Loading...
Correspondence (5) City of Tigard, Oregon • 13125 SW Hall Blvd. • Tigard, OR 97223 t,: ,e U1 ' ti November 22, 2006 • gin` 4 ;yu btt O rai , 4 r i l N ti# ` fiIGA RD Firestop Co. Bruce Pearson PO Box 230545 Tigard, OR 97281 RE: FIRE SPRINKLER SYS'IEM - REVIEW Project Information Building Permit: BUP2006 -00544 Construction Type: 5B Tenant Name: Ballroom Dance Co. Occupancy Type: A3 Address: 8900 SW Commercial St. Occupant Load: 1,200 +/- Stories: 1 + 3 Mezzanines Area: 13,734 sq ft Hazard: Light The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition, Oregon Fire Code 2004 edition; and NFPA 13. The submitted plans are approved subject to the following. TESTING: - NFPA 13 sec 16.2.1 Hydrostatic testing of the system shall occur at sprinkler final. The contractor's material and test certificate required by NFPA 13, 16.1 shall be completed and signed by both the installer and building owner. 1. Unless permitted by 16.2.1.2 through 16.2.1.6, all piping and attached appurtenances subjected to system working pressure shall be hydrostatically tested at 200 psi (13.8 bar) and shall maintain that pressure without loss for 2 hours. Loss shall be determined by a drop in gauge pressure or visual leakage. The test pressure shall be read from a gauge located at the low elevation point of the system or portion being tested. 2. A hydraulic calc plate shall be affixed to the sprinkler riser.16.5 WATERFLOWALARMS: - OSSC 903.4, NFPA sec 6.9.1 3. Water flow alarm apparatus shall be listed for the service and so constructed and installed that any flow of water from a sprinkler system equal to or greater than that from a single automatic sprinkler of the smallest orifice size installed on the system will result in an audible alarm on the premises within 5 minutes after such flow begins and until such flow stops. An audible water flow alarm is required on the exterior of the building and in the interior of the building in a normally occupied location to alert the occupants. OSSC 903.4.2 Phone: 503.639.4171 • Fax: 503.684.7297 • www.tigard- or.gov • TTY Relay: 503.684.2772 SPRINKLER SYSTEM MONITORING: OSSC 901.6. - NFPA 13 sec 8.16 4. All valves controlling the water supply for automatic sprinkler systems and water -flow switches on all sprinkler systems shall be electrically monitored where the number of sprinklers are more than 20. HANGERS: NFPA 13 sec. 9.2 5. The maximum distance between hangers shall not exceed that specified in Table 9 -2.2. The unsupported length between the end sprinkler and the last hanger on the line shall not be greater than 36 inches for 1" pipe, 48inches for 1 1/4" pipe and 60 inches for 1 1 /2" pipe. The last length of pipe at the end of a feed or cross main shall be provided with a lateral brace per section 9.3.5.3. 6. The maximum distance between hangers for listed nonmetallic pipe shall be modified as specified in the individual product listings. SWAY BRACING: - NFPA 13 sec 9.3.5 - 9.3.5.8 7. The system piping shall be braced to resist both lateral and longitudinal horizontal seismic loads and to prevent vertical motion resulting from seismic loads. The structural components to which bracing is attached shall be determined to be capable of carrying the added applied seismic loads. Sway braces shall be designed to withstand forces in tension and compression. Bracing shall be attached directly to feed and cross mains. 8. For feed and cross mains, longitudinal sway bracing shall be spaced a maximum of 80 ft. Later -al sway bracing shall be spaced a maximum of 40 ft. A length of pipe shall not be braced to sections of the building that will move differentially. RESTRAINT OF BRANCH LINES. - NFPA 13 sec 9.3.6 9. Restraint is considered a lesser degree of resisting loads than bracing and shall be provided by use of one of the following: (1)A listed sway brace assembly (2)A wraparound U -hook satisfying the requirements of 6- 4.5.3, Exception Number 3 (3)No. 12, 440 -lb (200 -kg) wire installed at least 45 degrees from the vertical plane and anchored on both sides of the pipe (4)Other approved means 10. Wire used for restraint shall be located within 2 ft of a hanger. The hanger closest to a wire restraint shall be of a type that resists upward movement of a branch line. The end sprinkler on a line shall be restrained against excessive vertical and lateral movement. Where upward or lateral movement would result in an impact against the building structure, equipment, or finish materials, branch lines shall