 4949 lb. Stress = 28% COLUMN BACKER BEAM @, Level 2+ CONNECTOR @, Level 2+ OK OK Intlk 485 /4.04 "deepx2.75 "x0.07" TWO PIN CONNECTOR None Max Static Capacity = 4949 lb. Stress = 24% Stress = Stress = 28% BRACING SLAB & SOIL HORIZONTAL OK DIAGONAL OK Slab = 5" X 2500 psi OK Soil Bearing Pressure = 1000 psf Intlk 1 - 1/2 X 1 - 1/2 X 14ga Intik 1 -1/2 X 1 - 1/2 X 14ga Slab Puncture Stress = 24% Stress = 5% Stress = 1:3% Slab Bending Stress = 13% BASE PLATE ANCHORS OK RAMSET TRUBOLT(ICBO #1372) 0.5 Dia. X 2.25 Min. E OK 7.75 in X 5 in X 0.375 in Pullout Capacity = 793 lbs. Steel = 36000 psi Shear Capacity = 1586 lbs. MBase = 4334 in. lb. No. Of Anchors = 2 per Base Plate Stress = 42% Anchor Stress = 2% NOTES: DESIGNED PER 2003 IBC W/ OREGON STATE AMENDMENTS • SEI PROJECT STASH TEA COMPANY INC. FOR NWHS SHEET NO. 6 MATERIAL HANDLING ENGINEERING CALCULATED BY RF TEL: (909) 869 -0989 • FAX: (909) 869 -0981 DATE 5/19/2005 161 ATLANTIC AVENUE • POMONA, CA 91768 LOADS & DISTRIBUTION: • LIVE LOAD PER SHELF (BASED ON CLIENT SUPPLIED DATA) = wLL DEAD LOAD PER SHELF = wDL SEISMIC BASE SHEAR DETERMINED IN ACCORDANCE WITH SECTION 2208 OF THE 2003 IBC W /OREGON AMENDMENTS . WHERE: V= (2.5xCa) /RxlpxWtotal Wtotal = (0.67 *wLL /1 + wDL) Ca = 0.302 <-------- Sp per section 9.14.6.3.1 ASCE 7 -02 Ip = 1.00 < In area of nopublic access SOILTYPE. = D R (LONGITUDINAL) = 6 R (TRANSVERSE) = 4 wDL = 70 LB n= 1 DEPTH= 44 in LONGITUDINAL DIRECTION: Vlong = [2 5 *0.302 *(0.67 4200/1 +210)/61` 1/1.4 = 271 lb Fi = V Whi /DWh TRANSVERSE DIRECTION: Vtrans = [2.5 *0.302 *(0.67* 4200/1 +210) /4) * 1/1 4 = 406 lb Fi = V Whi /ZWh SEISMIC DISTRIBUTION: LEVEL h WEIGHT HEIGHT W X H Fi (long) Fi (trans) Mot IN LB IN LB -IN LB LB IN -LB 1 66.0 1,400 66.0 92,400 49.9 74 8 4,937.8 2 54.0 1,400 120.0 168.000 90.7 136.0 16 323.2 3 52 0 1,400 172 0 240,800 130.0 195.0 33,535 1 I 172 IN I = 501,200 271 LB 406 LB 54.796 IN -LB TOTAL FRAME LOAD = 4410 LB S 1 PROJECT STASH TEA COMPANY FOR NWHS MATERIAL HANDLING ENGINEERING SHEET NO. 7 TEL : (909)869 - 0989 FAX : (909)869 - 0981 CALCULATED BY RF 161 ATLANTIC STREET, POMONA, CA 91768 DATE 5/19/2005 LONGITUDINAL ANALYSIS THE ANALYSIS IS BASED ON THE PORTAL METHOD, WITH THE POINT OF CONTRA FLEXURE OF THE COLUMNS ASSUMED AT MID - HEIGHT BETWEEN BEAMS, EXCEPT FOR THE LOWEST PORTION, WHERE THE BASE PLATE PROVIDES ONLY PARTIAL FIXITY, THE CONTRA FLEXURE IS ASSUMED TO OCCUR CLOSER TO THE BASE. (OR AT THE BASE FOR PINNED CONDITION, WHERE THE BASE PLATE CANNOT CARRY