Report SEP -21 -2007 FRI 02:38 PM,CARLSON TESTING INC, FAX NO. 503;840954 P. 02/02
6
Main QWn• Sele,,.Office Mid OLlr'
Carlson Testing, Inc. 4r ,, ,'ur,,,,_,., JOfiw ry {ll.S Pm. ftdull
Bend, u
T ttnrrl Olf 4J p!t 97!01 t MIC
PlnunC (NM) ‘1,144.101 Haw: (;n+ /,r,vu.ls: thin, rrau!3(1.'),x3
h},e: 110i1 0144414 ,1031 5.0.110P bar t7J1l .1i0.! r7
Construction Materials Testing & inspection
Special Inspection
FINAL SUMMARY LETTER
September 21, 2007
T0509634.P
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Canterbury Place Phase 2B — Building 27
7/3 1-0 - 7119 - SW Canterbury Lane — Tigard, OR
Permit No.: BUP2005 -00286
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only, Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
t ven W. each
Project Manager
SW L /tm
cc: Polygon Northwest Co — Dana Hunt
CT Engineering — Todd Eaton
Milbrandt Architects — Bob Weible