Loading...
Report Carlson Testing, Inc. Maim Hudson 63025 OR Rdkll T igard OR 97223 P Salem. OR 3) Phone 589 -1252 Rend. OR 97702 Phone : (503) 681 -3J60 : (503) 589 Phone: (541) 3349155 Construction Materials Testing & Inspection F 5031634-0954 Fax :/50315891309 Fax 1541) 330-9163 Special Inspection FINAL SUMMARY LETTER OFFICE C0 November 22, 2006 T0509633E City of Tigard __,,,, v, T:, 13125 SW Hall Blvd., Tigard, OR 97223 -8199 DEC o 6 2006 Attn: Hap Watkins t':' CITY �-r , ^: Re: Canterbury Place Phase 1B- Building 8 I 4-0613 Canterbury Lane- Tigard, OR D 8� Permit# Bup2005 -00300 Dear Mr. Watkins: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Resp: 1 ully submitted, CA' • N TESTING, I i. J f Steven W. Leac,/ Project Manager SW Uks cc: Polygon Northwest Co- Dana Hunt CT Engineering- Todd Eaton Milbrandt Architects- Bob Weible