MOMENT). Mupper + Mower = Mconn' R' +Mconn' L' " Fn Mconn' R' = Mconn' L' M5 -5 AllhI5 Mconn • 2 = Mupper + Mower M4-4 AMIN/ Mconn = Mupper 2 Mlower + 2000in. / lb. M3. am i M2 - Hong Vcol = 7 = 135 lbs MI -1 ri V M base Mbase = 4334 in /lb FRONT ELEVATION LEVELS h f AXIAL LOAD MOMENT Mconn 1 64 25 2.205 4,306 5.102 2 54 46 1,470 2,970 3.781 3 52 65 735 1,664 2,296 SAMPLE CALC. M = (Vcol • 4)— Mbase = (135 lbs X 64 in) - 4334 in/lb = 4,306 in /lb PROJECT STASH TEA COMPANY FOR NWHS MATERIAL HANDLING ENGINEERING SHEET NO. 8 TEL : (909)869 - 0989 FAX : (909)869 - 0981 CALCULATED BY RF 161 ATLANTIC STREET, POMONA, CA 91768 DATE 5/19/2005 COLUMN ANALYSIS P = 2205 lbs M = 4306 in /lb K • L, = 1.2 X 64in / 1.3196in Rx = 58 —Max = 58.2 K • Ly = I X 52in / 1.08in R , = 48.1 Axial U2E _ (( = 86 KSI F� l l/ i rMax A al F'' = 28 KSI Since : F > F /2 B F \ = 55 KSI X [1 - 55 KSI / (4 X 85.95738KS1)] F „ =F 1— 4.F, j = 46.2 KS! —` —'- Pn = Aeff • F = 0.757 in ^2 X 46.2 KSI = 34975 lbs SECTION PROPERTIES Qc = 34975 lbs / 1.92 = 18216 lbs A : 3 in P B : 3 in = 0.12 C : 1 ' a t : 0.09 in Flexure Aeff • 0.757 in'” P P C • M Ix : 1.32 in ^4 Since: — <0.15 Ch eck: — + 5 1.33 Sx : 0.879in P P Max • u� R x : 1.3196 in Myeild = M = S„ • F = 0.879 1n ^3 X 55000 PSI = 48345 in /lb Iy : 0.871 inA4 S� : 0.574 in ^3 �j Ry : 1.08 in Max = = 48345 / 1.67 = 28949 in /lb Kx : 1.2 Pf Lx : 64 in UI2EI Ky :l Pcr = = (3.14159) ^2 X 29500 KSI / (76.8in.) ^2 = 65159 Jibs Ly : 52 in (Kl)Max` , Fy : 55 KSI E : 29500 KSI 1 � = P = (1 1(1 - (1.92 X 2205 lb / 65159 1b))) ^ -1 = 0.94 Qc : 1.92 11 — S2c Qf 1.67 Pcr Cmx : 0.85 Cb : 1 (2205 lb / 18216 lb) + (4306 in/lb / 28949 in/lb) = 0.26 < 1.33 (19 %) sEiZMIC .00."°'° PROJECT STASH TEA COMPANY FOR NWHS MATERIAL HANDLING ENGINEERING SHEET NO. 9 TEL . (909)869 - 0989 FAX : (909)869 - 0981 CALCULATED BY RF 161 ATLANTIC STREET, POMONA, CA 91768 DATE 5/19/2005 BEAM ANALYSIS BEAM TO COLUMN CONNECTIONS PROVIDE ADEQUATE MOMENT CAPACITY TO STABLIZE THE SYSTEM, ALTHOUGH IT DOES NOT PROVIDE FULL FIXITY. THUS, THE BEAMS WILL BE ANALYSED ASSUMING PARTIAL END FIXITY. FOR THE COMPUTATION OF BEAM TO COLUMN MOMENT CAPACITY, THE PARTIAL END FIXITY MOMENT OF THE BEAM WILL BE ADDED TO THE LONGITUDINAL FRAME MOMENT FOR THE ANALYSIS OF THE EFFECTIVE MOMENT FOR PARTIALLY FIXED BEAM For a simply supported beam, the max moment at the center is given by WL 2 /8 . An assumption of partial fixity will decrease this maximum moment by the following method. Percentage of End