Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report
MAY -01 -2006 MON 03:26 PM C,ARLSON TESTING INC. FAX NO. 5036840954 P. 03 Main Office S alem Office Bend Office P.O. Bax 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Phone (503) 684-3460 Phone (503) 589 -1252 Phone (541) 330 -9155 Carlson Testing, 1� C • FAX (503) 684.0954 FAX (503) 589 1809 FAX (541) 330-9163 Special Inspection FINAL SUMMARY LETTER May 1, 2006 T0509482B City of Tigard 13125 SW Hall Blvd., Tigard, OR 972238199 Attn: Building Department Re: Bella Vista- Lot 11 12888 SW DaVinci Court- Tigard, OR Permit# MST2005 -00304 P Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Pull Testing on Adhesive. Anchors 1 All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If the e are any further questions regarding this matter, please do not hesitate to contact this office. Re i % ear ully submitted, CA" LSON TESTING, INC. : es F. Hietpas i • s eratlons Manager - H /ks : Riverside Homes Inc- Robert Harp JRR Engineering Inc McNaughton Associates Inc /fiS. zeres- 0 y Nov 3. 2005 3:16PM /a gag y V � - S�f' No. 048 P, fligi c ering.liiL'. Rea! World 4eotechnical Solutions Investigation • Design • Construction Support November 2, 2005 Project No O2 -7801 Attention: Rob Harp Riverside Homes, Inc. 1926 $W ArnberGien Parkway, Ste 200 Beaverton, OR 91006 Fax 503.969 -9165 RE: SOIL ENGINEER'S REVIEW OP FOUNDATION EXCAVATION SUBGRADE LOT 11 BELLA VISTA TIGARD, OREGON References: 1. GeoPit ifIc Engineering fnc , O otectrnioal Report, 8 Vista, Tigard, Oregon, doled Oeoembsr 9. 200. Z. GeoPacific Engineering inc., Roil and Wag Engineer's Summary at f oncfuaion of Earthwork, Beila Vista, Tigard Oregon, June 15, 2005, GeoPacific Engineer, Jim trebris, visited the site to review the foundation excavation subgrade. The observed fill soil is compact silty clay with rocks. Some mucking may be required if the subgrade is Left exposed to wet weather for a long duration, however the current subgrade is considered adequate with only 34 inch of muck. Based on our observations, it is our opinion that the current foundation subgrede is suitable for spread foundation support to a maximum allowable bearing pressure of 1,500 psf. Minimum reinforcement has been recommended In the above Reference 2. Setbacks on adjoining rockery wails are not necessary because they to not parallel one another_ Our work scope pertains to a geotechnicai engineer's foundation excavation review only and the conditions existing and exposed at the time of our site vle(t. No deck footing, patio, or other appurtenant structure subgrades were observed. Our work was performed to the current local standards of practice. No other warranty is herein expressed or Implied. if you have any questions, please call. Sincerely, GooPecific Engineering, Inc. C.4 PRt1c4. ocoNEE /q 14743 T r Jr: OREGON James!). Imbrie, P,E., A; w?3� OP o- 's 7 Gootechnical Engineer •/4 ,� S ©. Vea idN g g Z0 39 d ONI S3WOH 3QISel3AIel ' 99I6896805 85 :9t 500Z /ZZ /Zt