Loading...
Permit 4 CITY OF TIGARD MECHANICAL PERMIT COMMUNITY DEVELOPMENT PERMIT #: MEC2006 -00551 TIGARD 13125 SW Hall Blvd., Tigard, OR 97223 503.639.4171 DATE ISSUED: 11/9/2006 PARCEL: 1 S135BC -00700 SITE ADDRESS: 10795 SW CASCADE AVE ZONING: I -P SUBDIVISION: LOT: JURISDICTION: TIG Project Description: (2) grilles and (1) fan relocated. CLASS OF WORK: ALT FLOOR FURN: EVAP COOLERS: TYPE OF USE: COM UNIT HEATERS: VENT FANS: OCCUPANCY GRP: B VENTS W/O APPL: VENT SYSTEMS: STORIES: BOILERS /COMPRESSORS HOODS: FUEL TYPES 0 - 3 HP: DOMES. INCIN: 3 - 15 HP: COMML. INCIN: MAX INPUT: BTU 15 - 30 HP: FIRE DAMPERS ?: 30 - 50 HP: REPAIR UNITS: GAS PRESSURE: 50 + HP: C ODSTOVE FURN < 100K BTU: AIR HANDLING UNITS LO DRYERS: FURN > =100K BTU: <= 10000 cfm: OTHER UNITS: > 10000 cfm: GAS OUTLETS: Owner: FEES AMB PROPERTY L P Description Date Amount BY TRAMELL CROW NW INC 8930 SW GEMINI DR [MECH] Permit Fee 11/9/200€ $72.50 BEAVERTON, OR 97008 [TAX] 8% State Surcha 11/9/200€ $5.80 Total $78.30 Phone: Contractor: OREGON HEATING & AC(125185) PO BOX 397 DUNDEE, OR 97115 REQUIRED ITEMS AND REPORTS Contact #: PRI 503- 538 -2953 FAX 503 -537 -2172 Reg #: LIC 125815 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore. Specialty Codes and all other applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow rules adopted in the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0100. You may obtain copies of these rules or direct questions to OUNC by calling 503.246.6699 or 1.800.332.2344. j/17 Issued By: 9 / , Permittee Signature: Call 503.639.4175 by 7:00 a.m. for inspections thaf business day. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit App1i ?Ai. R i ELVES FoR OFFICE USE .ONLY Rece Ci of Tigard b Permit N. 6 L , bS ! 7 tY g Date/By. 4 6 �/ .' - d '1 13125 SW Hall Blvd., Tigard, OR 97 . t 1t 0 a 2006 Plan Review III C ' " Phone: 503.639.4171 Fax: 503.598. .. 1 0 - - Date/By Other Permit: T I G`A R D Inspection Line: 503.639 CITY OF TIGARD Date Ready /By: luris: El See Page 2 for Internet: www.tigard or.gov Notified/Method: • Supplemental Information • BUILDING DIVISION TYPE OF WORK COMMERCIAL FEE* SCHEDULE — USE CHECKLIST ID New construction Addition/alteration/replacement Mechanical permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ❑ Demolition ❑ Other: mechanical materials, equipment, labor, overhead, and profit. , CAT EGORY OF CONSTRUCTION Value: $ f . 20,,/ RESIDENTIAL EQUIPMENT / SYSTEMS FEES* ❑ 1- and 2- family dwelling , Commercial /industrial ❑ Accessory building For special information use checklist. ❑ Multi - family ❑ Master builder ❑ Other: Description I Qty. I Ea. Total JOB SITE-INFORMATION AND LOCATION n Heating /cooling (9 795 9 C /'� �Q Air q conditioning or heat pump Job site address: e 1 7 /'{� �J�l�r+"r j (requires site plan showing placement) 14.00 City /State /ZIP: 1 j� 1r19 CV/ Furnace 100,000 BTU (ducts/vents) 14.00 ' "° Project name: / II Furnace 100,000+ BTU (ducts/vents) 17.90 Suite/bldg. /apt. no.: �d 1�v `/1 /a Gas heat pump 14.00 Cross street /directions to job site: Duct work 14.00 • Hydronic hot water system 14.00 6 Residential boiler (radiator or hydronic) 14.00 • Unit heaters (fuel -type, not electric), in -wall, in -duct, suspended, etc. 10.00 Flue /vent for any of above 10.00 Subdivision: Lot no.: Other: 10.00 • Tax map /parcel no.: Other fuel appliances • DESCRIPTION OF WORK Water