Fixity = 25% 0 = 0.25 Mcenter(simple) MCenter = MCenter(Simple ends) - 0 *MCenter(Fixed ends) Mends M center (fixed) (fixed) u ' /8 — • WI 2 112) , 0.104.W/ 4411 l e1111111111111qh,... Reduction Coefficient 13 = 0.104/0.125 = 0.833 IrArMIMMOM immilikt 111 („ „„c, = Q•r4'118 =0.833 • WW 2 /8 _max 0 • MAJJV (FixedEnds) = 112 0.25 H = 0.0208 • TV / TYPICAL BEAM FRONT VIEW EFFECTIVE DEFLECTION FOR PARTIALLY FIXED BEAM For a simply supported beam. the max deflection at the center is given byswt'/:384 El An assumption of partial fixity will decrease this maximum deflection by the following method. SWI �erw. = , 384•E LiveLoad / 1v1 = 1400 lbs DeadLoad / lvl ,41b/ft X 2 X (96/12) = 64 lbs MCenter 0.104* w/2 =7320 in/lb M Ends — 0.0208* W/ = 1464 in/lb F = 0.6 • F = 33000 PSI FB Eff = 33000 PSI . , [r SEIZIVIIC ®.' PROJECT STASH TEA COMPANY FOR NWHS MATERIAL HANDLING ENGINEERING SHEET NO. 10 TEL : (909)869 - 0989 FAX : (909)869 - 0981 CALCULATED BY RE 161 ATLANTIC STREET, POMONA, CA 91768 DATE 5/19/2005 BEAM ANALYSIS 24 � MAXIMUM STATIC LOAD PER LEVEL DEPENDS ON: j — 1. MAXIMUM MOMENT CAPACITY i r - - -- 1 1 �� F =M/S, R.( i Ir ;�li wl' /8) `t 1 FB Eff = s FB •16•S 1 Max.Weight / lvl = • a /3•L = ((33000 X 16 X 0.857) / (0.833 X 96)) X 0.875 = 4949 Ibs /lvl i j = 1.842 in ^4 s = 0.857 inA3 2. MAXIMUM ALLOWABLE DEFLECTION ' F =55000 PSI a(impactCoefficient) = 0.875 Aan„H = L /180 = 0.533 In /3 = 0.833 0 = 0.25 5TV4 L(Length) = 96 in L = 96 in A = 384 • j . fi Step = 1.625 in BeamThickness = 0.07 in BeamDepth = 4.04 in 1kIax.Theight 111 = 384 E • I s A . , , Ho. L; TopWidth = 1.75 in Bottom Width = 2.75 in —4B = ((384 X 29000000 X 1.842 X 0.533) / (5 - (4 X 0.25))) X 96 ^3 = 6183 Ibs /Ivl MAXIMUM ALLOWABLE LIVE LOAD PER LEVEL = 49491bs/Ivl BeamSnress = 28% ALLOWABLE AND ACTUAL BENDING MOMENT AT EACH LEVEL M , = TV 2 /8 M ; = S * F M Allow.Sernnc = S * F * 1.3 hmu� .Ilou�.Srmrc x h MLmacr — Msrauc *1.125 M Seisnnc = M Conn Level M Stauc M Impact M Alloy, .Static M Scrsmic M AlloW.SeIsnuc Result 1 7320 8235 28281 5102 37708 GOOD 2 7320 8235 28281 3781 37708 GOOD 3 7320 8235 28281 2296 37708 GOOD ` SE ' ZM PROJECT _STASH TEA COMPANY FOR NWHS MATERIAL HANDLING ENGINEERING SHEET NO. 11 TEL : (909)869 - 0989 FAX : (909)869 - 0981 CALCULATED BY RF 161 ATLANTIC STREET, POMONA, CA 91768 DATE 5/19/2005 BEAM TO COLUMN ANALYSIS CONNECTION CAPACITY DEPENDS ON THE FOLLOWING PARAMETERS: 1. SHEAR CAPACITY OF PIN PinDiameter = 0.438In. F = 55000 PSI ` 21 _ ?