be restrained at intervals not exceeding 30 ft 11. The unsupported length between the end sprinkler and the last hanger on the line shall not be greater than 36 inches for 1" pipe, 48inches for 1 1/4" pipe and 60 inches for 1 ' /z" pipe. - 9.2.3.4 12. The last length of pipe at the end of a feed or cross main shall be provided with a lateral brace per Section 9.3.5.3.4 PIPING CLEARANCE :: - NFPA 13 sec 9.3.4 13. Where pipe passes through holes in platforms, foundations, walls, or floors, the holes shall be sized such that the diameter of the holes is 2" larger than the pipe for 1" nominal to 3 1 /2" nominal and 4" larger than the pipe for pipe 4" nominal and larger. Clearance from structural members not penetrated or used, collectively or independently, to support the piping shall be at least 2 ". Exceptions Where clearance is provided by a pipe sleeve, a nominal diameter 2" larger than the nominal diameter of the pipe is acceptable for pipe sizes 1" through 3 1 /2 and the clearance provided by apipe sleeve of nominal diameter 4" larger than the nominal diameter of the pipe is acceptable for pOe sizes 4" and larger. No clearance is necessary for pOing passing through gypsum board or equally frangible construction that is not required to have a fire resistance rating. No clearance is necessary if flexible coup are located within 1 ft of each side of a wall, floor, platform, or foundation. SPARE SPRINKLERS: - NFPA 13 sec 6.2.9 14. The stock of spare sprinklers shall include all types and ratings installed and shall be as follows: a. For systems having less than 300 sprinklers, not fewer than six sprinklers SYSTEM, MAIN DRAINS, or SECTIONAL DRAINS: - NFPA 13 sec 8.15.2.4 15. Provisions shall be made to properly drain all parts of the system. Drains shall discharge either to the outside or to a drain connection. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.3.1 OSSC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, c:5 Val Henzel, Senior Plans Examiner • Nicoll Engineering, Inc. PO Box 23784 Tigard, Oregon 97281 • Phone: (503) 620 -2086 • Fax: (503) 684 -3636 November 3, 2006 NEI# 06 -0313 Ballroom LLC c/o Sellwood Trade Center APPROVED PLANS 7122 SE Milwaukie Avenue INCLUDE UN ATT Ac IItl Portland, OR 97202 SP`ciFICATK5N BOOK ,..._: 1 CAL( S Attn: Jim Page = Misc DOCUMENR s Re: Ballroom Dance Studio, 8900 Commercial Street, Tigard, OR Fire Sprinkler System Shop Drawing Review Reference: Drawing prepared by Nicoli Engineering, Inc., dated August 25, 2006, Job No. 06 -0613 City of Tigard Permit No. BUB2006 -00204 Gentlemen: As requested, we have reviewed the submitted shop drawings for the fire sprinkler system as prepared by Firestop Co. and dated October 30, 2006. We have reviewed the sprinkler system with respect to the areas designed by Nicoli Engineering, Inc.: Tenant Improvements for Ballrooms A, B, & C. Our review indicates that this sprinkler system for the area designated above would be considered to generally conform to the plans that were prepared by this firm. It should be realized that no holes will be allowed to be drilled in any of the beams designated for this project unless prior approval is obtained from Nicoli Engineering, Inc. Any holes placed in the TJI floor joist must be in strict conformance with the requirements of Truss Joist. The Fire Sprinkler System shall be installed per 903.2.1.3, 903.3.11 & NFPA 13. LIMITATIONS: It should be realized that no warranties or guarantees are either expressed or implied as to the performance of this building in as much as Nicoli Engineering, Inc. did not complete any design or inspection services during the construction of the existing structure. Further, the support of the sprinkler system by the existing structure is not part of this review and is beyond the scope of work designed by Nicoli Engineering, Inc. X:U-060313 Ballroon Dance Studio for Jim Page's Daughter\Letters \Letter Re Fire Sprinkler System to Jim Page 110306.doc Page 1 of 2 9025 SW Center Street Tigard, OR 97223 — www.nicoliengineering.com L. If you have any further questions regarding this matter please do not hesitate to contact this office at your earliest convenience. Sincerely, %sp PRpF. S " 1 G I 1 .17 ' � / 414 44 .01 ,i 18, 1 y' G� / \ N E.N. � p d I b7 Ketchum, P.E. ENK:dhl enc cc: Firestop Company — Bruce Pearson Robert Gray Partners, Inc. — David Hoff • X:U-060313 Ballroon Dance Studio for Jim Page's Daughter\Letters \Letter Re Fire Sprinkler System to Jim Page 110306.doc Page 2 of 2