Loading...
Report • • ' Inc. Alen ()Q Sdan v ,,..: Bend Of Carlson Testi c 8430 4060 Hudson 5Y, NR 630.5 OR Riley Xd /l Tigard, OR 97223 Salem, OR 97301 Bend OR 97702 Phone: (503) 684 -3460 Phare: (503) 589 -1252 Phase (541) 330 -9155 Far 1503) 684 -0954 Ear: (503) 589 -1309 Far 1541)330-9163 Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER July 14, 2006 T0601169B City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Building Department Re: Bella Vista Subdivision- Lot 16 12755 SW Da Vinci Lane- Tigard, OR Permit# MST2005 -0316 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Pull Testing on Installed Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfu submitted, CARLS/'� TESTING, INC. Ja FA: . Hietpas Ic C aerations Manager 4 FH /ks c: Reese General Contractors Inc — Arnold Reese CSA Consulting Engineers McNaughton Associates INc