` = Diameter • 4 = 0.1507 in ^2 Ashear Pshear = 0.4 • F y • A Shear = 0.4 X 55000 X 0.1507 in^ = 3315 lbs 2. BEARING CAPACITY OF PIN ColumnThickness = 0.09 F„ = 65000PS/ Q =2.22 a -7 Ppear,ng = a F Dia. • Col .Thickness = 2.22 X 65000 X 0.438 X 0.09 / 122 = 2562 lbs 3. MOMENT CAPACITY OF BRACKET EdgeDist . = 1.0 In. PinSpacing = 4 In F, = 55000 PSI C P +P = P + PP/ 4.5) = P1X1.11 T n , j , = 0 In. Su. ,p =0.127 M capac,n. = S chp • F Bending = 0.127 In ^3 X .66 X Fy = 4610 in -lb C • d = M capae,n = 1.11 P, • d 3 ., d = EdgeDist /2 = 0.5 t =7 ?= Pchp = Mcapacn /( 1.11 . d) = 4610 / (1.11 X 0.5) = 8306 lbs \ MINIMUM VALUE OF P1 GOVERNS .� 1 -5R" - 71' P = 2562 lbs 111 Conn-Allow = [P *4.5] +[P *(.5/4.5 *.5] *1.33 = 15523in -lb OK '� EIZM IC PROJECT STASH TEA COMPANY _ FOR NWHS MATERIAL HANDLING ENGINEERING SHEET NO. 12 TEL : (909)869 - 0989 FAX : (909)869 - 0981 CALCULATED BY RF 161 ATLANTIC STREET, POMONA, CA 91768 DATE 5/19/2005 TRANSVERSE ANALYSIS: BRACING IT IS ASSUMED THAT THE LOWER PANEL RESISTS THE FRAME SHEAR IN TENSION AND COMPRESSION. IF HORIZONTAL AND DIAGONAL MEMBERS ARE THE SAME, ANALYSIS WILL BE DONE ON THE DIAGONAL MEMBER AS IT WILL GOVERN. DIAGONAL BRACING : COMPRESSION MEMBER Ldiag= \(L- 6)2 +(D— (2• BCo1))2 = 59.7" y D --,. I v = Vtrans LDiag Vdiag = d = 638 lbs Pmau k • l (1 X 59.6657) / (0.488) = 122.3 In rMin '� II c ' = = 19146.4 PSI k•l' /77V/in SIDE ELEVATION = 27500 7 Panel Height (L) = 52 In F F < Panel Depth (D) = 44 In Column Depth (B) = 3 In = F, = 19146.4 PSI Clear Depth (d) = (D - 2 *B) = 38 P„ = A rea • F„ = 6031 Ibs Qc =1.92 F = � � = 3141 1bs VDiag Brace Stress = = 0.20 < 1.33 (15 %) Pa SE�Z�OC' PROJECT STASH TEA COMPANY FOR NWHS MATERIAL HANDLING ENGINEERING SHEET NO. 13 TEL : (909)869 - 0989 FAX : (909)869 - 0981 CALCULATED BY RF 161 ATLANTIC STREET, POMONA, CA 91768 DATE 5/19/2005 OVERTURNING ANALYSIS FULLY LOADED Total Shear = 406 lbs W Mav, = 'trans • Ht • 1.15 � F r M r = 406 X 135 X 1.15 = 63032 in/lb � M = (w + .85wDL) F 6 d/2 v M = (4200±(.85 X 210)) X 44/2 = 96327 in /lb PIMP" F 6 1 (M — M ) = (63032 - 96327) / 44 1111 l P p L, n " = -757 lbs. Puplift <= 0 No Up Lift In F4 TOP SHELF LOADED F , Shear = 103 lbs M M ,,, = i t�, • Hi • 1. F 2 011 Mori = 103 X 172 X 1.15 = 20354 in /lb { Fl r = (w +wDL)• /2 c• . • •.:ti M = (1400 + (.85 X 210)) X 44 /2 = 34727 in /lb L, sr P Uplift P _ 1(M„17 — M„ } = (20=54 34727)144 CROSS AISLE ELEVATION u /SL,rir , a = -327 lbs. Puplift<=0 No up Lift ANCHORS No. ofAnchors : 2 Pull Out Capacity : 793 