Loading...
Report Dec. 13. 2006 12:29PM No. 8209 P. 1/6 11163 &A a ° r oP i• Engineering. Inc. C � 11 7312 SW Durham Road Portland, Oregon 97224 Tel (503) 598 -8445 • Fax (603) 598 -8705 December 13, 2006 Job Number 06 -9861 ECE1VED V Casa Terra LLC DEC 1 4 2006 9600 SW Oak St. Ste 230 CITY OF TIGARD Portland, OR 97223 BUILDING DIVISION Fax 503 - 452 -8043 RE: SOIL ENGINEER'S DENSITY TESTING SUMMARY CORAL COMMONS TIGARD, OREGON GeoPacific Engineering, Inc. performed on -call testing at the above referenced project for the period from August 15, 20046 through November 30, 2006. Density tests were performed on fills beneath the future buildings, private parking and driveway, Coral street improvement, and sanitary sewer trenches. A summary of our density testing and field reports are attached. Based on our test results, tested areas met the required project . compaction. Our reports pertain to the materials and locations tested/inspected only. We recommend that foundation subgrades be reviewed by a geotechnical consultant for review of bearing conditions prior to pouring concrete foundation pour. We trust this information meets your needs. Sincerely, GeoPacific Engineering, Inc. o PR Ore . ,{ G ra 14 E t.: 4 ►' OREGO N iegr '4/,7 7 D. 1M ' EXPIRES: 06 -30 -20 07 • James D. lmbrie, P.E., C.E.G. Geotechnical Engineer Attachments: Field Soil inspection Summary Summary of Field Soil Density Tests Summary of Field Asphaltic Concrete Density Tests Dec 13. 2006F.12:29PMDensityTests No. $209 Yap, 2/6 Summary of Field Soil Density Tests Project: Coral Commons Job number: OR 06 -9861 Client: Casa Terra LLC Summary Codtne and Explanation Date Test Elev C.F, Max Field Dry Comp Comp Test of number Test location (R) ( °�u) density moist density spec result status test (pci) ( %) (Pcf) ( %) ( %) 1 9/1/06 BC1 1 SW Coral Street south improvement (6+00) 11 FG 1 I 130.8 1 6.011 127.511 95 98IIPassed 9/1/06 1 BC2 ISW Coral Street south improvement (7 +00) I FG I 11 130.8 7..ii 127.11 95 9711Passed 1 9/1/06 BC3 ISW Coral Street south improvemcnt(7 +95) 1 FG11 130.811 4.71 130.11 95 1 1001 Passed' 111/15/06 BC4 1 SW Coral Drive south improvement (8 +00) north FG 11 I 133 61 8.9 I 128.411 9511 96 'Passed 111/15/06 BC5 1 SW Coral Drivc south improvement (6+00).h ®I I 133.6 1 8.3 I 13331 95 I 100 'Passed 111/15/061 BC6 ISW Coral Drive south improvement (9+00) south Ea a 133.6 1 7.111 129.51 45 I F 9711Passed 1 1 . 1 1/15 /061 BC7 1SW Coral Drive south improvement (7 +00) south /1 MO 133.611 7.91 131.41 95 1 98 Passed' 110 /12/06 DTI 11Strom drain manhole stationing (1 +15) 1 4171 124.7 10.4 123 911 951L 991 Passed 10/12/06 DT2 1 Strom drain manhole stationing (1 +90) 1 -1171 124.7 I 9.8 1 121.211 9511 9711 Passed 110/13/061 DT3 'Storm drain stationing (2 +00) . LL Gil 1 124.711 10.211 119.911 95 I 9611Passed I 110/13/061 DT4 11 Storm drain stationing (2 +50) I E1 124.7 9.711 121.91 95 98 Passed' 110/13/06 DT5 1 Storm drain stationing (3+00) I FG 7 124,Z]I 10.4 1 118.911 951 95 1Passed 1 8/18/06 1 LF1 1 30' from south edge /25' west from east end I +2 1 Ir 107 : 6 I 12.9 I 104.211 9011 97 IF.74i 8/18/06_1 LF2 1[30' from south edge /100' west from east end 1 +2 1 1 107.6 1 13.21 102.3 90 I 95 'Passed 1 8/18/06 I LF'3 130' from south cdge /160' west from east end 1 r I 107.611 14.011 103.31 0 I 9611PassedI 1 3/18/06 LF4 1'30' from south edge/220' west from east end I +211 ' 107 61 14 6 1 106.8 (1 901 99 Passed 1 8/18/06 LF5 1130' from south edge /285' west from east end 1 +2 107.6 - 13.9 99.4 I 90 92' Passed 8/21/06 11 LF6JI 100' from south edge/35' west from east end 1 +2 1 1 107.6 1E91 98.111 90 1 91 IPassedI 8/21/06 1 LF7 1100' from south edge /110' west from east end 11 +2 n 107.611 