Report QAA&V 1 46
(76:1"‘4' /O8 � 7409 SW Tech Center Dr. Ste. 145
Tigard, OR 97223
Ph: 503 -443 -3799 Fax: 503- 620 -2748
nr
SPECIAL INSPECTION
• FINAL REPORT
NIE
DATE: 09/13/2005 fke
PROJECT: Oak Tree 11 Apartments SEP 2095
PERMITS: �
04,61,62,b3,6�1,6.5,6fi OF ,GA
ADDRESS: SW 108th G11Y ROPI
CITY: Tigard STATE: Oregon 5 0 L� \NG, D`vIS
JURISDICTION: City of Tigard
CITY: Tigard STATE: Oregon
ZIP: 97223
Re: Final Letter
To Whom It May Concern:
ACS Testing, Inc. attest that all inspections for Reinforced Concrete, Anchors and Welding was
performed to the best of our knowledge on the above referenced project, in accordance with approved
plans, specifications, RFI's and the applicable codes and standards of section 1701 of the Oregon State
Structural Specialty Code.
Approved b :1 C L/.4
Pln Y 1
Bob Brown
President
•