heater 10.00 gi -- n Gas fireplace 10.00 /1✓ 1 - Flue vent for water heater or gas �// fireplace 10.00 2 q v l/i ,kli _c Log lighter (gas) 10.00 ( r � //-i'(& L i 7 "d Wood/pellet stove 10.00 ( 7 Wood fireplace /insert 10.00 ❑ PROPERTY .OWNER " ❑ TENANT Chimney /liner /flueivent 10.00 Other: 10.00 Name: Environmental exhaust and ventilation Address: Range hood/other kitchen equipment 10.00 City /State /ZIP: Clothes dryer exhaust 10.00 Single -duct exhaust (bathrooms, . Phone: ( ) Fax: ( ) toilet compartments, utility rooms) 6.80 • ❑ 'APPLICANT ❑ CONTACT PERSON Attic/crawlspace fans - 10.00 Other: 10.00 Business name: Fuel piping • Contact name: $5.40 for first four; $1.00 for each additional Address: Furnace, etc. Gas heat pump City /State /ZIP: Wall /suspended/unit heater Phone: ( ) Fax: : ( ) Water heater Fireplace E - mail: Range CONTRACTOR Barbecue 04/149„) /�j Jn,� j � Clothes dryer (gas) • Business name: 1 ( / Other: Address: j' ,/J 7 MECHANICAL.PERMIT FEES* City /State /ZIP: / � (, � ?f15 Subtotal (/ ) ec t ak, Z f Fax: d "3) 5 '24 7 Minimum permit fee ($72.50) Phone: 7' Plan review (25% of permit fee) CCB lic.: / L _ , (J 402-/".3 /0S/ State surcharge (8% of permit fee) 7/ /J / TOTAL PERMIT FEE ', 3(� Authorized signature: / C e. l This permit application expires if a permit is not obtained within 180 1, LL days after it has been accepted as complete. Print name: G Ll J� L , Date: (t 9 U, • Fee methodology set by Tri- County Building Industry Service Board l:\ Building \Permits\MEC- PermitApp.doc 04 /06/06 44 -461 T(11 /02/COM/WEB) Mechanical Permit Application - City of Tigard Page 2- 'Supplemental Information ' Commercial Fee Schedule: • Total Valuation: Permit Fee: $1.00 to $2,000.00 Minimum fee $72.50 $2,001.00 to $5,000.00 $72.50 for the first $2,000.00 and $2.30 for each additional $100.00 or fraction thereof, to and including $5,000.00. $5,001.00 to $10,000.00 $141.50 for the first $5,000.00 and $1.80 for each additional $100.00 or fraction thereof, to and including $10,000.00. $10,001.00 to $50,000.00 $231.50 for the first $10,000.00 and $1.35 for each additional $100.00 or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 $771.50 for the first $50,000.00 and $1.25 for each additional $100.00 or fraction thereof, to and including $100,000.00. $100,000.01 and up $1,396.50 for the first $100,000.00 and $1.10 for each additional $100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. • • 1: \Building\Permits\MEC- PermitApp.doc 12/30/05 2 CITY OF TIGARD BUILDING DIVISION PERMIT #: MEC200&00551 13125 SW Hall Blvd., Tigard, OR 97223 DATE ISSUED: 11/9/2006 Phone: (503) 639 -4171 A v m�m l�'t Inspection Requests (24 Hrs.): (503) 639 -4175 INSPECTION WORKSHEET FOR DATE: 11/16/2006 TIME: .7 :00AM PAGE: 49 SITE ADDRESS: 10796 SW CASCADE AVE CLASS OF WORK: SUBDIVISION: LOT #: TYPE OF USE: PROJECT NAME: PORTLAND VINEYARD CHURCH DESCRIPTION: (2) grilles and (1) fan relocated. OWNER: AMB PROPERTY L P, PHONE #: CONTRACTOR: OREGON HEATING & AC(125185) PHONE #: 503-538 -2953 Inspection Request Scheduled For: Date: 11/16/2006 Pour Time: Code # Inspection Description Confirm # Contact # Message 699 Mechanical final 039860 -01 503 - 849 -8162 N Corrections /Comments /Instructions: PASS ❑ PARTIAL APPROVAL n CANCEL ❑ NO ACCESS FAIL n CALL FOR INSPECTION ❑ ADDITIONAL FEES ASSESSED (l Inspector: Date: kto Phone #: (503) 718 - •