15.611 100.7 1 9011 9411 passed I 1 8/21/06 1 LF8 1100' from south edge /175' west from east end 1 1i 107.6 12.11 103.1 77,11 961 Passed' 1 8/21/06 LF9 11100' from south edge /235' west from east end ®E 107.6 14.6 98.9 1 90 1 92' Passed, 1 8/21/06 LF10 1 100' from south edge/280' west sfrom east end +2 n 107.6 1 13.911 97.611 901 91 'Passed 1 8/22/06 1 LF11 1 25' from south/25' west of east end 1 +4.5 I 1 107.6 Ep I 105.711 90 98i1 Passed 8/22/06 I LF 12 125' from sou th/70' west of east end 1 1 107.61® 99.4 90 1 9211 Passed 1 1 8/22/06 1 LF 13 125' from south/ 150' west of east end 1+4.511 1 107.61 13.11 102.J [ 9011 951 Passed' 1 8/22/06 117_,F14 1185' from south/35' west of east end 1 +4.511 I 107.61 14.6 106.4 I 90 1 991 Passed' 1 8/22/06 LF ] S 1185' from south/75' west of east end +4.511 107.61 12.9 1 98. di 901 91 Passed 1 8/22/06 I LF16 185' from south/145' west of east end +4.51 107.6 1 13.4 I 100.71 90 94 'Passed 1 8/24/06 1 LF17 35' from south /170' west of east end -F4711-11-107.6 1 16.4 I ]00.11( 90 1 93 Passed 1 1 LF ! 8 35' from south/225' west of east end 11 1 1I 107.611 15.9 104.811 90 1 971' Passed I 8/24/0611 LF19 135' from south/270' west of east end 1+4.511 107.61 13.61 103.11 90 9611 Passed 8/24/06 11 LP20 195' from south/ 175' west of east end 1 1 107.611 17.11 102.21 90 1 95 Passed' 8/24/06 11 LF2' - 95' from south/230' west of east end 11 +4 5 11 1 107.61 14.61 99.4 . 1 90 1 92 'Passed' 8/24/06 II LF22 195' from south/280' west of east end I +4.5I I 107.61 14.0 101.0 90 94' Passed httD: // 192 .168.0.1 /¢eonacific /admin/view soil summarv.D1 12/13/2006 Dec. 13. 2QQ6F12:3QPMDensityTests No. 82Q9 PaP. 3/6'2 1 10/6/06 11 ST1 IlSanitary sewer manhole stationing (1.35) 11 -Ill II 124.711 8.611 122.411 9511 9811Passed1 1 10/6/06 11 ST2 i1 Sanitary sewer manhole stationing (2 +20) II II 124.2 124.7 9.21 1 95 I 1001 Passed' 10/6/06 ST3 Sanitary sewer manhole stationing (3 +00) I E iI 124.7 8.41 120.211 951 9611PassedI 1 10/6/06 11 ST4 (Sanitary sewer manhole stationing (4+00) II 124.7 7.8 1 122.4 1 95 1 9811 Passed Go back to ttmjask select page for Coral Commons Go back to tl,roject select gage htt1i :// 192 .168.0.1 /geopacific /admin/view soil suxmnarv.pl 12/13/2006 Dec. 13. 200412:30PMunimary No. $209 PaP, 4/62 • Field Soil Inspection Summary Project: Coral Commons Job number: OR 06 -9861 Project address: Coral Street east off Greenburg Rd. Tigard Daily Reports 8/15/06: GeoPacific technician, Jason Burgess, was on site to look at removals of undocumented fill. When on site on 8/9/06 contractor had the whole site stripped and removed. Potholed into on site undocumented fills_ Found heavy organic soils on the southwest corner with concrete chunks. Four feet of removals will be necessay towards the south sloping to less at the north. When on site today contractor has removed fill on 115'X 115' square in the southeast corner. Also southwest next to existing concrete block wall, 50'X 115' deep. Soils have been taken down to native, orange brown sandy silt, native soils, are very most and a little soft. Contractor is going to let bake out for at least another day. Fill soils consist of a very gravelly brown silt and a dark brown more organic clayey silt, have stated that they will get a good mixture when reusing. 