Loading...
Report (4) -a - 0 fINIC - 3U - U4 I Ut UU; 1 I NH 1, U 1 LGI 2313 NEAlameda Portland. Oregon 97212 (503) 287 -0511, Fax 282 -7671 March 30, 2004 Our ref; 04- 1945.075 Harvey Shore ? p 11 . 1 . ®F TIG ��® 16300 SW Copper Creek Drive Appro�led Portland, Oregon 97224 " q ..... . . . . .. e ?(1 3r only the w p rk as described in: i 1 RE: GEOTECHN1CAL EVALUATION ` ��iMIT NO. .v aoo 77:7.... , See Letter to: Foll w ....... . [ , trach I PORTLAND, ORFOON Date: Job Address: -- -... [ I ' r Br � �- - -- — _ __ 16300 SOUTHWEST COPPER CREEK DRIVE ._., . 2:1 Mr. Shore: � -fw - We are pleased to present the results of our geotechnical evaluation of the subsurface conditions at the settled chimney and corner of your house. The property is located 16300 Southwest Copper Creek Drive, in Portland, Oregon. We have proceeded with our report based on your verbal authorization. We explored the subsurface conditions in the area of the settled chimney and corner of your house. We advanced 2 borings to a depth of 12 1/2 feet using a one inch diameter hand auger. In the two borings we encountered Medium Stiff, Brown Clayey Silt (native). Geotechnical Engineering Conclusions and Recommendations We recommend the settled chimney and house foundations be underpinned to support vertical loads. These and other related points are discussed in more detail in the following paragraphs. Underpinning Design We recommend the settled chimney and house foundations be underpinned with A. B. if Chance helical soil anchors or an equivalent method. The underpinning anchors shall be capable of achieving the embedment depths and capacity limitations presented below. Bearing Material: Medium Stiff Silt Minimum Tip Embedment: 12 ft below base of footing, 1INK - 3U - 1J4 I uC. UU; 16 Hi] r. UL • 2 04- 1945.075 March 30, 2004 Maximum Tip Embedment: footingor as by the geotechnical engineer. Anchor Ultimate Capacity: 40 kips for Anchors Anchor Proof Testing: 100 Percent of Design Load Note: Underpinning anchors shall be installed according to manufacturers published recommendations. Anchor Proof Testing Procedure All of the anchors and should be proof tested. The proof testing shall consist of loading the each anchor in 5 equal increments to 100% of the design load. The 100% load should he held for 10 minutes. If the anchor movement between 1 and 10 minutes is less than 0.1 inches the anchor is acceptable, if the anchor moves more than 0.1 inches the anchor should deepened and retested or abandoned and a new, redesigned, replacement anchor installed. Closure This report has been prepared exclusively for the use of Harvey Shore for specific application to this project. We are available to discuss any questions you may have concerning this report. Sincerely, LW +®P. E ; 41 ,(Y, sf ‘. ®U®G N 3 90 .6N Craig C. LaVielle, P.E., • I IFfiC - JU - U4 I Ur. UU 10 till r. u3 March 30, 2004 3 04- 1945.075 SUMMARY TEST BORING LOGS Depth (ft.) Soil Classification Test Boring No. 1 0.0 — 12.5 Medium Stiff, Brown, Clayey Silt (300 to 400 in -lbs. N =15) Test boring was terminated at a depth of 12.5 feet. Seepage was not encountered. Test Boring No 2 0.0 — 12.5 Medium Stiff, Brown, Clayey Silt (300 to 400 in -lbs. N =15) Test boring was terminated at a depth of 12.5 feet. Seepage was not encountered. 1Ili1( - U4 IU. Ua.10 1111 r. U4 March 30, 2004 4 04- 1945.075 16300 SW Copper Creek Drive Chimney Underpinning: A.B. Chance Helical Anchors Total Axial Load Chimney Weight = 3' deep (15' highx135 unit wt)(3.5'wide) = 21,262 # 2 Helical Anchors at locations shown on sketch = 10,631 4/anchor Install 8" & 10" Helical Anchors Minimum embedment of 12 feet, Load test to 10.6 kips or load required to lift footing which ever is lower. Lock off anchor with a load of 10.6 kips or load required to lift footing which ever is lower after load test. 16300 SW Copper Creek Drive House Underpinning: A.B. Chance Helical Anchors Total Axial Load 15 kips .c/Helical Anchors at locations shown on sketch = 15 # /anchor Install 8" & 10" Helical Anchors Minimum embedment of 12 feet, Load test to 15 kips or load required to lift footing which ever is lower. Lock off anchor with a load of 15 kips or load required to lift footing which ever is lower after load test. + . ' ' • < r p VII i l l l - 1 11 — I (I YORN #'t l 111— iii — iii —iT —T- FOUNDATION BRACKET I• • • li—------ C150 - 006 -lead_ C150 OOpg EXTENSION • C I50 - 0121 CAP M 1INIM fE1`t1B.. EDMENT TO B PROOF LOADING TO TO BE CERTIFIED BY LaVielle Geotechnical 4....\"• ,.- AI EARTH VIP 1" . p_a. ANCHOR DETAIL i - n g c, c c L I LAhdeNpii^►nivtcg Avickors R - P. a' c Et ,, I 2 � 1 TB -2 S r � 1 H ots e i l 3vticl icates pv`oximafe il Loca +iovt of Test Boeivvo Li �� . / \, 1 2' Li I I N ORT1 -- 0 `r8 -2 i Sife PIc rt, T= igt..tNe 2 SW Cop per• C eek De. 16300 SW Copper Gweel< Pr z Po4tiavvcd, Owegovt — ` ltntc - 1K - uw lut ua; in r+ri r, ub a v • Vicinity Map, Figure 1 — 0 :oston Marker s SW Ga -rde St SW/McDonald St i - tr � I \ - 'e I z S - I ` ( —?— 6 Sky — ,- 4rnta - A 4r) t _ - �SW Pie k - 4 v \ SW Murdok $t r� r-J > — 7-1- fi t— �� + 65 M ", ,,< .. jy ..._ 1 Sift .'. - -- \ N � ^ S W _ e St 1- .. -... I a1! fl SL — � - - mr rn�m: . J ari s Resta ant �/ ` �� /� , , sl Y `L , rla il'�1 Su n4 d -- �� r �� ��-- 7- l\ S t� filD�flX ti L,......,7,_, i n 1 IS . ts3co SW copper creek • 1 Portland, OR 97224 • a O - ( 1 z d cn g _ Q -- .- / _ /3 _ ,,_ .. �L � ^ SV R ive od Ln I I =_ 1Fi$c._l l Rd .-S�r/-he; . .. T Qt . - • S'411--- . • . . _ _ 7 - �� _ / J / 3 _SW Peters Rd �� m �� S4'V T Rd �_ _ {P , ,,.e / SW Leveton Dr - a __ — -1------' I �- Lunch Sox I - -_- I. / \ 1-1- -- 0n 02 i 01 00 0 Streets98 Copyrr9ltt 4) 1 R$8 1 887. MrcroboR Co rporaflon and/or Om supphors All rghb reserved. Proase va t our web Sae at Mtp,Umaps expeda com. Page 1