Report ,1laia Office Saler,. _�nre Bead Offrre
Carlson Testing, liP 1II' ( iev Non O0 S iii 6302 OR Br1�0 Rd`II
1 \7 Inc. 11■ 1■ Tear d OR 9, - "3
Salem OR 97_rr)! H, ad OR 97702
Phone (= 0316�d -3160 Yhwic. I�03J T: 9 -1_' ±` Phone 15-lO 330-9155
l en x3031694 -0930 Fru. r'0 +15,99.1309 Fin (011330.9I&'
Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER
November 27, 2007
T0509634.0
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Canterbury Place Phase 2C — Building 26
10797 SW Canterbury Lane — Tigard, OR
Permit No.: BUP2005 -00284
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
teven W. Leach
Project Manager
SW L /eah
cc: Polygon Northwest Co — Dana Hunt
CT Engineering — Todd Eaton
Milbrandt Architects — Bob Weible