Report 12/06/06 WED 08:13 FAX 503 670 9147 CARLSON TESTING Z002
NA. Office Said Carlson TES � eJ3P3Wllu JU601 SE. NM
b 0 tt 16'RdNfl
Testing, Toed OR 9722r Jak,n. OR Y7301 lkMl. ( Oir ld YMra
(503) 681 -3J60 Phave: (50N)360.1272 Phone (5d1) 3509111
For COX 63l4J95J Fur: (5031589 -1309 fit: 154!1330.9167
Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER 1�
December 5, 2006 Or FILE COpy
T0509633A
City of Tigard Building Department
13125 SW Hall Blvd 0
Tigard, OR 97223 -8199 C I �9 ED
Attn: Hap Watkins DEC 0 6 7005
Re: Canterbury Place Phase 1A Building 3 CITY OI=TIGARI)
1;7 .9 ;W Canterbury Lane- Tigard, OR BUILDING DIVISION
Permit# BUP2005 -00280
Dear Mr. Watkins:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
Installation of Adhesive Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
even W. Leach
Project Manager
SWUks
cc: Polygon Northwest Co- Dana Hunt
CT Engineering- Todd Eaton