8/18/06: GeoPacific technician, Jason Burgess, was on site to look at removals of undocumented fill removals in project. Area that has been removed is about 100 feet east to west and about 70 feet north to south. Approximately middle of the project, towards the north half, bordering Coral Street. All organics and unusable soils have been removed, most soils are reusable and have been stockpiled to blend and place back as engineered fill. Native soils have been exposed, stained blue from organic soil, have probed medium stiff to stiff and moist. A day or two of baking in the sun will stiffen up for placement of fill. 8/21/06: GeoPacific technician, Jason Burgess, was on site to look at removals of undocumented fill. The back half, 120' from the east up to digout on the west. Contractor has removed down to stained native orange brown sandy silt. They have also been sorting clean fill materials from organics. Organic non - usable soils have been hauled off site. Subgrade soils are ok for placement of engineered fill. 8/30/06: GeoPacific technician, Ryan Nelson, was on site for a proofroll of subgrade on SW Coral Street found soft spots at 8 +30 and 6 +25. Contractor must repair prior to paving. Full water truck was used, all other areas showed minor to no deflection. 11/3/06: Geopacific technician, Jason Burgess, was on site to look at subgrade soils on SW Coral Street. Half street improvement is on the south side, contractor already cored some for the curbline. Native orange brown sandy silt is probing medium stiff to stiff. Rock section is thick already, contractor is overexcavating a couple more inches just to be safe. Have also had contrator take out a bit more in some spots. Soils are competent for placement of rock. 11/15/06! GeoPacific technician, Ryan Nelson, was on site for a proofroll on baserock on Sw Coral Drive south improvement. All area of road showed minor to no deflection. Full water truck was used. SW Coral Drive is passing 95% of a standar proctor and is ready for asphalt. 11/30/06: Geopacific technician, Jason Burgess, was on site for a proofroll of east and west parking areas. Rock section specified was only 2 inches under 6 httu :// 192 .168.0,1 /eeonacific /admin/view soil field report.nl 12/13/2006 Dec 13. 2006 30 Nummary No. 8209 PO. 5/6F2 inches of concrete. Contractor added more rock than was specified. Rock is oversaturated with a thin layer of muck underneath. Have had contractor pull out some of the worst soft spots, approximately 12. However, with this thin of rock section and it being wet weather season grade, may not hold up to heavy vehicles. An overexcavation should have been applied. Go back to the task select page for Coral Commons Go back to the project select page http:/ /192 .168.0.1 /geopacific /admin/view soil field report.pi 12/13/2006 Dec 13. 2QQ61 Density Tests No, 8209 1 ' � 1 3 6/6r i Summary of Field Asphaltic Concrete Density Tests Project: Coral Commons Job number: OR 06 -9861 Project address: Coral Street east off Greenburg Rd. Tigard Page #1 Rice density: 153.4 Marshall value: Method of test: Indirect Serial #: 37545 Description: "B" Mix from Brix Coffee Lake Date In Compac Test Lift - of number Test location auna place test density tion 11/16/06 I 1 [w Coral Drive south improvement (9 +00)1 11 140.91 91.9 11/16/06 2 SW Coral Drive south improvement (8 +00) 11 139.5 91.0 11/16/06 3 SW Coral Drive south improvement (7 +00)1 1 140.9 91.9 11/16/06 I 4 SW Coral Drive south improvement (6 +00) 1 140.71 91.7 Page #2 Rice density: 151.2 Marshall value: Method of test: Indirect Serial #: 37545 Description: "B" Mix from Brix Coffee Lake Date Test Lift In Compac of number Test location number place - test density tion 1 11/16/06 1 ISW Coral Drive south improvement (9 +00) 21 139.9 92.5 11/16/06 r 2 SW Coral Drive south improvement (8 +00) 2 139.2 92.1 `11/16/06 3 II SW Coral Drive south improvement (7 +00) 2 140.2 92.7 111 /16 /06 4 SW Coral Drive south improvement (6+C))11 2 140.7 93.1 Go back to the task select page for Coral Commons Go back to the project select page http://192.168.0.1/geopacific/admin/view_asphalt_ summary.pl 12/13/2006