Loading...
Report AUG -25 -2008 MON 09:40 AM CARLSON TESTING INC, FAX NO, 5036840954 P, 02 77 1 • . BOO M Salm Of re BakOIRle Carlson Testing, Inc. SIYlywlk. 4UAUlLntmnAl, AYU:SOB Rttcy Rd lll! 1 l Tli +1, OR ➢7723 nR'�7AD! Bak 17 89778: Plana (5031 eA4d460 Plums; rS03) 530 - 19SY Plan.. 040 ])0 -91Si Construction Materials Testing & Tns•ectton Par 003)68441934 Fnr: (SO))YRU•/YUU Far(SeJ /Jraa,e3 Special Inspection FINAL SUMMARY LETTER August 22, 2008 T0509634.J City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Canterbury Place Phase 2B — Building 32 .4-8.799 SW Canterbury Lane — Tigard, OR ( Permit No.: BUP2005 -00283 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International. Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Cast in Place Anchors and Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. ZW. Project Manager SWL /rc cc: Polygon Northwest Co — Dana Hunt City of Tigard Building Division — Hap Watkins CT Engineering — Todd Eaton Milbrandt Architects — Bob Weible