Lbs. Shear Capacity : 1586 Lbs. COMBINED STRESS Fully Loaded = (0 / 793 X 2))+ ((406 /2)1(1586 X 2)) = 0.01 Top Shelf Loaded = (0 / (793 X 2))+ ((103 /2)/(1586 X 2)) = 0 USE 2 RAMSET TRUBOLT(ICBO #1372) 0.5 Dia. X 2.25 Min. Embd. Anchors per BasePlate. SEI PROJECT STASH TEA COMPANY FOR NWHS MATERIAL HANDLING ENGINEERING SHEET NO. 14 TEL : (909)869 - 0989 FAX : (909)869 - 0981 CALCULATED BY RF 161 ATLANTIC STREET, POMONA, CA 91768 DATE 5/19/2005 BASE PLATE ANALYSIS THE BASE PLATE WILL BE ANALYZED WITH THE RECTANGULAR STRESS RESULTING FROM THE VERTICAL LOAD P, COMBINED WITH THE TRIANGULAR STRESSES RESULTING FROM THE MOMENT Mb (IF ANY). THERE ARE 3 CRITERIA IN DETERMINING Mb. THEY ARE 1. MOMENT CAPACITY OF THE BASE PLATE, 2. MOMENT CAPACITY OF THE ANCHOR BOLTS, AND 3. Vcol *h/2 (FULL FIXITY). Mb IS THAT SMALLEST VALUE OBTAINED FROM THE 3 CRITERIA ABOVE. Pcol = 2205 lbs Base Plate Width (B) = 7.75 i b = 3 in Mbase = 4334 in /lb Base Plate Depth (D) = 5 in bl = 2.375 in Base Plate Thickness (t) = 0.375 in Fv (base) = 36000 PSI P = P Ca/ = 56.9 PSI A D•B M fh = 86.6 PSI D•B 2 b, .42 = B f = 53.07 PSI b1 J b 1 b1 fns = .1;> — .fn 6 ? = 33.52 PSI �` � ' Mh = �� = � .f, +f1 + .67fb, • ta Mh = 354.8 in/lb 1 ' Skase = = 0.02 in /cb :1 1 _ 6 �,.. 360 00 PSI ' Fbase = .75F I .33 - fi = 0.42 <= 1 OK fb Fb S Base F Bate ANCHOR TENSION Pco Dp-•.= No. of Anchors Resisting Tension (n) = 1 nn Mo x o T • d, = MBase - (Pc„ • (b l 2)) T = M Base P Coi ' b = 0 T Danchor 4 d, n • d2 NEGATIVE, THEREFORE NO TENSION ^ , S14/ PROJECT STASH TEA COMPANY FOR NWHS MATERIAL HANDLING ENGINEERING SHEET NO. 15 TEL : (909)869 - 0989 FAX : (909)869 - 0981 CALCULATED BY RF 161 ATLANTIC STREET, POMONA. CA 91768 DATE 5/19/2005 SLAB AND SOIL THE SLAB WILL BE CHECKED FOR PUNCTURE STRESS. IF NO PUNCTURE OCCURS, IT WILL BE ASSUMED TO DISTRIBUTE THE LOAD OVER A LARGER AREA OF SOIL AND WILL ACT AS A FOOTING. PUNCTURE Psrar,c = 2205 lbs Mor = 63031.5 in -lb p P = (12 P +1.0 • (M l d)) = 4222 lbs J = 100 PSI F pund = 2. fr C A prn,cr = B + —t + W +— • 2.t = 177.5 sq. in. � 2 J t In(1 = 0.24 b F A pt,n , • F p,n,Cr SLAB TENSION I L A _ P,„,. • 1 44 ,o,1 — = { 457 sq. in. FOOTING 1.33- B = 7.75 in L =Asa, = 21.38 in N/ = 5 in B = B • W +I = 11.22 in Frame Depth d = 44 in b — L — B = 5.08 in CONCRETE fc = 2500 PSI M = 14'b, _ 1.33 f sott ' b ' = 119 in-lb Onc 2 144.2 t = 5 in 1•t Scone = 6 = 4.17 cb. in. 0 = 0.65 ,/ ./'' SOIL Font = 5 0 If = 162.5 PSI fb = MConc fsoil = 1000 PSF = 0.13 Fb S Conc F Conc OK