Loading...
Report Jun 13 2007 1:55PM David Green Construction, +1 503 848 7018 p.3 ._. c, Rerc' ivri Fax Air 22 2007 I :361'hi ' a :;tA ion . D ji l Green Cori:a.ru:'l lord . L'I:.0 ' FROM : DM-Thompson PHONE NO. : 5032933811 Apr. 22 2007 01 :54Pt1 P2 6Uf ,, // 3 /2 4 701 4AI 4,0 " i MOO ro0 D. M. THOMPSON, INC. 1080 SW Westwood Drive Engineer /Construction Management Portland Oregon 97239 (503) 293 -3811 April 19, 2007 David Green Construction 29100 SW Burkhalter Rd. Hillsboro, OR 97123 Re: Office addition for Super Floors Tigard, OR Subject: Onsite inspection of framing and plan modifications Mr. David Green: On April 17, 2007, we visited the referenced construction site in order to examine certain framing and construction modifications that vary from the original design drawings. These changes are addressed below: 1. The bottom flight of the new stair to the second level has been fastened to the concrete floor with powder driven pins in lieu of wedge anchors that are detailed. This method of anchorage is an acceptable installation, since the stair is completely supported by walls on both sides. 2. Upper floor walls have not been constructed to the roof structure as detailed. The addition of 2x6 bracing at —45 angles from the top, wall plates to the sides of the existing roof beams /puxlins will be necessary to support the wall in both directions. Connect the braces to the top of the wall with Simpson LS70 at each brace end. ..m..iL> 3. The new glue - laminated beam at the edge of the new second floor has been connected to the existing steel column as originally detailed. The support of this beam has been changed so that it is completely supported on new columns and footings and the welded connection at the steel column is now redundant, No special welding inspection or approval are necessary for this connection, Please call us if there are any questions or conditions that we have not addressed. Inspection and report by; f 1 ''I+ Duane M. Thompson, PE Oregon # 62.11 r1� � . TO 06/13/07 WED 09:56 FAX 503 670 9147 CARLSON TESTING el 002 .1 Carlson Testing, • uJrm saran OR 0 cdO2 OF rr „, v Ylfnn:IRCr OX JU60 HrrJarurO 4'[ n30_'S l7ARrlrJ ltd rll rr;mtl nr,+r Std. OR 97<rrr Aau.! Olt UI Iewo tyk963.1.34,,4 (`I r0J/ qv, I••: Plunrx 041) LW MS Construction Ma teri�J1s resting & Inspection a (0.1169.1 -77 Fu. l: rk, •,7W IrnC U9(63 b uPo2o60 7— oo �l Special Inspection (D) FINAL SUMMARY LETTER 70 SV ' t June 12, 2007 T0704'117 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Superfloors Warehouse — Tenant Improvement 7244 SW Durham Road — Tigard, OR (f a b 0 Permit No.: BUP2007 -00113 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Steven Leach Project Manager SW L /tm cc: David Green Construction — David Green Richard Logan